Download PDF

Talal Hussain

Plant Reliability & Project Management Professional

Profile Summary

  1. Works as a Reliability Maintenance Professional for up gradation, revamps and operational maintenance works
  2. Execute various Projects as a team leader of different nature including Oil and Gas , Fertilizer , Refinery etc.
  3. Follow the international standards  of Project Management Process from start to end of all projects
  4. Understand WBS structure , and work with management and project/maintenance team  in the development of work break down structure for progress measurement, scheduling ,cost estimating and project control.
  5. Prepare and manage overall master schedule integrating work breakdown structure using scheduling software.
  6. Cost estimation preparation and schedule bar chart plan considering all in puts (manpower, equipment and materials ) availability, construction sequences.
  7. Develop work method of statement or procedure as required.
  8. Understand and able to utilize planning tools such as Primavera P6,etc
  9. Develop and update resource (manpower and equipment) histogram weekly or monthly as required.
  10. Evaluate allocation of resources and provide recommendations to maintain required progress.
  11. Develop and implement plan versus actual progress charts (histograms/S curves). Reports and analyses deviations from plan.
  12. Track, monitor and forecast progress of all activities and deliverable such as products, engineering documents , fabrication status and construction of all discipline.
  13. Liaises with all team leaders and/or members to communicate required completion dates and interface between functional team/operational team and project team.
  14. Lead meetings ( i.e schedule review meeting , progress meeting, coordination meeting and so on ).

Work experience

August 2017Present

Reliability Maintenance Engineer

Byco Petroleum Pakistan Limited


  • Lead plant pre commissioning activities as per jobs raised by ops including following jobs
    • Manage all material requirements
    • In line all furnaces of Plant with combine stack
    • Heat Exchanger cleaning and box up
    • Replacement of all gaskets to Spiral wound of all fin fan coolers, vessels , columns heat exchangers interconnected piping
    • Hydrotesting of Fin fan cooler
    • Installation of Strainers as and where required
    • Lead all documents like MWR ,JAC etc
    • Manage Valves servicing/ replacement where required

and all misc. jobs related to pre commissioning as required by Ops

  • Manage resources for all commissioning and start up activities
  • Lead and performed more than 6 shutdowns to accomplished timely with quality and safety as per company EHS policy , following jobs performed

    • Followed company permit to work policy and implemented with counseling to team
    • Prepare JSA with Ops and EHS for each critical/ hot work jobs performed
    • Manage and execute all ops raised jobs
    • During the shutdowns synchronized with all departments regarding execution of operation raised jobs of maintenance
    • In role Contractors to performed the tasks on time with management of resources
  • Operational maintenance

    • Synchronize with team shift regarding daily maintenance jobs raised during shift
    • Issue and close all JAC with team for proper documentation and also recorded in SAP raised by Ops and Services at various locations of plants like Plant 1,6,8,9,19,7, RO Plant, MPR, Open channel, Bore Well etc.
    • Month wise PTW and JAC closing documentation
    • In absence of maintenance lead at ORC-I ,performed a lead support to ORC-I and ORC-II
  • Monthly Execution Summary (FRM report)

    • Prepare and submit monthly FRM report including highlight critical jobs of month
    • Graphical representation of MWR raised department wise and plant wise
    • Status of all MWR with proper detail
  • Bid Document
    • Preparation and submission of Bid documents
  • Maintenance Department EHS Coordinator

    • Performed as a coordinator duty to sync all EHS department concern with Maintenance and close all related documents regarding Near miss reports, management safety audits etc .
Jan 2015July 2017

Project & Planning Team Lead

PAK ARAB ENGINEERING (PVT) LTD

Making Technical and Commercial Proposal as per requirement of Job

 Budgeting and costing

 Initiator of EME estimation software focused on mechanical works Direct/Indirect Manpower- Equipment and Consumable Structure Calculation

Identifying Stake Holders including International and National vendors

Make deployment plans, Schedule regarding estimation of Mechanical, Civil, Petro- Chemical communicate with local and foreign vendors/suppliers, material procurement for our various respectable clients like

OMV GMBH Exploration,Fauji Fertilizer Company Limited Goth Machhi Sadiqabad,Fauji Fertilizer Bin Qasim Limited Fatima Fertilizer Company Limited Engro Fertilizer Company Limited,PAK ARAB Fertilizer Company Limited,Pakistan Petroleum Limited,OGDCL,Mari Petroleum Company Limited,Byco Oil Refinery Limited,Sub Contractors Bidding and Contracts Documentation of all quotations

 Give Presentations regarding proposal and month breakup business development

 Make Project plan using Primavera P6/MS Project ,spreadsheet Budgeting based job

 Co-ordinate with client about job execution time frame In-line all safety rules and regulations

Leads all documents

Execute as a Project Engineer

FATIMA FERTILIZER-MECHANICAL EXECUTION OF LPBC'S AT MARI SITE DURING  TURN  AROUND-17

FATIMA FERTILIZER-MECHANICAL EXECUTION OF NATURAL GAS BOOSTER  COMPRESSOR OGDCL UCH -II GAS ANNUAL TURN AROUND-17

FATIMA FERTILIZER -BUNDLE REPLACEMENT JOB OMV KADANWARI -DBN JOB

FAUJI FERTILIZER COMPANY LIMITED GOTH MACHHI - FABRICATION  & INSTALLATION  OF PIPING AT DSP COMPRESSOR  AT MARI SITE

 FATIMA FERTILIZER - MECHANICAL EXECUTION OF NATURAL GAS BOOSTER COMPRESSOR AT MARI SITE

 FATIMA FERTILIZER - MECHANICAL EXECUTION OF LPBC'S AT MARI SITE OGDCL UCH GAS ANNUAL TURN AROUND -16

 OTHER RETROFIT PROJECTS OF REFINERY , OIL & GAS AND FERTILIZER SECTOR

 Responsibility includes as follows

Planning and Defining Scope Activity Planning and Sequencing Resource Planning

Developing Schedules

Time Estimating Cost Estimating Developing a Budget Documentation

Creating Charts and Schedules

Risk Analysis

Managing Risks and Issues Monitoring and Reporting Progress Team Leadership

Strategic Influencing Working with Vendors Controlling Quality Benefits Realisation

0ct-2014Dec-2014

Project Manager

Sanitary Master Engineering

Fauji Meat Limted Project


Make schedule and plans concern to project total execution work

Execute job according to client instructionsControl total expenses related to daily job and outdoor accommodation

Maintain daily job meetings with client and consultant reference to material mobilization and job execution

Over view job drawings with consultant and client

Jan 2014Sep 2014

Project & Planning Engineer

Coating Construction and Mechanical Contractor

PARCO Sludge Cleaning, Grit Blasting and Epoxy Coating of Crude Storage Tank T- 3002 at PS-3

Shikarpur Execute and plan complete civil work of sludge pit

Prepare method statement of complete job as per scope of work

Prepare JSA (job safety analysis) of total job execution

Give plan to execution team for mobilization and execution of job

Control all documents concern to cleaning, blasting and painting of job as per client requirement

K-ELECTRIC Repairing of Demin Water Storage Tank

Estimate total cost of project Give complete plan to execution team with also execute job according to client needs.

Daily progress monitoring and give daily progress report to company head. Control all documents concerned to welding, material, sand blasting and painting. In-line all safety rules and regulations.

BYCO Oil Refinery Turn Around 2014

 Make schedules of all equipments(Air Coolers, Heat Exchangers, Vessels, Columns) for completion in required timeline Manage all team and client required queries

 Co-ordinate with sub-contractors and give plans to them for safe completion of job in required timeline.

 Co-ordinate with client about job execution time frame In-line all safety rules and regulations

 Leads all documents

National Refinery Limited Khi Lube Expansion Project

Execute job concerned to Boiler Economizer tubing

Supervise fabrication of tubing Make schedules to project planning

Leads all document facilitate to daily job progress

Deals with client Ensure all safety procedures

Engro Polymer Pakistan HRSG Economizer MP tubing

Make schedules to project

Make rigging plan Deals with client concerned to job execution plan

Make methodology to job execution

Leads all document facilitate to daily job progress

June 2013 Nov 2013

Piping & Equipment Engineer

Pipe Link Construction Ltd

UEP Naimat West Project

 Execute job concerned to dismantling of AMINE and Dehydration Unit in TURK facility

 Give complete plan to execution team on daily basis related to dismantling from TURK and shifting to Naimat

 Inspect and supervise daily job progress

 Work as a HITRA Team leader ( Hazard Identification Task Risk Assessment ) Inspection & documentation of job

Making Task Risk Assessment ( TRA ) forms concerned to execution

 Ensure marking and cutting of spools and orientations of structures related to equipments

 Co-ordinate with client concerned to journey management of dismantled piping and equipments

 Execute job according to all safety procedures

 Taking charge of all punch list which are related to execution team

 Take a part in Invoice verification

June 2011May 2013

Site Engineer Mechanical

HASTECH Group

 

P&G Multi Line 4 project

 Supervise fabrication in workshop

 Prepare cutting plans for the fabrication of local supplied material

 Execute job at site as per client requirement

 Supervise as a safety officer and make daily job permits and on focus with job execution. Inspect and supervise daily job progress

Taking charge of all punch list which are related to execution team

 Take a part in Invoice verification Control QA/QC documents

Education

20072010

BE Mechanical 

Quaid-e-Awan University of engineering science and Technology

Certifications and Training's

Scaffolding Certifier

Byco Petroleum Pakistan Limited

Scaffolding Certification Training

Root Cause Failure Analysis

SGS Pakistan

1 day Training Session on Root Cause Failure Analysis (RCFA)

Plant Reliability and Maintenance

SGS Pakistan

1 day Training Session on Plant Reliability and Maintenance

HITRA Team Leader ( Hazard Identification Task Risk Assessment )

MAXTRAIN INTERNATIONAL consultant to UEP (United Energy Pakistan)

Control of Work 

MAXTRAIN INTERNATIONAL consultant to UEP (United Energy Pakistan)

PRIMAVERA P6 v8.2

3D Educators Karachi 

AUTOCAD 

Roshi Computer Institute Karachi 

Achievements and Extra Curricular Activities

  • Lead several Youth Development Conferences 
  • Participant of the 2nd All Pakistan Mechanical Engineering Conference At GIK Institute TOPI Swabi N.W.F.P
  • 1st treasurer manager  of ASME(American Society Of Mechanical engineers) QUEST Student Chapter
  • Participate and arrange many youth developing conferences
  • Participant of the 3rd National Conference On “ENERGY RESOURCE OF PAKISTAN: POTENTIAL,UTILIZATION,CONSERVATION & IMPACT ON ENVIRONMENT”
  • Winner of various drawing competitions

Computer Skills 

Primavera P6 v8.2

AUTOCAD 

Ms Office (Project,Excel,Word,PowerPoint,)

Languages

English,Urdu,Sindhi,Punjabi,Siraiki


Personal Information 

Father’s Name:           Syed Kausar Hussain Rizvi

Nationality:                 Pakistani

Religion:                      Islam

PEC registration no :  MECH/26651

Birth date:                   30th may, 1988

Passport number:       BY5175981

C.N.I.C:                           45203-4318598-5

Marital Status:            Single

Reference

Will be provided if required