• Singapore SGP

Meyyapparaj Meyyanathan

Work History

Work History

Project Associate

Sep 2014 - Sep 2015
Anna University, Department of Transportation
Designation: Project Associate Location: Chennai, India Project: Study on passenger travel characteristics and Identification of measures for improvement of patronage in TNSTC Villupuram Buses. Job Responsibility: Assessing the travel Demand and travelling pattern of Villupuram bus passengers. Building complete bus route network in TransCAD and analyzing its spatial connectivity to the Urban and Rural areas. Loading profile of the buses for the optimization of the routes was developed. Route Rationalization for the inefficient and overlapping routes with the help of TransCAD. Carried out passenger preference survey with the commuters of all available modes and built a Multinomial mode choice model using NLOGIT software. IT Skills Working Knowledge ArcGIS 10.1, Mapinfo 10.5 for GIS mapping. TransCAD 6 & Cube 5 for Transport Planning. AutoCAD Civil 3D for Highway Designing. N-Logit for Mode Choice Modelling. SPSS for Statistics. Basic Knowledge LinSIG 3.1 for Traffic Signal designing and Arcady 8 for Junction designing. Vissim for Microscopic Traffic Simulation.

Assistant Highway Manager

Aug 2010 - Mar 2012
Reliance Infrastructure limited
Designation: Assistant Highway Manager Location: Hosur, Tamilnadu, India. Job Responsibility: Coordinated the construction activities of six laning of National Highway-7 from Hosur to Krishnagiri(60 KMS). Involved in conducting Engineering Surveys and Investigations such as Topographic Survey, Benkelman Beam Deflection Survey, Axle Load Survey, Traffic Survey, Sub-grade Investigations, Road and Structures Inventory Survey. Supervised all construction activities including on-site checks of the execution of Highway works, quality and quantity control, and provided advice on remedial actions as required. Involved in reviewing and verifying the design specifications of Highway plan & profile, Intersections & Bus layouts before and during its implementation at site. Updated daily and weekly progress reports and discussed about key milestones with Project Manager.




University of Southampton


National Institute of Technology