TRAINEE MECHANICAL ENGINEER

ZISHAN ENGINEERS (PVT.) LTD

OGDCL KPD-TAY INTEGRATED DEVELOPMENT PROJECT PHASE II

  1. Modeling & Stress Analysis of  Pipeline on CAESAR II Software
  2. Review & verify Isometric Drawings of Wellheads with P&IDs
  3. Review & verify Mechanical Piping Layout of all Wellheads & Plant Areas, with P&IDs
  4. Review of General Assembly Drawings of Storage Tanks with Design Reports.
  5. Assist in other Engineering work related to the Project.
  6. Prepare Bill of Quantity (BOQ).
  7. Resolve the technical queries of contractor required for the finalization project.