Tauseef Ur Rehman

Work History

Work History
Nov 2012 - Present

Project Manager Telenor Project

ZTE

Project Manager Central - II, Telenor Project responsible for rollout, installation, testing & commissioning of transmission networks & 1860 3G GSM BTS sites. Successfully achieving monthly target of installation and swap of SDR (BTS) & over 200 NEC IPASO micro wave links. Developing and executing the Project Plan with the team and managing the team’s performance. Responsible for communication, including status reporting, risk management, escalation of issues that cannot be resolved in the team, and making sure the project is being delivered in budget, on schedule & within scope.

May 2010 - Oct 2012

Chief Technology Officer

WASEL Telecom
CTO WASEL Telecom- seconded by AG Telecom (member of the Al Ghurair group - www.alghurair.com). Wasel Telecom

Project Director ongoing wireless Projects, Panning, engineering and operations of WASEL Telecom CDMA Network and Systems. Network expansion plans, finalization of technical proposals, development of Performance Measurement Systems, Capacity Management systems and KPI monitoring system for the network deployed. Providing guidelines and technical support for the development of Operational Support systems.

Sep 2006 - May 2010

Project Director (North) wireless Network Islamabad Pakistan

PTCL
Installation, testing and commissioning of Rev-B BSC & BTSs.Technical site survey of over 100 CDMA BTS sites.Monitoring build out activities at various BTS sites, Tower foundation, erection activities & BTS equipment installations etc. Conducting weekly meetings with vendors to discuss rollout activities and progress.Surprise visits to under construction sites for inspection of quality of work.Installation, testing and commissioning of BTS sites in RTR, AJK , FTR & LTR.Load testing & commissioning of Diesel Generators at over 100 BTS sites. Installation testing & commissioning of External Alarm system.Technical Evaluations of CDMA 1x & EVDO Rev-A\B Projects.Using Anritsu’s “Site Master” for the testing of VSWR, DTF & interference from other wireless Networks. Monitoring Installation, testing and commissioning of NEC Micro wave links.Solving call failure, handoff failure and call drop problems.Performed as a Project Officer to monitor build out activities in all the regions, to provide necessary guidance to respective Regional Team Leaders to expedite the rollout activities
Jul 2005 - Sep 2006

Project Manager Wireless Network PTCL

PTCL
Performed as a Project Director to monitor build out activities in all the regions, to provide necessary guidance to respective Regional Team Leaders to expedite their rollout activities.Installation, testing and commissioning of CDMA BTS sites in RTR, AJK, FTR & LTR.Installation testing & commissioning of External Alarm system.Monitoring build out activities at various BTS sites, Tower foundation, erection activities & BTS equipment installations etc. Surprise visits to under construction sites for inspection of quality of work.Using Anritsu's "Site Master" for the testing of VSWR, DTF & interference from other wireless Networks.Solving call failure, handoff failure and call drop problems.Load testing & commissioning of Diesel Generators at over 100 BTS sites
Feb 2002 - Jul 2005

Manager Deployment Wireless Network

ZTE, Pakistan
Conducting weekly meetings with customers & subcon to discuss rollout activities and progress.Surprise visits to under construction sites for inspection of quality of work.Technical site survey, installation, Testing and commissioning of MSC, BSC, PDSN and over 580 BTS.Installation of Feeder cables, sectored antennae on different cell sites. Carrying out drive tests using “CDMA Network Tester and Analyzer” from ZTE. Optimizing the network by removing problem areas like shadowing & interference.Routine O & M work after the commissioning MSC, BSC & PDSN collecting performance data and testing the performance of the system.Analyzing various interfaces of BSC and configuring the system parameters for best performance with least resources.Solving call failure, handoff failure and call drop problems by setting various system parameters and network configuration as well. Hardware and Software up gradation of MSC & BSC and BTS.Using Anritsu’s “Site Master” for the testing of VSWR, DTF & interference from other wireless Networks.Solving the signaling related issues during integration with the other Networks & Systems.Analyzing traffic performance of system & optimizing the system for best available performance.
May 2001 - Feb 2002

Assistant Manager Deployment Landline switching system

ZTE, Pakistan
ZTE, Pakistan

Installation, Testing and commissioning of ZXJ10 switch at various PTCL exchanges.Routine Operation & Maintenance after the commissioning of ZXJ10 switching system.Also worked for ‘Planning department’, and conducted detailed engineering survey and remained involved in network planning and dimensioning of equipment for various PTCL exchanges.

Education

Education
Dec 1995 - May 2001

B.E Electronics

N.E.D universicty