Download PDF

Work experience

Mar 2014Present

MIS Co-Ordinator

ZTE Telecom India Pvt.Ltd,
  • Update & Circulate Projects Master Tracker with all details.
  • Update & Circulate Zonal DPR.
  • Update & Circulate Core & Ran Tracker.
  • Update & Circulate Daily MW Tracker.
  • Circulate Daily Zonal Plan Vs Achievement Report to Zonal.
  • Circulate Weekly Gap Analysis report to Zonal.
  • Circulate Vendor wise weekly achievement report.
  • IPR & PO Management for Vendors.
  • Upload Important documents like ATC,RFI Reports etc. in SharePoint
  • Update & Circulate failure reasons for not achieved Sites.
  • Update & Circulate Infra Tracker with all details.
  • Update & Circulate TI Activity Tracker with all details.
  • Update & Circulate Various Plan Vs Achievements Tracker.
  • Update & Circulate Complains Rectification Tracker.
  • Verify Vendors Work Competition Certificate.
  • Prepare Project Data for Meetings.
  • Analysis Gaps Between all activity done in project time to time, Like gap between Sites HO & Material dispatch, Material Dispatch & BTS installed etc..
  • Co-ordinate with Vendors & Internal teams for updates and information.
  • Prepare documents for RFI Reports Submission & ATP Offer.
  • Prepare various reports as per requirement.
  • Upload Reports to P6 SharePoint.
  • Excel Trouble shooting.

 

 

Dec 2010Mar 2014

MIS Executive

Alcaltel-Lucent India Pvt.Ltd.
  • Prepare and circulate Site wise NWA for IP colo Sites.
  • Collect remarks for sites not achieving bench-mark NWA from Cluster Lead.
  • Categorize remarks and mail to IP Colo Vendors for their issues.
  • Download raw reports on Daily basis.
  • Prepare and circulate Busy Bouncing Hour (BBH) report.
  • Edit and circulate Cell performance reports (RAN Reports) for Circle.
  • Prepare and circulate MSC wise & BSC wise total traffic report
  • Maintain DPR for New MW hops and circulate it.
  • Contact area manager to know reason for outage.
  • Prepare and circulate Outage Report of swapped sites.
  • Prepare and circulate Weekly Outage report of IP Colo sites.
  • Co-Ordinate with Project Team.
  • Prepare and circulate NBH, BBH, DBBH, DBH and 24HR. report of ZTE site.
  • Prepare and circulate Data payload report.
  • Prepare and circulate Daily & Weekly 0 Call Cells Report
  • Prepare WCC of Completed Project.
  • Prepare and circulate NQI Calculation Report of 3G
  • Prepare and circulate Weekly 3G Congestion & Throughput Report
  • Prepare and circulate Weekly 3G Utilization town wise report.
  • Prepare and circulate Weekly CTO Dashboard presentation for 3G.
  • Prepare and circulate Weekly 3G Presentation.
  • Prepare and circulate other reports like 2G swap integration, 2G to 3G Swap Tracker, 2G and 3G RTL

Acceptance Tracker etc.

  • Prepare EMF Data Sheets.
  • Maintain EMR records.
  • Excel trouble shooting.
  • Updating sites info on RFM Portal.(If Required).
  • Prepare and circulate Ater Utilization Report (If Required)
  • Create Plan Event on portal.(If Required).
Oct 2008Dec 2010

Data Entry Operator

GTL Infrastructure Ltd.
  • Maintaining all records like GRIN, GRN, DC, and SRN.
  • Maintaining stock inventory at Oracle.
  • Keeping & maintaining records of Invoices ensure that organized Invoices along with GRN are send to Corporate Office.
  • To ensure that there is no duplication of MRNs or any material.
  • Maintaining MIS for Warehouse.
  • To create and send MISS. Report Like –Daily dispatch detail, Weekly stock report, Monthly Stock

Statement, etc.

  • To assist the Warehouse In charge.

Excel trouble shooting

Oct 2007Oct 2008

Caf Auditor (MIS)

Tata Teleservices Ltd.
  • To provide CAF (Customer Application Form) receiving report.
  • To audit physical cafs and software entries
  • To send CAF and POS audit report to Circle Office.
  • To create CAF pendency to locations
  • To call to locations and ask for CAFs.
  • Maintaining important records like ESN of handset, and data card, address change document and details etc.
  • Collect the CAFs from locations and dispatch all the complete CAFs to circle warehouse.
  • To create service request for customer service.
  • To provide other reports asked by circle office.
  • To do the order entry with the Data Entry Operator.

 

Education

Jul 2008May 2014

B.COM

IGNOU
Jul 2002Jun 2004

Intermediate

C.M.Anglo Bengali Inter Collage
Jul 2000Jul 2002

High School

C.M.Anglo Bengali Inter Collage

Skills