Printing tool Download PDF

Summary

<!--[if gte mso 10]> <style> /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin:0cm; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:10.0pt; font-family:"Times New Roman","serif";} </style> <![endif]-->

  • Trouble shooting of Huawei BTS3812,3812AE, 3900of both 2G & 3G technology.
  • Commissioning and troubleshooting of RTN950,910&RTN620 MWsystem.
  • Commissioning and troubleshooting of NEC microwave system.
  • Testing& Trouble shooting of E1 connectivity from BSC-SDH-BTS
  • Investigate & suggest the exact site having problem if we face a number of sites outage in the same Area..
  • PAT inspection of newly installed sites.
  • Troubleshooting and making realignment for Active and passive repeaters
  • Removing VSWR of the Sectors by using Site Master.
  • Verification of alarms of each site by using BTSM interface.
  • Troubleshooting and integrate of BTS External alarm
  • Re make of X-Connections in RTN &NEC, if found any trouble in connectivity.
  • To establish the NMS of RTN with the Combination of NEC Microwaves.
  • Configure the NEC to make the NMS.
  • Complete the PMR schedule on time by using Black berry WFMS system.
  • Integration for the 3G & its commissioning.
  • TSSR & NMS survey for the STC project in KSA

Work experience

Jun 2009Jun 2011

BSS Engineer (Huawei)

Batco

<!--[if gte mso 10]> <style> /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin:0cm; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:10.0pt; font-family:"Times New Roman","serif";} </style> <![endif]-->

  • Supervision and Monitoring of all installation and Commissioning activities ofHuawei BTS3012,3900,3900L,NodeB,DBS3900(WIMAX <E).

·Supervision and Monitoring Installation of RRU, Fibre Cable and Commissioning activities of Huawei BBU 3900.

·Configuration of MW links on RTN 950&RTN 600 i.e. 610, 620(1+0,1+HSB,1+SD) usingWeb LCT.

·MW Active and Passive repeaters alignment, troubleshooting.

·Expansion of BTS and swap activities.

·CWO and Integration of new sites.

·Preparing the Sweep Test Report(900/1800/2100)., Final Clearance Reports.

  • Installation of antennas and cables and its testing through Site Master.

·Software loading and commissioning of BTS using LMT.

·Conducting Pre-PAT & PAT of BTS and MW.

·Performing RF Survey for Sites & preparing Technical Site Survey Report.

·Perform operations on the BTS using Huawei Graphical User Interface (GUI) tool, Local Maintenance Terminal (LMT).

·Loading Script files and defines site external alarms via LMT.

·Commissioning of the site as per the transmission design.

Education

Jul 2004Jul 2008

B.Tech

J.N.T.U