Mahmoud Abd el Mohsen Mohamed Ahmed

Work History

Work History

IPMA

IPMA
Preparation & Qualification of Beginner Engineer:-(phase 1) the Arab contractors-management & technology training institute(MTTI): Preparation & Qualification of Beginner Engineer:-(phase 2) the Arab contractors-management & technology training institute(MTTI) May 2004: WASTE WATER TREATMENT PLANTS& sewer networks. The Arab contractors-management & technology training institute(MTTI) August 2005: Quality Control:- The Arab contractors-management & technology training institute(MTTI) March 2008: Q uality assurance:- The Arab contractors-management & technology training institute(MTTI) April 2012 till july: The
Jul 2012 - Present

Supervisor

AAW CONSULTING ( Ahmed abd el-wareth)

Supervision for finishing stage in the housing project for Saudia Arabian national guard. Supervise the work of the implementation of the finishing for interior and exterior for the housing villas in Taif city.

Project Description:-The project contains(750) villas.

The owner:-Saudi Arabian National Guard (SANG).

The contractor:-Saudi Binladin group

Budget:-975 miliones S. R.

Nature of work:- Inspector Engineer for the work of supervising the implementation.

May 2009 - Jun 2012

Inspector

ACE CONSULTING ENG. MOHARRAM- BAKHOUM

 Inspector eng. For Sanitary Drainage projects in MARSA MARTOUH. Supervise the work of the implementation of networks and pumping stations and force pipelin of the draft Integrated sewage of the city of Marsa Matruh.

Project Description:-Networks downhill length of about 70 km in diameters from 175 mm to 800 mm of clay and plastic and HDPE pipes, and(3) pumping stations and branches(1) and the main station(1) pumping station to help(the poster) and(5) force pipelin are expelled from the tubes and polyethylene and ductile iron double diameters 250 mm length of 4 kilometers and 500 mm length of 8.5 km and 700 mm length of 22 Km length, In addition to the work of drying sub-station and use Alngues to download and also draining of the networks and using all underground drainage.

The owner :- National Organization For Potable Water And Sanitary Drainage

The contractor:- AL-NASR General contracting company ( Hassn allam & co.) Budget:- 145 miliones L.E. Nature of work : -Inspector Engineer for the work of supervising the implementation.

Mar 2008 - Apr 2009

: Site manger and tech. office

DAR AL-BENAA CO. FOR BUILDING AND CONSTRUCTION

Site manger , and tech. office for the project .

Project description :- Building 210 unites for the youth in  new Sohsg  city and 300 unites in   new Assiut city .

Owner :- The New Urban Communities Authority , new Sohag and  Assiut city .

Budget:- 27 miliones L.E.

Jan 2005 - Mar 2008

Site engineer , tech. office , quality control

THE ARAB CONTRACTORS (OSMAN AHMED OSMAN AND CO.)

Site engineer , tech. office , quality control

 Filtered water pump station 400/800 L/s The INDUSTRIAL CITY-QEFT-KENA Project Description:-outlet greywater component of a building  for the pumps and the building of obstetrics and transformer and an office building and then the main force pipeline  from the cast-iron pipes flexible diameter 450 mm length of about 5 kilometers, then the treatment plant and is composed of a reservoir receiving greywater, and building pumps And the distribution wells  of  water and (4) clarifier and filters and Ground Reservoir capacity 5000 m3 and building clearance sludge and (4) drying pools and chlorine building and similarities, chemicals and some ancillary buildings .

 Owner:-National Organization For Potable Water And Sanitary Drainage

Budget:- 50 miliones L.E.

Sep 2005 - Feb 2008

: Site engineer

THE ARAB CONTRACTORS (OSMAN AHMED OSMAN AND CO.)

Site  engineer - the work of the Technical Office - the work of quality control

Wood Farm project for the waste-water of  The INDUSTRIAL CITY - QEFT –KENAon an area of ​​500 acres  .

Project Description: - Line of the expulsion of 400 mm diameter GRP Length of 3 km and (2) basin balancing capacity of 10000 m 3 and desalinate water station and the center-filtration and a network of plastic pipes with diameters from 100 mm to 400 mm on an area of ​​500 acres

Owner :- National Organization For Potable Water And Sanitary Drainage

Budget:- 30 miliones L.E.

Jan 2007 - Dec 2007

Site engineering and tech. office

THE ARAB CONTRACTORS (OSMAN AHMED OSMAN AND CO.)

Site engineering and tech. office of the project  , shope drowing , co-ordanate working - quality control.

The sewage of Qefft city - QEFT –KENA

Project Description: -Networks downhill length of about 50 kilometers in diameters from 175 mm to 800 mm from the pottery and (4) lift stations, the main station and three substations and the force pipelin  of GRP Pipes 700 mm length of about 25 km and the treatment plant in a natural way (oxidation ponds).

Owner :- National Organization For Potable Water And Sanitary Drainage

Budget:- 95 miliones L.E.

Oct 2006 - Dec 2007

: Site engineer and tech. office

THE ARAB CONTRACTORS (OSMAN AHMED OSMAN AND CO.)

Site  engineer and tech. office of the project  , shope drowing , co-ordanate working - quality control.

Compact unites for filtered water  for the ROM villages in Kena

 Project Description: - (2) water plant built consisting of mains water gray and Pardes uploaded and then the main station and is a clarifiers and filters, and beneath them pumps and tank ground and supplement the body of the station chlorine and similarities, and some ancillary buildings and (10) drying beds

Owner :- National Organization For Potable Water And Sanitary Drainage

Budget:- 10 miliones L.E.

Jan 2004 - Jan 2005

: Site engineer

THE ARAB CONTRACTORS (OSMAN AHMED OSMAN AND CO.)

Site  engineer - the work of the Technical Office - the work of quality control

DEVOLOPING OF THE UNCOMPLETE OBLISK IN ASWAN( 15 millions LE ) .

Budget :- 15 miliones L.E.

Feb 2003 - Dec 2003

Site engineer ( finishing stage )

THE ARAB CONTRACTORS (OSMAN AHMED OSMAN AND CO.)

Site  engineer ( finishing stage ) - the work of the Technical Office - the work of quality control

Project Description: -Development of the old airport and entrance hall and procedures hall, the execution of the works include fmarble     and granite,ceramics      and interior partitions production company Mopica , suspended ceilings of jypsum board and other materials , Aluminum windows and doors , and many kinds of paints from many companies .

Owner :-  The Ministry of Aviation.

Budget:- 270 millions L.E.

Education

Education
Feb 2003 - Mar 2008

very good

the Arab contractors-management & technology training institute(MTTI)

- Preparation & Qualification of Beginner Engineer(phase 1)

The Arab contractors-management & technology training institute(MTTI)

- Preparation & Qualification of Beginner Engineer(phase 2)

The Arab contractors-management & technology training institute(MTTI)

- WASTE WATER TREATMENT PLANTS& sewer networks.

The Arab contractors-management & technology training institute(MTTI)

- Quality Control

The Arab contractors-management & technology training institute(MTTI)

- Quality assurance

The Arab contractors-management & technology training institute(MTTI)