Download PDF

Summary

Extensive Knowledge of Aviation Management

1. Air Transportation Procedures

2. Air Cargo/Airport Management

3. Weight & Balance Technique  

4. Radio Communication Technique

Work History

May 2007Present

Offshore Radio Operator III

Fircroft (Thailand) Limited

1. Establishing a communication with Helicopter’s pilot, vessels, and Flight dispatcher for an expeditious information & rapidly precise cargo transferred.

2. Coordinating any concerned stations regarding to an emergency situation and managing personal for evacuation.

3. Utilize planning a vessel’s route for reducing time & cost and to cope with efficient time working.

Oct 2006Dec 2006

Air Traffic Control Trainee, On-Job-Training

Kampangsane Flying Training School RTAF, Nakornprathom Province

1. Aerodrome Traffic Controller : controlled departing and arrival aircrafts.

2. Radar Controller : provided save separation to the aircrafts and gave air traffic information regarding to safety flight together with the safe alternate route for any emergency situations.

3. Flight Dispatcher : provided NOTAMs and any information regarding to flight.

Education

Next page.

Project

Training and Certificates

  • Tropical Basic Offshore Safety Induction and Emergency Training (T-BOSIET)
  • Tropical Further Offshore Safety and Emergency Training (T-FOET)
  • Helicopter Landing Officer Training & Assessment (HLO)
  • Helideck Crew Member Training (HCM)
  • Dangerous Goods Training (CAT. 10 for Offshore Operation)
  • iPlan (Operations Planning and Tracking System)
  • iLogistics 6.2D Production Programme
  • BAPP Observer training.
  • Aviation Fuel training
  • Non-Cargo Activities Request for Supply Vessel - New Process and VSIT 1.0

Achievements

Tangible: 

  • Achievement in role HLO, the leader of team to provide support arriving and departing aircraft with no incident and DAFW record.

 

  • Achievement record “NO SHOW” in February, 2016 for passenger’s movement to and from Satun LQ by minimization concept.

 

  • Achievement in Satun Crew boat Optimization Project April 2014 to April 2015.

Use A Lean Sigma tool for crew boat operation’s time saving. (Successful 20% reduce in crew boat’s running time) 

 

Intangible:

  • Reinvention of POB excel programme to prevent human error and reduce the duplicated manpower.

 

  • Create Satun Crew Boat Tracking Programme to continue support of Satun Crew boat Optimization Project.

 

  • Renovate & Re-design Radio room in such radio communication devices for the best ergonomic and prevent human physical injury.

End.