- Yanbu Industrial City, Saudi Arabia
- +966567080308
- [email protected]
Involved in the debottlenecking activities of the plant (from 350,000 tones/year to 700,000 tones/year). Main activities during debottlenecking stage were to create punch lists, and to assure that all piping and the equipments are installed as the P&ID, working with a team in (PHA) Process Hazard Analysis for the plant, reviewing the (SOP) standard operation procedure, inspecting some of the modified equipment, working in applying APC with process control department, and conducting function test and reviewing the logic for all the systems in the PTA plant.