Work History

Work History
Jan 2014 - Oct 2015

Project Engineer

PT. klm maju jaya shipyard
  • Assist and report to project manager.
  • Perform order purchase of equipments and arrange estimated time arrival.
  • Prepare weekly progress report.
  • Liaise and coordinate with ED if any query or found discrepancy between actual on field and drawing.
  • Planning and controlling for all production activities.
  • Lead a team to ensure project deliver safely and meet the targets (schedule, quality and budget).
  • Regularly holds meetings with team members to communicate weekly results, company news & changes, projects and discuss action plans for a week.
  • Prepare work package documents required for hand over to client.
  • Follow and involved sea trial activities.
Jun 2010 - Jan 2014

Piping & Commissioning Engineer

AMOE Pte. ltd
  • Attended daily morning safety briefing, toolbox talk and progress weekly safety briefing.
  • Prepare commissioning or testing procedures meet to classification standard and technical spec.
  • Planning, supervising and reporting for piping pre commissioning activity (hydro test, pipe cleaning)
  • Provide technical assistance to piping supervisor and subcontractor.
  • Perform flange management activities on flange joint and bolt tightening as required.
  • Perform commissioning test and start up for all auxiliary equipments and systems onboard.
  • Coordination with project management, owner’s representative and subcontractor for piping pre commissioning plan and progress.
  • Invite and assist service engineer.
  • Follow or involved on sea trial activities.
May 2008 - Apr 2010

QA/QC Inspector

PT. batamec SHIPYARD
    • Prepare ITP (Inspection Test Plan) for hull/piping.
    • Carried out inspection activities (fit up, visual inspection) such as block or panel.
    • Liaise with NDT coordinator to select joint welding for NDT.
    • Witness PWHT process and checking soaking time, holding time and review report.
    • Witness air inspection activities for all tank to ensure no leaking (Hull).
    • Carried out inspection for spools fabrication and installation accordance with shop drawing, and Piping & Instrument Diagram (P & ID).
    • Perform material verification to identify material grade, type, size and heat number.
    • Perform fit up inspection activities, check and ensure join in good condition as per WPS required
    • Perform visual inspection, check root penetration, external surface welding defect, alignment and dimensional check after welding.
    • Witness Pressure Test (Hydro/Pneumatic Test) Piping System Fabrication and onboard accordance Procedure testing and Classification Requirement.
    • Witness flushing and blowing activities for pipe and ensure internal clear from any debris.