M.H. Prasadja

  • DKI Jakarta, Indonesia, 
M.H. Prasadja

Infrastructure and Facility Assistant Manager

Summary

38 years old Civil Engineer has Project Management proven experiences in Infrastructure and Facility Construction ( Manufacture and Mining Industry). Strong Leadership and Managerial Skills. Skilled in using Computer Aided Design (CAD)softwares such as SAP2000, Autocad, MS Project. And also Strong in reporting with MS Office softwares.

Work History

Work History
Sep 2011 - Present

Infrastructure and Facility Assistant Manager

PT. Mercedes Benz Indonesia
  • Manage and monitor all Infrastructure and Facility Investment Budget.
  • Develop an Engineering/Design Management Plan in production process and optimization of production facilities (Trimming Line, Assembly line, Mechanical Line and Production line) and non-industrial facilities to support Company's long term production forecast and avoid any inconsistencies and surprises, forecast capital cash flow and resources requirements.
  • Ensuring all Project activity related to ISO/TS 16949, ISO 9001, ISO 14001, ECO Industry and Daimler AG Policies and Guidelines standart
Jul 2008 - Aug 2011

Infrastructure and Facility Senior Engineer

PT. Saptaindra Sejati (Adaro Energy Subdiary)
  • Manage and monitor all budget cost for Facility maintenance and Infrastructure project on the site.
  • Develop Design Management Plan and Guidance Field Engineer for Construction activities related maintenance and new project of Infrastructures.
Dec 2006 - Jun 2008

Site Engineer Supervisor – School Reconstruction Projects

United Nation Office For Project Services (UNOPS)
  • To ensure compliance of construction works to the standard quality defined in the contract document   including, but not limited to drawings, UNOPS and SNI specifications, bills of quantities, Building Code Nanggroe Aceh Darussalam Province, responsible for all architectural, civil and mechanical elements of the works.
  • Maintaining an inspection report in English at the end of each day recording all activities related to the construction works.
Mar 2005 - Nov 2006

Civil Engineer

PT. Perkasa Inakakerta ( BAYAN RESOURCES)
  • Supervising construction work activity on the coal mine site.
  • Ensuring quality or material used and works defined with the drawing and Contract documents.
  • Generate quantity take-off based on drawings and direct field survey.
  • Review, analyze, and recalculate every preliminary cost estimation prepared by Project Engineer or any other department by reconsidering all aspects of engineering drawing, specification, and standards, work method, and any other supporting information
  • Periodically update data of labor, material, and equipment unit cost rates, in order to provide the most appropriate realistic cost estimation.
Jan 2004 - Jan 2005

Heavy Equipment Sales Engineer

PT. Intraco Penta, Tbk
  • Developing sales and market shares by looking for new customers
  • Controlling customer’s payment by monitoring and observing any overdue payment

Education

Education
Aug 1995 - Jul 2003

Bachelor Degree of  Civil Engineering

Universitas Islam Indonesia

Civil Engineering

Skills

Skills

MS Office

Create Report, Chart and Presentation

Ms Project

Project Controling with MS Project

AUTOCAD 2D

CAD drawing with AUTOCAD 2013

Certifications

Certifications
Aug 2014 - Aug 2014

Project Management

Project Management Academy (subdiary of Bridgit)

Managing a Project

Feb 2014 - Feb 2014

Integrated ISO/TS 16949 Core Tools

Neville Clarke Indonesia

Determine Quality of Production Process

Sep 2013 - Sep 2013

The Awarness Eco Industry

TUV Rheinland

Awarness  Konowledge for Implementation Eco Industry Spesificiation Standart

Oct 2010 - Oct 2010

Integrated Management System ISO 9001: 2008 and OHSAS 18001 : 2007 Lead Auditor

ALLSYS

Audit system as ISO 9001 and OHSAS 18001 standart

Text Section

Accomplishment

  •  Project Development Engine Assy Building (Mercedes Benz Indonesia)
  • Project of Line Production Facilities and Utility for New Product (Mercedes Benz Indonesia)
  • Project of Hostel for trainee (Mercedes Benz Indonesia)
  • Project of New Additional Car Storage Shelter (Mercedes Benz Indonesia)
  • Project of New Waste Storage building and Waste Processing system (Mercedes Benz Indonesia)
  • Contruction of Site Office (Adaro)
  • Reconstruction of Heavy Equipment Washing Bay Facility (Adaro)
  • Construction of Magazine Warehouse and Facility(Adaro)
  • Construction of Staff Housing and Temporary Shelter (Adaro)
  • Construction of Heavy Equipment Workshop for HD 785 (Adaro)
  • Construction of Oil Lube Station Storage (Adaro)