Work History
Jun 2013 - Present

Senior Electrical Engineer(ISF LKHWIA CAMP)

Advanced vision Qatar.(member of QD-SBG)

Technical office senior engineer , prepare shop drawing , material submittals , review all of it with project specification ,(QCS )QATAR construction , civil defense ,Britsh, NEC ,ANSI Standard.

*LEADING TEAM CONSIST OF 3 ENGINER & 5 DRAFT MEN .

*PREPARE METHOD STATMENT.

* PRPARE ITP FOR HOLE PROJECT.

FOLLOW THE PROCURMENT PROCEDURE FOR MATERIALS.

 

Jan 2012 - Jun 2013

​Senior Electrical Engineer (DUKHAN HIGH WAY)

​Advanced vision Qatar.(member of QD-SBG)

Technical office senior engineer , prepare shop drawing , material submittals , review all of it with project specification ,(QCS )QATAR construction , civil defense ,Britsh, NEC ,ANSI Standard.

WORK AS MEP CONSTRUCTION ZONE MANGER .

*PREPARE METHOD STATMENT.

* PRPARE ITP FOR HOLE PROJECT.

PROJECT DETAILS.

Dukhan Road Expressway project.

3,700,000,000.00 QR( Around three Billion, seven hundred million Qatar Riyal.

CLIENT :  Asghaal.(government)

CONSULTANT : PARSON

Advanced vision ( part of Saudi Ben Laden group)

 

Dukhan Road

 

This is a major project consisting( 14 no`s Substation of indoor 6 no’s , outdoor 3 no’s, package 5 no’s) , installation 13,821 KM of 132 kv cable , 58,014 KM of 66 kv cable ,57,655 KM cable of 11 KV-street light 40 KM cable & high mast light pole,22 no’s feeder pillar, under pass lighting , Flyover.

Jan 2010 - Jan 2012

Electrical project engineer

ACC

           

:

Al UDEID AIR BASE RPROJECT  

Project amount

:

200,234,000.00 QR( Around Two hundred million and Two hundred Thousand Thirty Four   Qatar Riyal.

Client

:

Qatar EmirI Army Forces

Consultant

:

White Young Qatar.

 

 

 

Duration

 

Nov 2010 to jan 2012

Location

 

 

Al Udeid      

 

Project Summary

 

 

 

 

 

 

 

This is a major project consisting ( 15 NO`s Sub Station(11KV SwitchGear,22 NO`s 1600 KVA Transformer, 22 no. Mv-Panel with 55 km of 11 kv cable network ,Under ground, security fence light OF 31 KM, street pole light,9 KM street light , 45 no. car park, 12 bus shelter   12 no. high mast pole light, 16 km runway light also installation of micc cable for light, power circuit using ACS & Black out system .

 

Jan 2008 - Jan 2015

Electrical project engineer

ACC

 

:

MADINA CENTRAL & PARCEL 1,2,3 TOWN HOUSE RETAIL AREA   RPROJECT  

Project amount

 

Duration

 

1,100,681,894.00 QR( Around One Billion hundred million and sixty hundred Thousand eighty one and eight hundred ninety four Qatar Riyal.

2009

Client

:

United   Development Company

Consultant

:

DAR – Dar Al –Handasah Share & Partners.

Location

 

Pearl Qatar

Designer

:

KEO - consulting engineering group.

 

:

 

 

 

Project Summary

 

 

 

 

 

 

This is a major project consisting( 9 NO`s Building, 4 of them residential building contain 4 substations and

2of them hyper mall contain 2 substations, one cinema ,1 mosque ,2 garden contain one substation also it has 500 apartment with 12 transformer , 12 mv panels , home automation system,BMS,telephone ,fire alarm ,meter system ,audio visual system ,central battery

Jan 2007 - Jan 2009

Electrical project engineer

COMMODORE QATAR

Project

:

OFFICE TOWER BUILDING

Project amount

 

Duration

:

65,243,101.00 QRS (Sixty five million and Two hundred forty three thousand and One hundred one     Qatar Riyal.

Sep 2007 to 2009

Client

:

Ali Feta’s El merry

Consultant

:

MZ & Partner.

Location

:

 

Salta qadeem– Qatar.

Project engineer.

 

Project Summary

:

15+3B+GF Floor with total Load 3200 KVA 2Tr ,3 BUSDUCT KBF 1600 A , 7 Sub main Board 52 DB , 6 MCC Panel , Fire alarm ,BMS ,Telephone , Data ,3 no’s chillier each 250 Ton , 31 AHU, 48 FCU ,3 Fire pumps, BMS , Generator FJ Wilson 635 KVA .

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Consultant

Qatar Emirate Army Forces

           

:

Doha Racing And Equestrian Club – package(B)  

Project amount

 

Duration

:

367,681,894.00 QRS (three hundred sixty seven million and six hundred eighty one thousand and eight hundred ninety four Qatar Riyal.

Apr 2005 to sep 2007

Client

:

Qatar National Olympic Committee.

Consultant

:

ASCO consulting engineer.

Follow up committee

:

REC racing equestrian club.

Designer

:

CEG- consulting engineering group.

Location

 

Position

:

Al-Ryan – Qatar

 

SITE ENGINEER

Project Summary

 

 

This is a major project consisting of horse racing stadium(3000 persons) & ( 13 NO`s of horse stable, indoor swimming pool, staff accommodation , smith building , veterinary stable, veterinary clinic , exclusive club , multipurpose hall, , storage building , machine hanger, food court , administration building) with total Load of 4 SUBSTATION(13 Transformer, 62 Sub main board’s ,111 DB , 60 KM Cable length 50 light control panel ,410 pole light , 1050 light switches ,1211 sockets , 32 Ahu,329 FCU, 26 cooling coil, 16 package units , split- window units, 10 chillers with total capacity   3400 ton , fire alarm system, data, telephone system, TV, BMS

Jan 2012 - Present

Electrical Project Engineer

1952 - Present

KBF

KBF
Nov 2010 - Jan 2012

Electrical Project Engineer

ACC/MEP
Sep 2007 - Nov 2009

Electrical Project Engineer

ACC/MEP
Apr 2005 - Sep 2007

Site Engineer

MCC Panel, Fire alarm, BMS, Telephone, Data

Portfolio

Education

Education
2013

BACHELORS

1997 - 2001

BACHELORS

    • dsdsd

Text Section

  • RESPONSIBILITY & DUTIES.

 

        1. Planning: Drawing plans for daily activities in coordination with foremen's to get the job completed as per the planned activities with quality and on time.
        2.  
        3. Scheduling: for the allocation of technicians and helper for the required task on the site for the required activities on the basis of merit and task to get the task completed with the quality.
        4.  
        5. Site Co-ordination: Coordinating with other services contractor to get the work completed as per the prepared coordinated drawings, Shop drawings handed by the project engineer. Studying the drawing with respect to site condition and discussing the lop holes with the project engineer to eradicate it initially to get the work moved smoothly.
        6.  
        7. Site Supervision: Supervising each and every activity on site for smooth flow of work, incase any difficulty is directly reported to project engineer to get it solved through proper channels. Preparing material status report on daily basis to get the idea for the material requirement on site.
        8.  
        9. Motivation: involves motivating the staff and understanding their requirement and passing it to higher management for necessary steps.Design experience:                      - Distribution Board Design             - MV –Panel Calculation.                                          - Small power outlet distribution               - Cable to suite load
        10.                - Light Fixture Distribution
        11.              - Fire Alarm Design.
        12.               - Sub Main Board Design.
        13.               - Power Single Line Diagram design.
        14.  

               - Cable tray design.

 

     Technical office experience:

                   -high ability to finish the shop drawings.

                   - high ability to finish all material submittals.

                   - make all material purchasing orders.

                   - follow up the team.

                   - All required RFI and check the critical points in early stage in the project.

                   - Contractually letters.

 

     Execution experiences :

                -high ability to deal with all people types and nationalities.

                - use paper work to make every thing clear with the management and with the division

              - follow up the work on the site(foremen , technicians, etc….) by use daily report for each group and estimate the work from the morning .                    

                 - solve any technical matters on the site immediately.

                 - follow up all material status regular with the store keepers and foremen

                   To avoid any material shortage to maintain the work rate as planned.

                 - Attendance of meetings.

                 - all paper works ( inspections , work release , etc..)

                 - handing over the works.

                 - make the bill.

Skills