High potential engineer seeking a full time position as a Civil EngineerStructural Engineering: Experience in structural design of Foundation and Structural Inspection for Marine Structure responsible for structural analysis and design computations for cast-in-place reinforced concrete • Project Management and Construction Coordination: Experience in coordinating MEPC Contracts and drawings with multi-disciplined project teams. Responsible for reviewing and coordinating shop drawings and construction documents, addressing RFI’s as well as uphold project schedules and budgets throughout design and construction. • Civil Engineering: Experience in preliminary site due diligence/jurisdictional research and site development. Conduct drainage/flood plain studies, storm water management and erosion and sediment control design.

Work History

Work History
Aug 2010 - Dec 2010


Ingalls & Associates LLP

Duties included design and engineering tasks associated with Structural Design & Civil Site Design (Land Development)

·Newburgh Dock Inspection-Structural inspection & rehabilitation report- (Marine Development & Rehabilitation)

·Design of Canopy- Responsible for Structural analysis, design computation of Reinforced Concrete footings

·Design of Concrete Ring Beam for Storage Tank- Structural design computation & structural shop drawings production

·Design of Albany Dock –Responsible for preliminary structural design and estimated cost of construction-BOQ production

·Apex Terminal 54 Riverside –Created Spill Prevention Report (CBS) for NYSDEC-(Environmental Regulation)

·Mixed used property-SWPPP production, implementing sediment erosion control measures, adopted green infrastructure, Drainage, Hydrology & hydraulics, Permitting

Dec 2009 - Nov 2010

Structural Research

Syracuse University

·      NEXT Beam (innovation) vs Others Prestress Bridge Girders-“Bridge System with Prestressed Concrete GirdersInvestigation of Structural Efficiency and Accelerated Bridge Construction”. Study is being concededout by means of AASHTO LRFD Bridge Specifications & Prestress Concrete Design, (Used STAAD Pro, Microsoft Excel & Microstation)

·      The study is conceded out on a four lane single span prestressed concrete bridge girder. The parametric study involves the Bridge girder length spanning from (50’-0” to 90’-0”) the compressive strength f”c was varied.

·      The Bridge design comparison was made between six different types of  girder (AASHTO Type IV, Texas U-54, Box BIV-48, NEXT-36D, NEXT-36F, Box BIV-48 (adjacent to each other))

Dec 2009 - Jun 2010

Structural Engineering Intern

Hertel Steel Inc

Structural engineering task associated with production of structural shop drawings, addressing structural detailing, estimating quantities, creating sections & plan view and verifying structural design against codes. (Used Microstation v8)

Mar 2008 - Jul 2008

Contract Engineer

Indiabulls Real Estate

Duties included Contract Procurement, Project Management & Construction Co-ordination

·Experience in coordinating MEPC contracts and drawings with multidiscipline project teams. Responsible for reviewing & coordinating shop drawings and construction document, addressing RFI’s as well as maintain project schedule, Used SAP- Production Modulefor purchase order & work order.(Used AutoCAD)

Jun 2007 - Feb 2008

Jr. Engineer

B.E. Billimoria

Duties included verifying structural design against codes, Construction Inspection, Quantity Estimation and Quality Control

·Analyzed and designed various components like Slabs, Beam, Shear Wall, Footing, Columns and Retaining Wall. By doing this I got familiar with ACI code, IBC code & LEED points system. (Used AutoCAD & STAAD Pro)


Sep 2008 - Dec 2010


Syracuse University
  • Design of Structural System, Structural Analysis- I, Construction Planning & Scheduling, Advance Mechanics of Materials.
  • Structural Steel Design, Prestressed Concrete Design, Finite Element Analysis, Master’s Project, Structures II (Timber)
  • Plastic Design of Steel Structures, Rehabilitation of Infrastructures, Structural Analysis-II-Earthquake & Dynamic Engineering

Project experience can be viewed here:Project Experience(Click on these website)

Master’s Project: Next Beam (Innovation) vs Others Bridge Girders - “Study of Efficiency of Prestressed Concrete Bridge Structures”. Parametric study is being concededout by means of AASHTO LRFD & PCI

Seismic Analysis: Analysis of concrete building by means of SAP 2000. Performed Response Spectrum Analysis, Time Domain Analysis & Modal Analysis and theoretical computation of Equivalent Lateral Force Method was also carried out.

Rehabilitation of Bridge (Cortland Bridge): Bridge Inspection was conceded out. Based on worsening, long term solution was projected (External Post tensioning). Detail analysis and design was conceded out based on the new loads & BOQ was suggested

Design of Parking Garage (University Ave Garage): Analyzed and designed components of garage analogous to double tee girder & inverted tee girder (by means of green materials for components). Design was accomplished with facilitate of PCI Handbook.

Buckling Analysis, Dynamic Analysis & Non Linear Analysis: Analyzed the behavior of beam under euler load. A model of Beam was tested in an assortment of combinations of elements & simulation was performed by ANSYS (Finite element approach-failure test)

Design of Commercial Steel Building: Analysis and design of steel building using RISA-3d. I got familiar with LRFD, 13th edition.

Design of Commercial Building: Analyzed and designed various components like Slabs, Beam, Shear Wall, Footing, Columns and Retaining Wall. Green engineering was integrated (fit outs of glass panels & green roofing system, STP plant set up as a secondary function of in house production of Energy). By doing this I got familiar with ACI code, IBC code & LEED points system.

Fire Station Project-(South Onandaga): Budgeted report was prepared in Suretrak Software. The upshot of project was to decide schedule of construction activity with efficient use of resources, I got familiar with RS Means & NYS Prevailing Wage.

Other: Concrete Bridge Rehabilitation, Koyna Dam, Technical Paper on Blended Cement & Concrete Dam Rehabilitation

Jul 2007


University of Mumbai

Concrete Bridge Rehabilitation (Vashi-Panvel Bridge)• Duties included structural inspection; bridge rating based on CIDCO inspection rating manual and suggested a repair recommendation. Based on interpretation proposed a solution of structural overlay epoxy grouting. My objective was to study possible issues that can arise in bridge structures and propose remedial measures. Motive to choose this project was Repairs & Restoration of Bridge Structure was technical deficiency in INDIAKoyna Dam Phase-3• Visited and Studied the Koyna Dam. Here I study different Hydaraulic structures, the working of the dam and the process of power generation used at the DamTechnical Paper Presentation for ACC Company• Blended Cement: The paper concentrated on how Blended Cement can help to control various problems & reduce the permeability of concrete.



Civil Engineering Skills

  AASHTO LRFD Bridge Specifications-2007 PCI Design Handbook-6th Edition AISC LRFD-13th Edition ACI 318-05 Building Code IBC Code- 2009 Commentary ASCE-7-05 Minimum Design Loads AASHTO Highway Design Manual Technical Release 55 - Stormwater Manual NYSDOH- Appendix 75-A WTS ASCE Ratings & Inspection Procedure Stormwater Management Design Manual SAP 2000, RISA-3d, STAAD Pro, Mastan-2 ANSYS v11, PCA-Col, SP Beams, SP Col Microstation v8, AutoCAD-3d 2010 MSP, Suretrak (Primavera), MS office 2007 HydroCAD v9.1 (Stormwater modeling), SWPPP MathCAD v14, SAP Production Module