Download PDF

Education

Sep 2009Oct 2014

Bachelor Degree

Menoufiya University

B.Sc.Electronics & Electrical Communication

Electronic & Electrical Communications Engineering Department 

 

Work experience

Feb 2012Present

Senior Telecom Engineer

BTC Netwoks

BLAISE DIAGNE International Airport In Dakar-Senegal : 1- Data Network : Design, Submit and Draw the 10G IP Backbone Network using Alcatel-Lucent Switches in three layer network with full redundant and Make the Structured Fiber Optic Cabling for it. 2- Voice System: Design, Submit and Draw the Voice System using Alcatel Crystal Technology (ACT) from Alcatel-Lucent and connect it to the the IP network. 3- CCTV : Design, Submit and Draw the CCTV system using Axis IP Camera and Gueterbruck Network Video Recorder and connect that system to the IP network 4: Security Access Control System (SACS) : Design, Submit and Draw the SACS system using General Electric panels and card readers. and connect that system to the IP Network 5- Building Management System (BMS) : Design, Submit and Draw the BMS System using Johnson Control Panels with LONWORK-BACKNET and MODBUS Protocols.And connect that system to the IP Network 6- Public Address System ( PAS): Design, Submit and Draw the PAS using BOSCH Speakers and amplifiers and connect that system to the IP network 7- Fire Alarm System (FAS) Design, Submit and Draw the FAS using General Electric Panels and Smoke Detectors and connect that system to the IP Network 8- Master Clock System (MCS) Design, Submit and Draw the MCS using Mobatime Clocks and NTP Server. And Connect that system to the IP network. 9- Flight & Baggage Information Display System ( FIDS & BIDS): Design, Submit and Draw FIDS & BIDS system and connect it to IP network 10- Master TV (MATV): Design, Submit and Draw the MATV using Fracarro Multiplexer Channel.

Dec 2005Feb 2012

Telecom & Network Engineer

Basic Electronic Compnay

King Khalid International Airport in Riyadh : 1- Build the IP network using 3 Com Switches three later Network with Full redundant and make the fiber optic structure cabling for it 2- Configure the core and switches according to the airport requirements.(STP , OSPF , VLAN , inter VLAN Routing , Port Security , QoS ...ext) 3- connect the PLC and Security Panels to the IP network 4- Install all the servers responsible for Monitor and Control all the security and PLC systems 5- Making All the shop drawing and SLD of the data network indicating the termination connectivity and the protocols used in the configuration. 6- Install and configure microwave links between buildings that don't have manholes infrastructure 7-Making Link budget fiber optic loss for all the links of the network.

Certifications

Sep 2010Present

Systimax SCS Design and Engineering

Systimax
Systimax SCS Design and Engineering
Jul 2014Jul 2017

NSR 1

Alcatel-Lucent
Alcatel-Lucent Network Routing Specialist I
Feb 2013May 2015

CCNP R&S

Cisco
Cisco Certified Network Professional ( Routing & Switching )
Feb 2013May 2015

CCNP Security

Cisco
Cisco Certified Network Professional ( Security )
Feb 2013May 2015

CCNP VoIP

Cisco
Cisco Certified Network Professional ( VoIP )
Feb 2013May 2015

Cisco VPN Security Specialist

Cisco
Cisco VPN Security Specialist
Feb 2013May 2015

Cisco ASA Specialist

Cisco
Cisco ASA Specialist
Feb 2013May 2015

Cisco Firewall Security Specialist

Cisco
Cisco Firewall Security Specialist
Aug 2010Aug 2013

H3C Senior Network Engineer

H3C
H3C Senior Network Engineer