Download PDF

MOHAMED HUSSEIN AHMED

Sr. Civil/Structural Engineer, Technical Office at Consolidated Contractors International Company(Without NOC IN Qatar!)

OBJECTIVE

Seeking a career that is challenging and interesting, a job that gives me opportunities to learn, innovate and enhance me skills and strengths in conjunction with company goals and objectives.

EDUCATION

20142016

Professional Engineer in Qatar - Grade B

MMUP in Qatar
  • Grade B - Ministry of Municipality And Urban Planning (MMUP), Qatar

Civil, Valid till 2016.

2014

Passed FE Exam - NCEES

American University in Egypt "AUC" – Engineering Department.
  • Fundamental Of Engineering Exam FE, April 2013
  • Joining professional and practice engineering exam PE, October  2016
19992004

Bachelor of Science, Civil Department

Cairo University, Egypt.

Grade: Good.

Graduation Project: concrete design

Objective

2012-032012

Seeking a career that is challenging and interesting, a job that gives me opportunities to learn, innovate and enhance me skills and strengths in conjunction with company goals and objectives.

Consolidated Contractors International Company(

Qatar, Doha

2011-062012-03

Office Engineer-Ccc

Technical
Office Engineer-CCC-Doha, Qatar. Structural Technical Office Engineer. SRACO-Dammam, Saudi Arabia.
2005-102011-06

Structural Team Leader Engineer

SRACO
Structural Team Leader Engineer.
2005-042005-09

Site Engineer

TEC
Cairo, Egypt. Civil Site Engineer.. Sabry Abo Zaid Office-Cairo, Egypt. EXPERIENCE
2012-03

Coordinator

Sr. Civil and Structural Engineer
Technical Office. Consolidated Contracting Company(CCC), Qatar. Responsibilities Leading the shop drawing process from the start till the approval(coordinating, reviewing, following-up and discussing with the consultant) Highlighting and discussing the clashes receive from BIM DEPT. with the consultant and raising RFIs if required. Conducting the clash analysis workshops with BIM department and provide alternative proposals if possible. Participating in solving site troubles either related to structural or civil. Follow-up and issued RLM and As-Built drawings. Studying all structural change proposal and try to minimize effect of both money and time Attending regular site co-ordination meetings with both sub-contractors and consultancy. Preparing and reviewing material submittal pertaining to civil work. Initiating the process OF NOV through filtering all new scopes and passing to contract and QS DEPT. Dealing with the design office to ensure their understanding to the as-built situation. Projects: Lusail commercial Boulevard(LCB) This package is related to the construction of road A3 cut and cover tunnel/structures plus all wet, dry utilities and services. The covered tunnel length is 655 linear meters while the troughs are 650 linear meters. The tunnel overall width is around 45 metres incorporating 3 cells; north and south bound roads with two lanes in each direction and an approximately 13 metre wide provision for a light rail transit system in the middle cell. The total quantity of concrete exceeds 300, 000 m3 and asphalts around 50, 000 tons. (Budget 0.9 Billion QR)

Contractor

Consolidated Contracting Company
Contractor: Client: QATARI DIAR REAL ESTATE INVESTMENT COMPANY.
2015-06

Designer

Parsons
Designer: Warrely Consultant: Dorsch Qatar/Marafeq Qatar PM/CM: Parsons international limited Period: From Laffan Refinery(LR2)
2009-09

Contractor

Laffan Refinery(LR2)
Similar to the existing Laffan Refinery(LR1), which started production in, LR2 will have a processing capacity of 146, 000 barrels per stream day and will also be operated by Qatargas Operating Company Limited(Qatargas). To be constructed adjacent to the existing refinery, LR2 will have a daily production capacity of 60, 000 barrels of naphtha, 53, 000 barrels of jet fuel, 24, 000 barrels of gasoil and 9, 000 barrels of liquefied petroleum gas(LPG). Contractor: Joint Venture of Chiyoda and CTCI Corporation.
2014-062015-06

Sub-Contractor

Consolidated Contracting Company

Sub-Contractor: Client: Qatar Gas. Period: From. Multipurpose Administration Complex Project Phase 1" MPAC" On the west side of the city, RLC's multi-purpose administration complex(MPAC) project is currently under construction. The MPAC Phase" 1" Development includes the design and construction of the office and canteen building, medical centre, helipad, central plant, and associated site development.

2012-032014-06

Contractor

Consolidated Contracting Company
Contractor: Client: Qatar Petroleum Period: From EXPERIENCE
2011-062012-03

Technical Office Engineer

Technical
Technical office engineer(from)
2010-102011-06

Project Coordinator

Technical SRACO
Project coordinator(from)