Mahmoud Atia Mortada

  • Jeddah, Kingdom of Saudi Arabia (KSA)
  • +966 546592908        +966 547025364
Mahmoud Atia Mortada

Quality Manager


Right now I want to work for a reputable and exciting company like yours where there will be a big stage for my talents. Therefore I would welcome the chance of an interview, where we would be able to discuss in greater detail the value and strength I can bring to your already successful company.

As you will see, I have a great and varied experience in the field of construction (12 years), where I worked as a site engineer, consultant engineer, QC engineer and my currently job is Quality manager.

I also have excellent experience in dealing with computer software.

Work History

Work History
Aug 2015 - Present

QC Manager

Contracting Saudi company  DNGO
  1. Ensure that Quality Management Systems (QMS) are implemented and maintained in accordance with the defined quality standards
  2. Liaise with the Project Manager regarding project quality matters,
  3. Initiate action to prevent the occurrence of any non-conformance and stop any non-conforming works from proceeding without rectification and Review the preventative actions recommended in non-conformance report
  4. Initiate and verify corrective actions to prevent reoccurrence of non-conformity.
  5. Initiate record and provide solutions for quality problems.
  6. Ensure that all site personnel including sub-contractors follow the quality assurance system and implement training of site personnel.
  7. Periodically audit conformance of the contractor and subcontractor QMS.
  8. Approve the ITP’s and Field Inspection procedures.
  9. Liaise with client quality personnel to ensure the specified requirements are compiled Approve QA requirements stated on purchase requisitions and orders Comply with all the requirements handing over documentation for the milestone achievements and end of the project.
  10. Coordinate with site QC Engineers in the day to day functioning of the department and act as the focal point of the contractor quality organization.
  11. Liaise with the Corporate Quality Manager with regards to quality related issues and project QMS performance.
  • (Jeddah strategic reservoir - phase 3. Faisaliah)
  • Client : National water company NWC
  • Consultant:
  • Contractor : Contracting Saudi company DNGO
  • The project budget is 350 million SAR
  • The Project is Design, supply& install and commissioning of (4 concrete tanks, pump Building, electrical Generator Building, Chlorination Building, Administration Building, Guard House, chemical storage, water testing lab. Building, storages, electrical works)
Feb 2012 - Aug 2015

QC Manager

Nahdat Al-Emaar Contracting Co. Ltd
  • (Hail University Hospital project)
  • Client : Ministry of higher education
  • Consultant: Zuhair Fayez partnership Consultant
  • Contractor : Nahdat Al-Emaar Contracting Co. Ltd
  • The project budget is one billion SAR

The project is Design and construction of the Hail university Hospital which has area 541325 m²and the building area is 138040 m².the project also contain the service building ( pump and boiler) , the service tunnel and Ground tank

Oct 2011 - Feb 2012

Resident Engineer

  1. Site Investigation, Data collection, Report preparation.
  2. Review approved contractor’s submittals; drawings, calculation and detailed engineering documents, transformers, etc. and assure design implementation at site.
  3. Progress monitoring of Contractor in line with agreed time schedule.
  4. Controlling of works according to the specifications and contract.
  5. Review of Contractor’s invoice in line with progress of site works.
  6. In-depth knowledge on QA/QC procedure and system.
  7. Responsible for site inspection and testing.
  8. Responsible for site safety and safety audit.
  9. Supervision and monitors works for all civil items (Concrete/ steel).
  10. Supervising subcontractors who provide specialist assistance for parts of the project

 (Project fences and control towers - Abu Sultan – Ismailia)

The project is building a fences ( 5000 m ) and control towers (10 towers)  for Abu Sultan Pharmaceutical Company, the project budget up to Seventeen million pounds

Jun 2010 - Oct 2011

Senior Consulting Engineer


(P&G Manufacturing Expansion Project)  

The project is building a Baby care factory in 6th October city Cairo, Egypt

The owner is Procter & Gamble international company

The general contractor "Orascom Construction

The project budget is one billion pounds, including equipment’s

The factory area is 462 000 m² percentage of buildings to 30% of the total area of project

The main structure for the project is RC concrete footing and the columns and floors are steel.

May 2008 - Jun 2010

Senior Consulting Engineer


(Madendi  project )

This is the project of Building an integrated city lies an extension of the new city of Cairo on the Cairo-Suez road. The area of Project is 33.6 million square meters or about 8000 acres.

Owner of the project is the Arab Company (one of the companies Talaat Mustafa Group).

Consultants: Engineering Consultants Group (ECG), (Dar el handasa) and SWA & HHCP & SASAKI.

Contractor: Alexandria Company (one of the companies Talaat Mustafa Group).

The project aims to provide housing needs of 600 thousand people in 120 thousand housing units different (buildings and villas) as well as green spaces and golf courses, hotels and recreational areas and regions of different services of science and technology, sports halls, exhibitions, conferences and medical ,shopping centers and schools.

Mar 2007 - May 2008

Consultant Engineer

Dorsch Group Consult (DC) water and Environment

 (Sewer Line project )

I worked as a consultant engineer in the team work of the Dorsch consult office at participatory Urban Up-Grading Project, Boulaq el Dakrour (Contract 1 to 4) funded by the government of the federal Republic of Germany through the amount of 5.0 million Euros.I gained experience in supervision of works for sewer and water supply network.

Feb 2006 - Jan 2007

Site Engineer

Alpha for Industries&Construction

This is Project is a building on form (S) on three levels and three roles (the building is training pilots and hostess) (Building flight simulator).the area of project is 35000 m2.

Client: Egypt air 

Jun 2005 - Feb 2006

Site Engineer

Alpha for Industries&Construction

This is project is building a steel storage on the 12000 m2 at the port of Dekheila, Alexandria. The columns are RC concrete with the frame steel structure.

Aug 2004 - Jun 2005

Site Engineer

El-Banna for contracting 
  • ( Theatre project )

 Client: the Ministry of Culture

 The project consists of the theater building and services building such as Public library, music rooms, drawing Rooms and sculpture rooms. We use the frame systems in the building.

May 2003 - Aug 2004

Site Engineer

El-Banna for contracting 
  • ( Dewaqa project-17 building )

This project content a 17 building full complete construction, finishing and the Landscape and the surrounding apartment project grant from the UAE Emirate of Abu Dhabi.


1997 - 2003

B.SC. Civil Engineering

Zagazig University, Egypt
  • Member of the Egyptian syndicate of engineers.
  • Member of the Saudi syndicate of engineers.
  • Preparation and study PMP certification


PMP Course                                 From 2015
Primavera                                    From 2002
AutoCAD                                       From 1999
SAP 2000                                      From 2000
OSHA                                             From 2010
MS-office                                      From 2000
MS PowerPoint XP                  From 2002

Photos "Hail University Hospital project"

Photos "P&G Manufacturing Expansion Project"

Photos "Madendi project"