Summary

I have 18 years of experience in Construction & Maintenance Management in Major EPC Projects, Manufacturing, Maintenance, Retrofits/Revamps and Turnaround/Shutdown jobs for Oil & Gas, Fertilizers, Petrochemical and Cement Sectors in Pakistan, UAE & Qatar.

Work History

Mar 2012Present

Deputy Manager-Mechanical /maintenance

Descon Engineering, Qatar LLC
Deputy Manager-Mechanical /Maintenance
Aug 2007Mar 2012

Seiner Engineer-Mechanical /maintenance

Descon Engineering, Abu Dhabi
Seiner Engineer-Mechanical /Maintenance
Mar 2005Aug 2007

Assistant Manager-Mechanical Maintenance

Pioneer Cement Limited, Pakistan
Assistant Manager-Mechanical Maintenance
Apr 1997Jan 2000

Assistant Engineer-Mechanical

Dewan Salman Fibre Limited, Pakistan
Maintenance & Operation Support Engineer(January 2000 to Feb 2005) FL Smith's(Pvt) Limited, Pakistan Assistant Engineer-Mechanical Clients I have working experience with RasGas, Qatar Petroleum, Qatar Gas, Dolphin Energy, Exxon Mobil, JGC Corporation, ADCO, Elixiar Gasco, The LINDE Group, Worley Parsons, Qatar National Cement Company, DG Cement, Maple Leaf Cement & Fauji Cement. Major Projects Barzan Onshore Project for construction of Gas Processing facilities at RasGas. EPC Project of 5000TPD Cement Plant for Qatar National Cement Company.

Education

19911997

Diploma of Mechanical Engineer 

  • Diploma of Associate Engineer from Punjab Board of Technical Education Lahore Punjab Pakistan

Major Responsibilities

Schedule the project in logical steps and budget time required to meet deadlines.

Determine labor requirements and dispatch workers to construction sites.

Inspect and review projects to monitor compliance with building and safety codes, and other regulations.

Interpret and explain plans and contract terms to administrative staff, workers, and clients, representing the owner or developer.

·        Prepare contracts and negotiate revisions, changes and additions to contractual agreements with architects, consultants, clients, suppliers and subcontractors.

Study job specifications to determine appropriate construction methods.

Requisition supplies and materials to complete construction projects.

Prepare and submit budget estimates and progress and cost tracking reports.

Confer with supervisory personnel, owners, contractors, and design professionals to discuss and resolve matters such as work procedures, complaints, and construction problems.

Plan, organize, and direct activities concerned with the construction and maintenance of structures, facilities, and systems.

·        Investigate damage, accidents, or delays at construction sites, to ensure that proper procedures are being carried out.

 

Plant extension line-II fabrication, erection and installation of equipment and construction of delivered second hand equipment for plant line II.

Provide the technical support in manufacturing, erection for steel structure and equipment. 

Visit the parties for pre-qualification as vendor of fabrication and manufacturing items.

Inspection activities in commissioning of Pre-heater, E.P, Cooling Tower, C.F. Silo and Kiln coordination with DAL Teknik Engineer’s (Turkey).

Overall Project progress monitoring and Project scheduling

Maintenance of raw mill (Terex Ball Mill) replacement of lining plate, pinion, mill fan bearings, oil filters and apron feeders, gear box, oil pumps.

Maintenance of rotary kiln inlet outlet seal, supporting roller bearing and thrust device.

Maintenance of cross bar clinker cooler , wearing plates, bars, cooling fan bearings, drag chain, hammer of post hammer crusher, clinker bucket and pan conveners.

Maintenance of dust collectors and utility activities overall plant.

 


 

Monitoring of machinery during running plant and maintenance of plant during shut down activities of equipment, storage tanks, pressure vessels, boilers and heat exchangers.\

I have taken part in plant extension Line-III fabrication, erection and installation of equipment. Overall inspection of Parts fabricated in workshop and erection of equipment, piping, chemicals shipping tanker and steel structures.

 Responsible of boiler department’s controlling parameter of boilers different capacities according to process requirement and maintenance.

Witnessing the overall equipment and steel structure leveling of foundations and alignment.

Incoming material and consumable inspection as per code & specifications..

 Design the structure required for equipment in erection and commissioning of line-III.

 Maintenance and Operations support for Power house, Utility, Draw line, Columns, Vessels, Valves, Bailer and Spinning.

 Verification of overall contractors’ fabrication, erection and sand blasting.

Worked at FLS D.G. Khan Cement, Maple Leaf Cement and expansion project to increase the production inspection of plants fabrication, erection and commissioning with FLS Engineers.

·         Fabrication inspection of equipment’s, cyclones, steel structure, storage tanks, air vessels, belt conveyer’s roller guide and pre-heater structure.

 Inspection of pre-heater assembly alignment, plumpness and verticality.

Welding inspection of piping, structure, air vessels and storage tanks.

Witnessing of Hydro testing of tanks air vessels and relevant piping.

 Incoming material and consumable inspection as per FLS Code.

 Inspection of all fabricated items received from our Copenhagen office in Denmark

Preparing B.O.Q, for local manufacturing items.

 Inspection of various items fabricated in Hattar workshop for Chakwal Cement and Water Treatment Plant of CDA Islamabad.

 Inspection and preparation fit-up, welding, dimensional, visual inspection reports.

Galvanizing inspection of cable tray nut, bolts and washers as per project specification.

Inspection of sand blasting and painting all fabricated items.

Inspection of packing delivery of all items to client were including in my responsibilities. 

Preparation of shipping documents and marking of goods to be shipped.

Preparation of inspection reports for client and company record.