Mohamed Riyas

  • Abudhabi Abudhabi
Mohamed  Riyas

Sr. Architectural Draftsman

Work History

Work History

May 2013 - Present

Sr Architectural Draftsman

Fibrex Construction Group
Abu Dhabi, UAE, to at.. Sr Architectural Draftsman Nature of Work:- Developing Architectural General arrangement Shop drawings coordination with MEP works and incorporation of RFI's received from Client/consultant in coordination with architectural finishes. Preparation of Fit out Drawings. Preparation of toilet layout Drawings Preparation of Drawing schedules. Preparation of RFI. Preparation of Door schedule. Preparation of material submission & material schedule Preparation of Reflected Ceiling plans and Details 10 Preparation of O&M Manuals. 11) Preparation of inspection request to consultant. 12) Preparation of site progress report. 13) Dealing skillfully with a diverse range of people including clients, architects, other engineering professionals. Key Projects:- Yas Mall Abudhabi:-For this project we did all the Wall gladding and wooden flooring. The project handed over Baynunah Academic Complex Badha zayd.:-In this project we are doing as main contractor. The project is on finishing stage. Najmath Residential Complex Abudhabi:-In this project we are doing as main contractor. The project involves construction of a residential tower comprising 3 basement levels, a ground floor, 3 parking levels and 23 additional floors which will offer 229 apartments. Emirates National School Sharjah:-In this project we are doing as main contractor. The project includes multi story School Building and Students Residential apartments. The structural work on going Shooting Club Residential Project Abudhabi:-In this project we are doing as main contractor. The project Includes Residential Villas, apartments and Community center. The project is on finishing stage.
Aug 2008 - May 2013

Jr Draftsman-Architectural & Structural

ALEC al jeber L. E.G
T Engineering and Contracting), Dubai, UAE... Jr Draftsman-(Architectural & Structural) Nature of Work:- Preparation of Architectural General Arrangement Drawings. Preparation of Structured General Arrangement Drawings. Preparation of Fit out Drawings. Preparation of Landscaping Drawings. Preparation of Survey Drawings. Preparation of Ceiling and Partition Drawings. Preparation of toilet layout Drawings. Preparation of Logistic Drawings. Preparation of Site progress layout. 10) Preparation of MEP Drawings. 11) Preparation of Manhole Drawings. 12) Preparation of Drawing schedules. 13) Preparation of Site progress report. 14) Preparation of Drawing for planning Department. 15) Preparation of Door schedule. 16) Preparation of Door detail Drawings. 17) Preparation of RFI. 18) Maintaining Document Control. Key Projects:- Mirdif City Center:-One of the UAE's largest super regional centers focused on lifestyle and community facilities, Mirdif City Centre features 440 outlets in a two-level mall, with associated parking and energy centre. We did the project as Main Contractor.
Aug 2006 - Apr 2008

Draftsman

Span Engineering Consultancy
Kerala, India Draftsman Nature of Work:- Preparation of IFC Drawing Preparation of Estimation Preparation of Planning Schedule. Preparation of Survey Drawings Preparation of Site Layout Types of Projects:- Residential Apartments Commercial Buildings Shopping Mall Hotels & Resorts Hospitals Mosque

Education

Education
Aug 2004 - Aug 2006

Draughtsman Civil

HAMAD Industrial Technical Institute

1 Planning, drawing, estimating, and costing of civil work
2 Drawing plans by using Auto CAD
3 Making of 3D models of civil work
4 Giving lineout at site, supervision of civil work etc
Jul 2002 - Mar 2004

+2, Commerce

GVT. Higher Secondary School Manjery

1. Commercial Mathematics & Statistics

2. Mathematics

3. Economics/Banking

4. Accountancy

5. Business Studies