Work History

Work History

Authorize Gas Tester

SIGUR ROS Sdn. Bhd
As Authorize Gas Tester Personnel &Continue conduct Gas Test if any Hot Work at Process Area & Confined Space activity. As Helicopter Landing Officer. Page 4 of 7 ♦
May 2015 - Present

Hse Advisor & Ptw Controller

Sigur Ros
HSE Advisor & PTW Controller at PT. Re-Route, Spool Installation & Pre-Commissioning Bukit Tua Development Project, PETRONAS Indonesia.. Provision of Transportation and Installation of BTJT-A 12 Inch Export Pipeline Re-route and Pre-commissioning For Bukit Tua Development, Ketapang PSC, East Java, Indonesia ♦ Sr. Safety Officer at PT. Gunanusa Utama Fabricator, Seismic Impact Project(SIP) Yadana Complex Platform, Total E&P Myanmar.
2012 - Present

Hsse Coordinator

Joint Operation Sigur Ros Sdn Bhd
HSSE Coordinator at & Trimulya Gemilang Consortium, Offshore Pipeline Replacement Project at PERTAMINA HULU ♦
Jul 2014 - Aug 2014

SIGUR ROS Sdn. Bhd

SIGUR ROS Sdn. Bhd
HSE Advisor at, Offshore Crossing Water Pipeline Project for TRNC(Turkish Republic of Northern Cyprus).. The project is the first of kind in the world, will supply 75, 000, 000 m3 of drinking and irrigation water to the Turkish Republic of Northern Cyprus, annually. Starting at Anamur, Mersin, Turkey, The project terminates at Geçitköy, TRNC(Turkish Republic of Northern Cyprus). after crossing across the sea at a depth of 280 m as well as via a suspension system having an overall length of approximately 80 km with a Ø 1600 mm diameter HDPE pipeline.
Sep 2013 - Dec 2013

Hsse Coordinator

Prosys Bangun Persada for Project Management Consultancy
HSSE Coordinator at PT. PMC) PT. PERTAMINA EP ASSET 3 Cirebon, Pembangunan Main Oil Line(MOL) dari Anjungan XA Process Lapangan X-RAY ke Pusat Pengumpul Produksi Balongan.. Project Scope: Install a 12-inch pipe as replacement of existing 16 inches, total length ofpipeline transportation of oil(MOL)± 28. 7 m ranging from Automated Process XA X-Ray Field to Production Collecting Centre Balongan. Executed by Consortium PT. TIMAS Suplindo & Leighton Offshore Responsible to: Correction & verification all HSE Document Contractor Monitoring implementation all HSE Program & Activity Contractor on site ♦
Mar 2013 - Aug 2013

Hsse Advisor

PERTAMINA HULU ENERGY-ONWJ
HSSE Advisor at PT. TIMAS SUPLINDO, Offshore LIMA Subsidence Remediation Project at.(Contract Completed) Project Scope: Simultaneous raising The LIMA Flow Station Complex(Compressor, Services, & Process platform) as well as the associated bridges and flare by 4(four) meters. Responsible to: Promote safety awareness and safe performance among project team members, including consultants and contractor personnel Conduct regular safety inspections/assessments on-site and at key off-site subcontractor locations in accordance with established project and site safety plans or as requested by site team Identify and work to eliminate hazards, unsafe conditions, and unsafe acts; work with company, contractor, and subcontractor management toward achieving an injury-free work place Keep site management apprised of significant safety issues, safety alerts and plans/progress towards resolving issues and eliminating hazards Advise site team of safety initiatives, issues, challenges, and incident investigations/follow-up Participate in investigation and follow-up of incidents/accidents; prepare notifications/reports for communication of significant incidents to company project/functional management per project incident reporting procedures and matrix Monitor work processes to ensure compliance with the site work permit system and area/system responsibilities Prepare/provide a safety induction briefing to new PHE-ONWJ, TIMAS team members, Sub-Contractor and visitors on site. Collect and share safety lessons learned with other sites and project and functional management Coordinate with doctor/medic on occupational health activities. Ensuring work is carried out in a safe manner and in accordance with Client HSE requirements.
Jan 2012 - Aug 2012

PRIMA ABADI MINERAL(HARITA Group)

PRIMA ABADI MINERAL(HARITA Group)
Apr 2011 - Dec 2011

Superintendent

Project(Coal Bath Methane)
SHE Superintendent at PT. TATA WIRAUTAMA, Barito Basin II South Kalimantan-Exxon Mobil Oil Indonesia, (Job Completion) ♦
Jul 2010 - Feb 2011

PERTAMINA GEOTHERMAL

PERTAMINA GEOTHERMAL
Jun 2010 - Dec 2010

Project-South Sumatra

Project-South Sumatra
2010 - Jun 2010

Project-Pangkajene Kepulauan-North Sulawesi PT

Project-Pangkajene Kepulauan-North Sulawesi PT
Oct 2009 - Jan 2010

Coordinator

TATA WIRAUTAMA, Public Road Upgare for Giyanti
SHE Coordinator at PT.-Mobil Cepu Ltd_ Exxon Mobil, (Job Completion). ♦

Education

Education

BACHELORS

University of Gresik