1.Multipurpose Outdoor Stadium-S4, (Design and Built Project)(650 M. Dhs)
Position:MEP Manager
Responsibility:
• Review the MEP design
• Follow up the consultant/designer works
• Coordination between civil team and MEP sub-contractor in order to avoid delay in civil worksand concrete casting
• Make sure that MEP works in line with civil works in matter of shop drawings approvals and material availability on site.
• Manage the MEP plane to keep it on track and in project time Frame.
• Coordinate the MEP works with site progress: AC, Plumbing, Electrical, Irrigation,Elevators, Firefighting and Special Electronic (BMS, Flood lights, VA, PA ,Fire alarm, Data,TV, screen board and TV broadcasting systems)
• Follow up the sub-contractors and sub sub-contractors to achieve the quality of the job according to the specs.
• Run engineering Dept. for deference MEP activities.
• Follow the site progress program
2.Mushref water reservoir Phase 4,5 &6 (DEWA contract CNW/397/2007)(620 M. Dhs)
Position: MEP Manager
Responsibility :
• Finalize the MEP offers and prepare the prices comparison sheet
• Manage MEP Subcontractor and civil teams for piping works and manholes constructions.
• Coordinate the MEP works with site progress including:
AC, piping, Plumbing, Electrical, firefighting and Special Electronic (SCADA, Flood lights,Firealarm, Data, CCTV systems)
• Coordination between civil team and MEP sub-contractor in order to avoid any delay in civilworks and concrete casting
• Make sure that MEP works in line with civil works in matter of shop drawings approvals and material availability on site.
• Manage the MEP plane to keep it on track and in project time frame.
• Run MEP daily activities with the sub-contractors
• Review the MEP shop drawings, material submittals and RFI’s
• Deal with DEWA project management and consultant