Download PDF

Work experience

Aug 2011Present

Planning Section Head Engineer

Alkan CIT Group

                   Since August 2011- Up Now my current job is: Planning Engineer (Section Head).

  • Develop and follow up on material planning process to ensure that the required materials are available and prevent material shortage.
  • Follow up on move orders made by maintenance coordinators for monthly quantities to be issued and make approval to it.
  • Work within company’s cost quantity, and quality requirements to plan the flow of supplies.
  • Following up the weekly consumption for every region to can make a complete analysis for total consumption vs. ideal stock in order to reduce the inventory cost.
  • Developing the material reports to be generated from ERP system rather than using Excel sheets for more accuracy and to save time (cost).
  • Making PR’s and W.O’s to prevent material shortage.

  

Aug 2008Jul 2011

Construction Engineer (Central Region)

Alkan Networks

New sites installation.

All civil works had been ready to make sites ready to be ON AIR.

Feb 2006Aug 2008

BTS & Generator Coordinator Engineer

Alkan Networks

Since January 2006 my current job is: BTS & Generator & BTS Coordinator Engineer (Alkan Networks Dahab Office).

Apr 2004Jan 2006

BTS Engineer

Alkan Networks

Since April 2004 my current job is: BTS Engineer (Alkan Networks Eastern Region- Vodafone Maintenance Department.)

  • GSM Antenna System.
  • Site Master Antenna, Cable and Spectrum Analyzer.
  • Power Distribution System.
  • 3G & 2G Antenna System.
  • Maintenance.

Electrical Components Maintenance (Inside & Outside Shelter).

Education

Sep 1998Jul 2003

Cairo University Faculty of Engineering

The Electrical Power Engineering.

Sep 1995Jul 1998

El Orman Secondary School

Secondary Education

Skills

ORACLE*
ERP
EXCEL
VISTA
POWER ENGINEERING

Alkan CIT Group

Networks and Telecom

Portfolio