Salvador J. Paramo

Work History

Work History
Mar 2015 - Jul 2015

Concrete Finisher

Cen - Cal

Concrete finisher.

Aug 2014 - Present



General Labourer Maintain production equipment and machinery. Perform quality checks on products and parts. Analyze and record test data and issue reports. Package finished products and prepare them for shipment.

Jun 2004 - Jul 2014

Concrete Foreman

Stuart Concrete

Concrete Foreman. I can set forms that hold concrete to desired pitch and depth, then align them. Install anchor bolts, steel plates, door sills and other fixtures in freshly poured concrete or pattern or stamp the surface to provide a decorative finish. Cut metal division strips, and press them into terrazzo base so that top edges form desired design or pattern. Fabricate concrete beams, columns, and panels. Build wooden molds, and clamp molds around area to be repaired, using hand tools. Check the forms that hold the concrete to see that they are properly constructed. Monitor how the wind, heat, or cold affect the curing of the concrete throughout the entire process. Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth, using trowel. Spread, level, and smooth concrete, using rake, shovel, hand or power trowel, hand or power screed, and float. QUALIFICATIONS