Selvakumar Nagalingam

  • Singapore

Senior Project Engineer, Deputy Management Representative


Sep 2010 - Nov 2010

Structural Steel Engineer

BCA Academy
Aug 1997 - Jun 2001

Bachelor of Engineering - Mechanical

Madras University

Work History

Work History
Nov 2007 - Apr 2015

Senior Project Engineer

Shao Fook Engineering Pte Ltd, Singapore
  • Monitor the schedule, Manpower usage, Equipment usage, Progress and Costing of the projects.
  • Estimation of cost breakdown for the steel structure fabrication / Installation projects.
  • Preparation of monthly progress claim for the project.
  • Preparation of project quotation for site instructions and variation orders.
  • Preparation of AFC measurement for steel structure.
  • Preparation of P & I Drawing using AutoCAD.
  • Preparation of Pump Head Calculation & Sizing of Pipe based on the client requirements.
  • Selection of Pumps, Gauges, Valves, filters, flow meters and liaise with vendor for sourcing.
  • Preparation of lifting plan for equipment and steel module installation using AutoCAD.
  • Site check and prepare isometric drawing for piping using AutoCAD.
  • Preparation of monthly costing report for the department
  • Selection of Hydraulic cylinder and Hydraulic power pack.
  • Raise technical proposal to client for drawing deviations and site clashes.
  • Liaise with clients for Engineering / Quality issues.
  • Estimation of Bill of Quantity and Material Take Out for tendering / procurement using preliminary client drawing.
  • Checking of Steel Structure Fabrication Shop drawing.
  • Manual design of simple steel structure, selection of beams, selection of columns & design of connection details.
  • Preparation of Documents for Government submissions like planning package, structural package, pollution control and fire fighting systems.           
  • Comply departmental ISO procedure for Engineering / QC activities.
  • Analyzing subordinate’s performance in order to achieve department goals and KPI.
  • Conduct internal audit and organize yearly external audit. ISO 9001 / SS 506.
Feb 2006 - Oct 2007

Detailing Engineer

Syarikat Pembekalan Dan Perkhidmatan Lezan, Malaysia
  • Preperation of shop drawing for the body building of various special vehicles.
  • Estimation of Bill of Quantity for the purchasing purposes.
  • Preparation of operation and maintenance manual.
  • Analyzing the Hydraulic Cylinder required for various operations.
Mar 2003 - Jan 2006

Draft Man

Diagonal CAD, India
  • Preparation of AutoCAD drawings from the hard copy drawing.
  • Teaching AutoCAD 2004 for a minimum batch of students.
Aug 2001 - Feb 2003

Assistant Site Engineer

Arun Excello Fabrications, India
  • Supervision of every day activity of the project.
  • Monitor and verify the progress based on the project schedule