PROJECT EXPOSURE:

Water treatment plant, Sewer gravity pipeline, Irrigation water pipe line, well- point de-watering systems, sheet piling EWE, Construction of  Reservoirs  & Building Works.

Pipeline includes GRP, HDPE, DI, and UPvc varies from 160mmØ to 2000 Ø.

EXPERIENCE

Civil Engineer having  8 years of experience in (Planning/ Site Execution /Quality control /Quantity surveying) Including 3 years of International experience Capable of Working on own imitative or as part of a team.

KEY RESPONSIBILITIES :

Manage creation and coordination of overall project plans, schedules, monitoring, progress and milestones against the plan.

 Check the quality of work is carried out as per the contract specification & GFC drawings.

 Preparation, submission and obtaining approval on material proposal.

 Preparation and Submission of ITP, RFI, method statements &  Daily/Weekly/Monthly progress report as applicable.

 To calculate bill of quantity, raise material request as per requirement

 Guide the Site Engineers, Forman& supervisor on the aspect of execution of contracts.

 Monitor effective usage of Manpower/equipment/materials at site & control within norms.

To co-ordinate with Contractor/Client/Consultant/Various  vendor for timely execution.

 Preparation of daily, monthly  progress report and submission to consultant.

 Ensure safety at site .

EXPERIENCE IN WATER SUPPLY  PROJECTS :

 Structural Works:

  •  Construction of sump tank of various sizes -15*9m, 6*4m, 3*3m etc.
  •  Construction of elevated reservoir of capacity 10 cub.m lit to 32 cub.m lit.
  •   Construction of pump house.
  •  Construction of Valve chambers

 – Air valve chamber, Washout chamber, Isolation chamber, flow meter chamber & Tie in chamber.

  • Construction of Thrust block for various pipe dia size 400 to 600 mm Dia.
  • Construction of Water treatment plant – 11 MLD
  • Construction of Residential Building of area 100 Sq.m to 300 sq.m.

Pipeline Experience:

  • Laying of DI pipe of class - K7 of Dia 200 & 450 mm through gravity and pumping for length of 2020 m & 1075 m respectively.
  • Laying of HDPE pipe of 710 mm Dia of force main line up to 6m deep of

Length -6320m

  • Laying of GRP pipe sewer line varies Dia -400 to 1600 mm up to -6 m deep of length – 8000 m
  • Laying of GRP pipe irrigation line of Dia -600 mm up to -5 m deep of length               - 12000 m.
  • Construction of pipe line with concrete encasement where ever necessary.
  • Laying of UPVC Pipe gravity line of Dia – 200 mm up to -3 m deep of length – 1000m.
  • Hydro test & mirror test carried out according to Engineers instructions.
  • Installation of  FOC duct along the pipe line and concrete encasement shall be done where ever necessary.
  • Pre- cast & installation of FOC chamber at site.
  • Installation of HDPE manholes along the sewer line.
  • Back filling and rein-statement work.

 

WORK HISTORY :

Work History

Sr. Civil Engineer

Aug 2013 - Present
M/S Vijay Consultant & COntractor

Scope of Work:

                 Construction of pumping main – 200 mm Dia- DI pipe -2020m

                 Construction of gravity main -450 mm DIa- DI pipe-1075 m

                 Construction of receiving sump of capacity 0.1 LL to 3.25 LL -129 no’s

                 Construction of elevated reservoir -176 nos.

 

Civil Engineer

Nov 2012 - Jun 2013
M/S AMROUNI INTERNATIONAL CONSTRUCTION LLC

Scope of Work:

Open trench force main line of HDPE pipe DIA – 710 mm for -13 Km   and construction of valve chamber up to 6m deep.

 

Sr. Civil Engineer

Nov 2012 - Aug 2012
M/S GULF PETROCHEMICAL SERVISE & TRADING LLC

Scope of Work:

Open trench force main line of GRP pipe DIA – 600 mmØ for -7 Km with concrete encasement and construction of valve chamber up to 8m deep.

Main trunk sewer   line of GRP pipe of different 1600mm Ø to 2000mm Ø for -36Km and installation Polycrete manhole.

Open trench Sewer lateral line of GRP, HDPE& UPVC of different dia -200 mm to 600 mm dia for – 92 KM & installation of HDPE manholes along sewer line.

Installation of FOC chamber for cable routing along sewer line.

 

Civil Inspector

Mar 2010 - Sep 2010
M/S SHAH TECHNICAL CONSULTANT Pvt Ltd

Scope of Work:

  Construction of gravity main – 1600 mm MS  pipe – 8  KM

Construction of Intake well, MBR

 Construction of clear water pumping main-15 Km

 

Jr. Engineer

Jun 2008 - Sep 2009
M/S IVRCL INFRASTRUCTURE & PROJECTS LTD

Scope of Work:

  Construction of Water Treatment Plant -11 MLD

  Construction of Overhead water Tank -1 MLD

Site Supervisor

Jun 2007 - May 2008
M/S SREE VINU BUILDERS

Project:

  Construction Of Residential Buildings of Area -1200 to 3500 sft.

 

CERTIFICATIONS :

Certifications

Primavera P6

Jul 2013 - Sep 2013

Auto CAD

Aug 2006 - Oct 2006
CAD Center

PERSONAL DETAILS

  • Age     -27                         Passport No:  H6625982 
  •  DOB       - 8Feb-1988    Issued Date:  19/2/2010       
  •  Martial Status- Single   Expiry Date:  20/2/2020       
  •  Religion- Hindu              Oman D/L:   84638881          

        Language Known      :  English, Hindi, Tamil & Malayalam