Download PDF
  • Bldg no. 2-B , Remas Compound , Mohamed Naguib axis, New Cairo, Egypt
  • +201142344478

Islam Mehrez

Architect & Project coordinator 

Career Objective

Seeking a challenging position as a architect  in a well reputable company in which my experience, accomplishments and proficiency will allow me to achieve my career goals.

Education

 2014

Bachelor Degree Of Architectural Engineering

 Faculty of Engineering, ,Helwan university – Egypt . 

Graduation project:  A+

Grade achieved : Very Good

2009

General Secondary School

El Ekhlas private school, Salmia – Kuwait .

Grade achieved : Excellent 

Work experience

Jul 2014Present

Design Development Architect & Project coordinator

 Dar el Handassah Consultants
  • Projects coordination, disseminating information to all concerned parties and ensuring mutual understanding and agreement on all project phases.
  • Coordination between architectural and other disciplines ensuring high accuracy of project.
  • Issue final drawings for project through the BIM technology and REVIT.

Projects:

  • Hotel at Central Business District ( CBD ) - New Administrative Capital - Egypt.

The Central Business District ( CBD ) has a built up area about 193 Feddan which consists of 19 towers divided to commercial towers, offices towers, hotel towers , residential towers and the tallest tower in Africa ( The ICONIC) .

The Hotel is subdivided into two different towers connected with a common podium for the first two floors(Retail area) while the rest of the floors are divided into hotel guest rooms for the first tower and the  service apartments for the other one. 

  • Service building - Workshop Building - CUC Building - Al-Madina Al-Monwara - KSA.

Three buildings, iThe service building are used to serve the holly mosque by all Electromechanical services. The Project also include workshop building with a huge space for all kinds of works.

  • Madina project-Prophet’s Holly Mosque - Al-Madina Al-Monwara - KSA

Main Design Concept

Due to the growing number of visitors and worshipers coming from all over the world to Madinah and the Prophet’s Holly Mosque, emerged the need to study increasing the capacity of the Prophet's Mosque building and its surrounding piazzas to accommodate the necessary services needed to meet the visitor’s numbers increase in this holy Islamic location.

  Basics of Design

The design concept is based on the construction of a new building for the expansion of the existing Holly Mosque surrounding it from the Northern, eastern and western sides keeping intermediate spaces used as shaded piazzas for circulation and prayer with the addition of a new floor above the existing King Fahd expansion

Mar 2013Jul 2014

Interior Designer & Site Engineer

Makany Design office
  • Determine the client’s goals and requirements of the project
  • Sketch preliminary design plans
  • Specify materials and furnishings, such as lighting, furniture, wall finishes, flooring, and plumbing fixtures
  • Prepare final plans, using computer applications
  • Create a timeline for the interior design project and estimate project costs
  • Place orders for materials and oversee installing the design elements
  • Visit after the project to ensure that the client is satisfied

Training and Internships

2016

KNAUF

Training-Method of Installation and maintenance of dry wall systems and gypsum board

2014

EHAF consulting Engineers

Technical Seminar-Green Architecture and Sustainable buildings 

2013

MADAMIK ACC

Interior Design Workshop

2013

GULF consulting Group-Kuwait

Training-Technical Site Office- Shadadia University

2012

Amal el Saraf- Design office-Kuwait

Traning-Technical Design office

Skills

Language
  •  Arabic (Native).
  •  English(Very Good)
Computer 
  • Autodesk Auto Cad
  • Autodesk Revit Architecture - essential 
  • Autodesk Revit Architecture - advanced 
  • Autodesk Revit Dynamo
  • Autodesk 3Ds max
  • Autodesk Vasari
  • Autodesk Navisworks
  • Adobe Photoshop
  • Google Sketch Up
  • Rhinoceros
  • Ms. Office

Personal Details

Nationality: Egyptian.

Date of birth: 23th December , 1991.

Marital status: Married.

Military status: Exemption.