Christian Pagazani

Christian Pagazani

Summary

Process and Project engineer with 12 years of experience in oil and gas surface facilities. Involved in all aspects of an engineering and construction, with solid knowledge in project development. Background includes designing facilities and budgeting projects; supervising construction; redesigning specifications to meet feasibility plan; assigning responsibility; ensuring projects meet design specifications and remain within budget; purchasing equipment and necessary materials. University degree in Mechanical Engineering (1996).

Skills

Skills

Additional Skills

•    Languages: English (advanced), Spanish (primary language). •    Safety: HAZID and HAZOP analysis, STOP program, Change Managing applications. •    Engineering Drawings: P&IDs, PFDs, H&M balances, process data sheets, Isometrics, Plant and Profile. •    Plant modeling and design software: HYSIS, PIPESYST, PRO/II, PIPEPHASE, AUTOPLANT 3D, CAD. 

Process Engineer

•    Designed surface facilities requirements for oil and gas production fields. •    Applied debottlenecking of existing installations •    Compiled Multiphase Flow measurement well testing Best Practices. •    Defined equipment process data sheets. •    Modeled and evaluated process by simulation software.

Engineering and Construction Lead Engineer

•    Supervised pipelines, well flow lines, flow stations, gas gathering plant and production manifolds, engineering, construction and commissioning. •    Designed surface facilities, start up procedures, focusing on safety, reliability, and efficiency. •    Supervised team of field engineers and on-budget integration of third-party products.

Work History

Work History
Feb 2006 - Present

Project Engineer

Repsol YPF

Responsible of the engineering, bid preparing, and construction of the new surface facilities required to manage the increasing production of the Reynosa-Monterrey Gas field according with the 2004-2009 development drilling plan.

•Successful construction of 10"x12 Km.gas pipeline on-time, on-budget (4.5 MM US.Dollars) and with no accident safety record.

•More than 20 Km of 3" well flowlines construction and replacement.

•1000 HP compressor unit: leasing and installing on existing plant.

May 2004 - Feb 2006

Facilities Engineer

OGS energy services

I worked as a Process Engineer consultant assigned for Repsol YPF to evaluate existing facilities of Reynosa-Monterrey gas field and propose the facilities requirements to assure the production plan 2004-2009.I did the designing, leading engineering process, and follow up the construction of these facilities, including: Flow stations, production manifolds, gas pipelines, well test separators, tanks and flares among others.

•Designing and construction of 84 MM scfd gathering station on time and budget which process80% of the actual production of the field.

•Debottlenecking based on HYSIS and PIPEPHASE simulation software abilities.

Oct 2003 - Feb 2004

Process Engineer Consultant

Intelcon System C.A.

I worked in the development of three documents of Multiphase Flow Measurement Well Testing Best Practices to be used by PDVSA as a guideline for the implementation of this technology in well testing.

Mar 1999 - Jan 2003

Surface Facilities Engineer

PDVSA

(Furrial light oil field) Responsible of the evaluation, design, budget and optimization:

•Well testing system for 120 wells and 350000 b/d: automated manifolds, automated test separators, test pipelines, multiphase flow meters, cyclonic separators, water cut in line analyzers, mass flow meters and test tanks.

•Flow Stations: 220000 b/d (oil and gas separation, gas scrubbers, pipelines, dewatering, and storage tanks).

•Water Alternated Gas (WAG) injection: well surface facilities design.

Sep 1996 - Mar 1999

Surface Facilities Engineer

PDVSA

(Morichal Heavy Oil Field) Responsible of the evaluation, redesigning and optimization of:

•Gas production, compression and gathering network 60 MM scfd; liquid flow meter systems for 19 flow stations 80000 b/d; automation pilot project for 8 production wells (PCP/MP/Gas Lift/ESP).

•Production surface facilities for re-entry and horizontal wells 10000 b/d, year 1997 (flow lines, production manifolds, diluents lines, gas lines and locations.

Education

Education
Sep 1990 - May 1996

B.S., Mechanical Engineer

UNIVERSIDAD SIMON BOLIVAR

No.6 out of 25 with a total mark 4.02 from 5.00

LAGOVEN, S.A. Petroleum Co. Scholarship 1992-1996