Download PDF

Work History

July 2018Present

Engineer - Projects

Archer Daniels Midland Company

Currently working on many projects involving Growth projects, Facility upgradation projects, Projects related to Safety & Environment, Payback projects etc..

Summary of my work involves:

Planning, execution of nearly 15 different projects valuing more than 10 Million USD and ensuring all the projects be completed in State of art with respect to Technology, Safety, Automation and having a vision for Future expansion.

Execute the project as per the scheduled time line and ensure all the deadlines are met. Preparation of Gantt Charts, Reports, Budget tracking. 

Preparing Control Narrative for automation, Theory of Process, P&ID's, SOP's, Work instructions, HAZOP and LOPA study, Instrumentation and many other things required for the Commercial run of the plants those are being established.

Commisioning of new plants and deal with all the issues during the process and handover the plant for Commercial production with desired quality of the product.

Ensure all the information for each and every project reaches to all the stakeholders of the project and keep the communication updated.Managing the tasks with people involved in various stages of project starting from Planning, Budgeting, Execution and Commisioning. Conduct project lookbacks after certain period of commercial run of the plant.

 

July 2017July 2018

Graduate Engineer Trainee

Archer Daniels Midland Company

Worked in Solvent Extraction, Refinery, Boiler departments of Edible Oil Processing plant of Soy Bean, Sunflower and Cotton seed.


Summary of my work include:
Monitor Processes and ensure Production and Product is in compliance to set Quality Standards and Specification. Implement and ensure compliance to Company Safety standards. Ensure all Environment systems and processes are functioning in accordance to laid down SOPs and permitted parameters. Responsible for productivity to meet the set targets.

Responsible for control and reduction of Equipment Downtime. Planning Preventive and Predictive Maintenance activities (Thermography, Vibration Analysis etc.) and implementing the outcomes. Conducting Root cause Analysis of Breakdowns experienced. Conducting FMEA of Critical Equipment for Identifyig risks and reducing them.Train Operators and other reporting staff by updating them with technology and to meet changing needs of company.

Handling Shift Operations, Maintenance and Man power Allocation in shifts. Changing the Process conditions to acheive the Quality standards as per the Quality of Raw Material.Preparing SOPs for all the activities in Plant and P&IDs of processes in plant using AUTOCAD. 

Handled Maintenance activities in Boiler during Annual Maintenance by scheduling all the Maintenance works and completed them in deadline. Worked on process Improvements and increasing the efficiency of equipments would lead to lot of savings to the company.

May 2016June 2016

Summer Intern

Zydex Industries

Project: Designing the Process equipment.
Mentor: M. Saravanan, General Manager, Projects. 
Description: Worked on Designing the insulation required for Fentamine Storage Tank, Calculating Steam requirement in Hot Water System, Benefits of using Structured packing over Random packing in Polyester production and Designing an Evaporator as per their requirement.

Studied the process of producing Polyester and Emulsion Paints

May 2015June 2015

Summer Intern

Dr. Reddy's Laboratories

Project: Increase the efficiency of distillation column.
Mentor: M. Venkata Swamy, Team leader, Continuous Improvement cell.
Description Worked on Butanol-Water and Acetone-Water separation systems using Hybrid Technology of Conventional Distillation process and Membrane separation Techniques to acheive higher separation efficiencies which could make lakhs of savings to the Company with a Short Pay Back period for the Investments to be made for process changes.

Studied the processes involved in Distillation. Studied various membrane processes and the principle behind membrane separations.

Education

20132017

BACHELORS

Visvesvaraya National Institute of Technology

Chemical Engineering with CGPA of 7.82

Worked on Effluent water treatment of Food Industry using Microfiltration, Ultrafiltration, Reverse Osmosis, Ultrasonfication methods

20112013

SENIOR SECONDARY

Sri Chaitanya Junior College

Class 11 & 12 in Science group with 97.2%

2011

SECONDARY

Indira Gandhi Memorial Senior Secondary School

Class 10 in ICSE board with 85.14%

Achievements

  • Elected and Worked as General Secretary for Department Council in year 2015-2016 during graduation.
  • Worked as Technical Secretary for Department Council in year 2014-2015.
  • Worked as Hostel Secretary in year 2013-2014.
  • Ranked in top 1 percentile among students participated in JEE Mains 2013.