Employers

Presentations (Inventory)

Skills

Skills

Citrix Applications

Oracle Financials

Microsoft Office

Vendor Development

Scrap Disposal

Transportation Modelling

Inventory Classification & Inventory Codification

Forcasting Demand

Product Assortment & Product Mix

Warehouse Design & Layout

Logistics Management

Warehouse Management & Warehouse Control

Materials Management

Domain Exposure

Materials Management

Profound experience of all kinds mechanical such as piping & structural materials used in oil fields & tankage projects, a wide exposure to different kinds of equipments such as vessels, pumps & electrical apparatus such as transformers, electrical panels, cables, switchgears used in power projects, good knowledge of bulk items used for infrastructure projects such as roads & buildings. Stacking, Warehousing & keeping the required minimum stock of a wide variety of spare parts, lubricants or Oils & issuing them against the particular asset Equipments at the time of their preventive maintenances, making work orders & issuing them in ERP.

Scrap Disposal

Effective disposal or resale of scrap materials such as reinforcement bars, structural steels, And other Environmental Hazard wastes such as used lubricant oil, waste tyres or bricks & other mechanical or polythene wastes to highest quoted vendors anytime during or after completion of projects.

Logistics Management

Forecast demand using historical project data & experience. Extensive Coordination with the end users, planning and purchase departments for immediate response to the requirements at site so that the progress does not hampers for the want of material. Warehouse Management & Warehouse Control Identifying & investigating inventory variances. Reconciliation of materials, identification of slow, non-moving & scrap materials. Stock verification, dispatch of non-moving & surplus materials to other sites as per site requirements.

Interest

Science, Gadgets, Travelling, Books

Work History

Work History
Feb 2011 - Present

Assistant Manager - Materials

IL&FS Engineering and Construction Company Limited

Client - Power Grid Corporation of India Limited

Rural Electrification Works for Districts of Orissa & West Bengal under Rajiv Gandhi Grameen Vidyutikaran Yojna (RGGVY).

Job Profile -

  1. Looking after simultaneous inventory coordination & consolidation of various RE Packages spread across Orissa & West Bengal regions. 
  2. Conducting periodic audits, inventory classification & reconciliation. 
  3. Setting up of a transparent warehouse operation system to allow all involved agencies to trace & track every individual article in detail.
  4. Setting up of a seamless integrated information flow system.
  5. Reviewing and monitoring department reports, records, and documentation and determining necessary changes for overall department improvement and efficiency. 
  6. Screening, hiring, training, evaluating employee performances and taking disciplinary action for warehouse personals.
Dec 2010 - Feb 2011

Engineer Materials

Punj Lloyd Limited

Client - Indian Oil Corporation Limited

IOCL Paradip Refinery Project at Paradip, Orissa, India.Job Profile - 

  1. Performing materials handling & offloading of FIM bulks.
  2. Receiving, Inspection & segregation of bulks under PMC witness.
  3. Setting up materials control system to establish accountability, traceability & surplus.
  4. Care, custody & preservation of FIM bulk materials.
  5. Colour coding of pipes for proper identification, greasing of unpreserved valve & flange faces, oiling bolts & nuts to prevent atmospheric contamination.
  6. Identifying all shortages, damages, discrepancies and follow through for resolution to buyers & suppliers.
  7. Establish a quarantine area for non conforming FIM bulk materials.
Jun 2010 - Dec 2010

Engineer, Materials & Logistics

Punj Lloyd Limited

Client- Abu Dhabi Gas Industries Ltd. (GASCO)Gasco’s Nitrogen Generation & Injection (Mixed Case) Project, at Habshan, Abu Dhabi, UAE.

Job Profile -

  1. Acting as a frontline interface between the user departments, purchasers, suppliers & vendors to provide smooth functioning of the operations.
  2. Sourcing Planning, including current inventory and forecast demand, in collaboration with all buyers & suppliers. Cutback of unprofitable Inventory & reduction in supply costs.
  3. Inbound Operations, including transportation from suppliers and receiving inventory.
  4. Constant follow up in regards of materials required at different project sites. Planning the dispatch according to the site requirement & scheduling the arrival of the materials by raising timely indents. Preparing MIS reports for the management.
  5. Ensuring On-Time Delivery by coordinating with Execution, Planning & Purchase Departments. Preparing comparative statements. Thorough scrutiny & reconciliation to acquire Four Way Matching. Inbound & outbound logistics arrangements.
  6. Coordinate for stock transfer across sites, ensuring synergy & efficiencies are maintained and leveraged. Designing and generating weekly & monthly statistical forecast reports. 
  7. Segregation of materials according to Isometric Drawings, maintaining optimum stock levels. Controlling & segregation & maintaining inventory of fabricated/painted spools & pipe supports.
Oct 2008 - May 2010

Engineer, Materials & Logistics

Punj Lloyd Limited

Client- Abu Dhabi Polymers Company (Borouge)Borouge-2 Utilities & Offsite Project, at Ruwais, Abu Dhabi, UAE.Job Profile - 

  1. Responsible for direct coordination with client, materials take-off & dispatching according to Isometrics, plan drawings and flow sheets timely as per the project schedule & plan the release of the same to different subcontractors as per their job contract agreement, & the distribution of isos.
  2. Inbound & Outbound Logistics.
  3. Controlling & maintaining inventory of Metal pipes ranging from ¾; inch to 80 inch diameter, Structural steel, Heavy plant equipments, including flare, vessels, pumps, reactors, turbines, transformers, compressors etc.
  4. Thorough scrutiny & constant follow up into the transportation & logistics relating to the takeoff & distribution of pipes & fittings to different subcontractors to achieve deadlines according to the distributed isometrics.
  5. Intensive coordination & categorization harmonizing the tight schedule of the project. Materials reconciliation simultaneously with completion of each test pack.
  6. Strategically manage the procurement, movement & storage of materials. Reconciliation, cataloguing, MIS reports.
Jul 2007 - Sep 2008

Engineer (Materials)

Punj Lloyd Limited

Client- Road Infrastructure Development Company of Rajasthan.Construction of 90 Kms Two Lane State Highway Road project from Baran to Jhalawar, Rajasthan, India.Job Profile- 

  1. Leading two separate camps at a distance of 50 Kms apart from each other spread across the entire stretch. Managing inventory of the huge quantity of raw materials & product mixes.
  2. ERP controlling to in handling of inventory & upkeep of spare parts & lubricants used in overhauling of a large fleet of equipments.
  3. Dismanteling whole camps & resale of scrap to local & national vendors & preparing the comparative statements.
  4. Economic introduction of effective 3PLs for transferring Asset Inventories to other projects.
Oct 2006 - Jun 2007

Assistant Engineer (Materials)

Punj Lloyd Limited

Client- Rajasthan Rajya Vidyut Utpadan Nigam Limited(2X250) MW Chhabra Thermal Power Plant, Chhabra, Dist-Baran, Rajasthan, India.Job Profile- 

  1. Keeping Inventory of large qty of Raw Materials, Like Cement, Aggregate, TMT Bars, Structural Steel.
  2. Segregation & assortment of different categories of products like switchgears, transformers, panels, cable trays, scaffolding, spare parts and consumables.
  3. Supplier & subcontractor billing & accounting.
Aug 2005 - Sep 2006

Trainee Engineer

Punj Lloyd Limited

Client- Jindal Power Limited(4X250) MW O.P. JINDAL SUPER THERMAL POWER PLANT; Dist. – Raigarh, Chhattisgarh, India.Job Profile - 

  1. Invoice certification of subcontractors & vendors, Monthly materials reconciliation of subcontractors, raising debit notes.
  2. ERP material receipts, physical inspection, stacking, issuing, condition monitoring,
  3. Day to day reporting to planning & PM, Generating MIS Reports.

Education

Education
Jun 2000 - May 2002

Senior Secondary Certificate Examination

Govt. Sr. Sec. School, Chandigarh

Certifications

Certifications
Jan 2013 - Present

Certified Supply Chain & Logistics Professional

V Skills, New Delhi
Jun 2010 - Present

Primavera 6.0

Cadd Centre, Chandigarh
Jun 2010 - Present

MS Project

Cadd Centre, Chandigarh
May 2010 - Present

Mechanical Auto Cadd

Cadd Centre, Chandigarh
May 2010 - Present

Solidworks

Cadd Centre, Chandigarh