Mohammad Ali Al Haj

Work History

Work History
2007 - 2012

Chef of Mechanical Engineer

From Chef of mechanical engineer at operation and maintenance project of makkah haram second extension we have 110 big air handling capacity from 200 up to 300 kw unit every unit carreir made-fire pump 120 hp- circulating pump-3 ultra violet lamp- submersible pump we make preventive and corrective maintenance according to maxemo system
2003 - 2007

Chef of Mechanical Engineer

From Chef of mechanical engineer at operation and maintenance project of royal mena and mena palace makkah the palace has three zons I was in middle zone has about 20 building for vip person, s and the mean building aldiwan has big dinning room big majles offices of vip person We have chiller york 600 cooling ton-air handling unit capacity 30 to 150 kw-fire pump 95 kw-mini and large split unit-royal kitchen-royal bathroom-cold store laundry-all our work don according to maxemo system
1998 - 2002

Chef of Mechanical Engineer

From Chef of mechanical engineer at operation and maintenance of ministry of interior makkah We have two tower 6 floor one royal anther vip with big dining and majles and royal kitchen in bedroom there use chilled water chiller for cooling york 380 ton air handling unit SKM-large split unit up to 8 ton-mini split unit-pump station for service water and fire fitting system all maintenance work don according to maximo system During this I issue master plane for preventive maintenance request spare parts follow up all works The company provided me training course for maximo system-supervisory development-water filtration
1996 - 1998

Supervisor of Mechanical Engineer

From Supervisor of mechanical engineer operation and maintenance project of royal mena palace I was in middle zone in this zone we have mean dewan building has big royal majjles and big dinning room with vip offices we have twenty Royall building for princes and vip persons we have carrier chiller and air handling unit and package unit mini split unit Royall bathroom and kitchen My duty to follow up preventive and corrective maintenance request spare parts select man power
1983 - 1986

Mechanical Supervisor

As site
mechanical supervisor engineer at shekh zaied mosque project at delma island near In this project twelve pakeg unit had been installed SKM made booster pump septic tank bathrooms From General company for metallic industry Damascus Syria As ahead of maintenance section in factory of house holed appliances This factory has hydraulic press welding machine metal die casting injection machine hydraulic cutting machine generator air compressor water pump My responsibility to prepare master plan for preventive maintenance for all production machine-request spare part-supervision all preventive and corrective maintenance work during this time I followed training course on elect welding in Ussr

Education

Education
1979

BACHELORS