Thanos Xenos

Work History

Work History
Sep 2013 - Present

Project Manager

AKTOR SA
Egnatia Motorway S.A. (Egnatia Odos S.A.) Mechanical and Electrical Installations of the Tunnels and Road Lighting of the Interchanges for the Project "Koromilia - Ieropigi - Kristalopigi" part of the Vertical Axis of Egnatia Motorway from Siatista to Kristalopigi. Koromilia Tunnels: Total tunnels length: 1.000 m Kristallopigi Tunnels: Total tunnels length: 1.100 m
May 2013 - Dec 2014

Project Manager

AKTOR SA
FIDIC RED Book Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer: Mechanical and Electrical (M&E) Tunnel Works for the Project: Construction of New Motorway section Demir Kapija - Smokvica as Part of the Pan-European Corridor X. - Tunnel T1: Left Bore: 1275 m., Right Bore: 1215 m. - 2490 m. - Tunnel T2: Left Bore: 1155 m., Right Bore: 1295 m. - 2450 m. - Relocation of Overhead Power Lines to facilitate the construction of the New Highway, - New Medium Voltage (10 kV / 20 kV) Overhead Power Lines for the Power Supply for the two Tunnels (T1&T2).
Apr 2013 - Mar 2014

Operation and Maintenance Manager

AKTOR SA
Krrabe Tunnel opened to traffic on March 25th 2013. It is a twin bore tunnel of 4.9km in length with a height clearance of 5,25m. -Set-up the Operation and Maintenance Manual, -Train a Team of 50 as the O&M Team, -Managing and Operating The Motorway Traffic Control Centre, -Tunnel and Open Road Traffic Management, -Tunnel safety management, -Emergency and Contingency planning, -Equipment and infrastructure inspection and maintenance.
Jul 2012 - Mar 2013

Project Manager

AKTOR SA
Design and Construction of the new Medium Voltage (20kV) Overhead Power Lines for the Power Supply for the Krrabe Tunnels in the Road Section of Tirana - Elbasan from the Public Power Grid from two separate feeders from the Elbasan Power Station. Relocation of Overhead Powerlines of HV (400kV, 220kV, 110kV), MV (35kV, 20kV, 10kV, 6kV) of Public Power Grid and Installation of New Overhead Power Lines HV, MV to facilitate the Construction of the New Road from Tirana to Elbasan. -Financial and Time Management of the Project; -Managing a full site team of Construction engineers; -Managing Design Team; -Leading project meetings; attending all client meetings; -Leading meetings with Power Corporation of Albania; -Stakeholder management.

Education

Education
2010 - 2010

Master of Business Administration (M.B.A.)

University of Warwick - Warwick Business School
2007 - 2008

Degree

Universidad de Salamanca
Diploma de EspaƱol como lengua Extranjera (D.E.L.E.)
2002 - 2003

Master of Science (MSc)

University of Brighton
Master of Science (MSc) in Product Innovation and Development - Distinction
1998 - 2002

Bachelor of Engineering (BEng HONS)

University of Brighton
Honours Degree in Mechanical Engineering

Skills

Skills

M & E Projects

Mechanical

Construction

Construction Management

Project Management

Certifications

Certifications

Certified Engineer for Mechanical Installations

Certified Engineer for Electrical Installations

P.Eng. - National Register of Contractors Experience and Supervision of Technical Occupations (MEK)

Chartered Mechanical Engineer (CEng, TEE)

Lead Auditor ISO 9001

Advanced Project Management in Primavera P6

Project Risk Management Professional Preparation Course - RMP PMI

Project Management Professional Preparation Course - PMP PMI

Member of Project Management Institute (PMI)

Chartered Mechanical Engineer (CEng, M.I.Mech.E, UK)