Work History

Work History
Nov 2012 - Feb 2014

Production Technologist

Petroenergy E&P
Aug 2011 - Nov 2012

Production Technologist assistant

Petroenergy E&P

Diverse field – coordinate production operations activities. Engage in field development studies and completion operations as well as pressure maintenance stimulation methods such as cyclic steam stimulation and nitrogen huff and puff projects.

Perform daily production engineering activities , Analyze production data and propose improvement. Apply wide optimization in partnership with diverse, multi-disciplined teams .Support field staff and operation engineers in important trouble shootings of problematic wells

May 2010 - Aug 2011

gas lift engineer

Petroenergy E&P

Retrievable Gas lift valves debugging:  from valve /mandrel inspection and calibration to unloading stages.

May 2009 - May 2010

Petroleum engineer intern

Ministry of petroleum , Central Petroleum Laboratories,Sudan

field :

Carrying out full engineering analysis of rig site data and preparing regular well reports. • Observed several well test and coring operations .observed operation problems and Fishing recovery of broken slick-line and pressure gauge at down hole. • Monitoring the daily progress of well operations and current daily costs. 


  • Conventional core analysis :Permeability, Porosity and Saturation.
  • PVT analysis: Constant Composition Expansion, Differential Vaporization, Open Hole Chamber Analyses, Pressurized Density, Pressurized Fluid Compositions, Sample Validation, Separator Tests and Viscosity.


2015 - Present

Molde specialized university in logistics 

MSc in petroleum Logistics

2014 - 2014

Norwegian Language and Society

University of Nordland (UiN)

 Norwegian Language and Society

Jan 2004 - Jan 2009


Sudan University of Science and Technology

petroleum engineering




Arabic , English and Norwegian

Petroleum Engineering

Have BSc in petroleum engineering .

Artificial Lift Design

i worked with gas lift , PCP, ESP and sucker rod pumps


I was involved in the artificial lift design for more than three years

Gas Lift wells

design ,start up , adjust injection rate ,troubleshooting and optimization.


Completion design, Oil well performance analysis, Nodal analysis., Sensitivity analysis.,Gas lift & ESP design, production optimization.

OFM software

water analysis , data and reporting


Prioritizing maintenance work orders.


Cyclic steam stimulation , N2 huff and puff and gas injection.

Upstream chemicals

i was involved in several upstream chemical operations in order to maximize oil production .such as :demulsifires and anti foamers .



PIPESIM (version 2010)

training courses

Stavanger, February 2013 /ASME

  • Gas lift troubleshooting & optimization.

Malaysia, October 2013 /University Technology Petronas (UTP)

  •  Drilling Engineering fundamentals. and Drilling fluids.

Khartoum ,July 2012 /Binning oil tools S.A

  • Production operations

Khartoum,October 2012 /Schlumberger SIS

  • PIPESIM fundamentals (version 2010). 
  • Production optimization workshop using PIPESIM.