Download PDF

Work experience

Apr 2014Present

Energy Modeler & Analyst

  • Energy Modeling & Simulation using eQuest 3.64
  • Energy modeling for Building as per Baseline appendix - G, ASHRAE 90.1
  • Analyzing different HVAC system performance for Existing or Proposed buildings
  • Comparing existing or proposed HVAC systems against Baseline ASHRAE 90.1
  • Energy Modeling & Simulation for EPACT Certification
Apr 2013Mar 2014

HVAC Engineer

Center for Advanced Research in Building Science and Energy (CARBSE)

Worked as Research Assistance on following Projects as of now –

  • Design and Development of Net Zero Energy Building
  • Design and Development of Guarded Hot Box
  • Design and Development of Thermal Comfort Chamber
  • Radiant System design for Furniture application – Test bed Setup
  • Energy analysis and system performance Evaluation for Existing buildings in India
Feb 2012Dec 2012

HVAC Design Engineer & Energy Modeler

Hi-Tech Cadd Services
  • Energy Modeling & Simulation using eQuest 3.64
  • Energy modeling for Building as per Baseline appendix - G, ASHRAE 90.1
  • Energy modeling for Buildings as per energy star - NYSERDA guidelines
  • Analyzing different HVAC system performance for Existing or Proposed buildings
  • Heat load estimation & Calculations
  • Comparing existing or proposed HVAC systems against Baseline ASHRAE 90.1
  • Energy Modeling & Simulation for EPACT Certification
Jan 2011Jan 2012

HVAC Design & Project Engineer

Torrent Pharmaceutical Ltd. HVAC
  • Heat load Estimation & Calculations for Industrial Buildings
  • HVAC Units / Equipment selection
  • HVAC Systems Fan Selections
  • Preparation/approval of GA drawings of AHUs, FCUs, Exhaust Fans etc.
  • Preparation of Air flow diagrams
  • Preparation of Ducting layouts for HVAC Systems
  • Preparation of Piping layouts for HVAC Systems
  • Preparation of Tender specifications & BOQs
  • Taking approvals of working Drawings from Consultant / Client
  • Preparation of User requirement specifications of HVAC Systems
  • Preparation of Technical specification of equipment like AHUs, FCUs, Pumps, Chillers etc.
  • Coordination between Client / Consultant & Vendors
  • Technical Bid Analysis
  • Vendor Documents Reviews / Approvals
  • Vendor / contractors / Subcontractors Control & coordination
  • Aware of API and Formulation facility of Pharma sectors
  • Preparation / Approval of document like Design, Installation, Operation & Performance Qualification for HVAC Systems
  • Preparation of Purchase Requisition as per BOQ
  • Preparation of Project Planning, scheduling and Monthly Progress Reports
  • Follow up with vendors and consultants regarding Engineering activities and coordination with the vendors for timely manufacturing and the delivery of    equipment to the site. Inspection of Invoices after delivery of material to site
  • Coordination with site regarding Erection and commissioning of equipment as per protocol and final documentation for handover of project
  • Electric motor selection for AHUs
  • Preparation of Power Cable Schedules for HVAC Equipment
  • Site Control activities
  • Project Execution & Commissioning
Jul 2008Jan 2011

HVAC Project Engineer

Suvidha Engineers India Pvt Ltd
  • Heat load Estimation & Calculations for Industrial Buildings
  • HVAC Units / Equipment selection
  • HVAC Systems Fan Selections
  • Preparation/approval of GA drawings of AHUs, FCUs, Exhaust Fans etc.
  • Preparation of Air flow diagrams
  • Preparation of Ducting layouts for HVAC Systems
  • Preparation of Piping layouts for HVAC Systems
  • Preparation of Tender specifications & BOQs
  • Taking approvals of working Drawings from Consultant / Client
  • Preparation of User requirement specifications of HVAC Systems
  • Preparation of Technical specification of equipment like AHUs, FCUs, Pumps, Chillers etc.
  • Coordination between Client / Consultant & Vendors
  • Technical Bid Analysis
  • Vendor Documents Reviews / Approvals
  • Vendor / contractors / Subcontractors Control & coordination
Jan 2004May 2004

Trainee Engineer

Patel Airtemp Ltd.

Worked as a Trainee Engineer as Part of Education Curriculum while during Diploma at Nirma Institute of Diploma Studies

Education

Energy Modeling and Simulation Projects Done

1. Client: US Engineers USA - Energy Modeling & Simulation for EPACT Certification Projects • Family Express - Valparaiso Store • Family Express - Westville Store • Family Express - Plymouth Store • 2E Futon - Fulton Property Holding LLC, Grand rapids, Michigan • Chapel Complex & Religious Education Facility, Fort hood - Texas • Moore Memorial USARC Building, Bryan - Texas • Moore Memorial AMSA Building, Bryan - Texas • SF Supply Building, Grand Rapids - Michigan • 38 Commerce Building • MPP Facility Building • Ryan Industries 2. Client: MCW Energy Modeling Center of Excellence - USA • eQuest Model Creation for the existing building#77-OVC learning Center • eQuest Model Creation for the existing building#158-University of Guleph 3. Client: ALTANOVA Energy+Sustainability - USA • Baseline Model creation for the Multifamily Building as per appendix - G ASHRAE 90.1-2007 & also following energy star & NYSERDA guidelines.

HVAC Projects Done

Done HVAC Projects starting from Design, Planning, Procurement of materials, Execution, Installation of equipments along with billing collections for following Projects • New Insulin Facility, Torrent Pharmaceutical ltd – Indrad • Stability Block, Ranbaxy labs Dewas – Indor • Ranbaxy lab I+C Block - Dewas – Indor • Revamping & Modification of Block A, Ranbaxy labs Dewas – Indor • Revamping & Modification of Block B, Ranbaxy labs Dewas – Indor • Expansion & Modification of Block C, Ranbaxy labs Dewas – Indor • Warehouse Block C, Ranbaxy labs Dewas – Indor • New Packing Area, Torrent Pharmaceutical ltd – Indrad • API Module – F, Torrent Pharmaceutical ltd – Indrad • R M Warehouse – API , Torrent Pharmaceutical ltd – Indrad • R M Warehouse – Formulation , Torrent Pharmaceutical ltd – Indrad

HVAC Projects Done

Done HVAC Projects starting from Design, Planning, Procurement of materials, Execution, Installation of equipments along with billing collections for following Projects • New Insulin Facility, Torrent Pharmaceutical ltd – Indrad • Stability Block, Ranbaxy labs Dewas – Indor • Ranbaxy lab I+C Block - Dewas – Indor • Revamping & Modification of Block A, Ranbaxy labs Dewas – Indor • Revamping & Modification of Block B, Ranbaxy labs Dewas – Indor • Expansion & Modification of Block C, Ranbaxy labs Dewas – Indor • Warehouse Block C, Ranbaxy labs Dewas – Indor • New Packing Area, Torrent Pharmaceutical ltd – Indrad • API Module – F, Torrent Pharmaceutical ltd – Indrad • R M Warehouse – API , Torrent Pharmaceutical ltd – Indrad • R M Warehouse – Formulation , Torrent Pharmaceutical ltd – Indrad

Skills

Energy Modeling & Simulation
• Energy Modeling & Simulation using eQuest 3.64 • Energy modeling for Building as per Baseline appendix - G, ASHRAE 90.1 • Energy modeling for Buildings as per energy star - NYSERDA guidelines • Analyzing different HVAC system performance for Existing or Proposed buildings • Heat load estimation & Calculations • Comparing existing or proposed HVAC systems against Baseline ASHRAE 90.1 • Energy Modeling & Simulation for EPACT Certification
HVAC Design
• Designing of entire HVAC systems, Heat load calculations • Preparation of Air flow diagrams • Ducting & Piping layouts and all Working Drawings required for project execution • Detailed Planning, Procurement of Material • Coordination between Client / Consultant / Vendors • Taking approvals of working Drawings from Consultant / Client • Project Execution & Site Control activities • Commissioning of the Plant and Handover of Project • Preparation of Material supply & installation Bills, Billing Collection
Commitment

Software Skills

• eQuest 3.64 • energyplus 7.2 • N++ • Simergy • EP Quick • Climate Consultant 5.4 • eQ_Wth • D2SimViewer • xEsoview • Comcheck • Google sketchup8 • Auto CAD 2D 2012 • TACO Load • TACO System Analyser • Venti 3.1.2 • Mcquay 6.4 Duct Sizer • TRANE HDPysChart • Humid Air • PRO-E • Blender 2.63

Extra-Curricular Achievements

  • Got 2nd prize in the General Knowledge Quiz Competition held by MESO in the year 2003.
  • Got 1st prize in the general knowledge quiz event of ZENITH-2003.
  • Participated in Quiz, Essay, and Hastshilp competition in EVALANCHE-2006.
  • Taken one month training of Designing of HVAC systems at Hyderabad in year 2008.
  • Attended Two day Seminar on Effective Supervision in Jan. 2012.

 

Standards & Codes Known

  • ASHRAE 90.1-2007
  • ASHRAE 62.1
  • ASHRAE 170
  • ASHRAE 140
  • SS530
  • SS553
  • Green Mark point Scheme, Singapore
  • SMACNA

Career Objectives

To get the growth oriented position in the field of technical well as non-technical line with dedication & commitment