Download PDF

Magnus Lai

Project Coordinator at Wabtec Control Systems

Work experience

2016-03

Project Engineer

Wabtec Control Systems

Project Engineer at

June 2015October 2015

Student Intern - Assembly Plant TP-46-01

BMW Group/MINI
  • Worked at the MINI Plant Oxford, based within the Assembly Hall and worked within the department of
    TP-46-01 (Technical Planning).
  • Team was comprised of Mechanical, Electrical and Control Engineers. Undertook various duties
    assisting the Engineering team.
  • Internship was organised through QUT.
19462001

Project Supervisor

Wabtec Control Systems
MINI Plant Oxford-TP- Project Supervisor at
2014-012014-12

Electrical Supervisor

Rio Tinto

1 year) Conducted various Locomotive unloads. Involving installation, testing and commissioning of Evolution series Locomotives being added to the Iron Ore fleet. Electrical Supervisor at Ansaldo STS

2010-062013-02

Electrical Supervisor-Ecp

Evolution
2 years 9 months) Electrical Supervisor-ECP Project(2012-2013) Project involved the upgrade, testing and commissioning of several subsystems on Rio Tinto's Dash 9 and series Locomotives. Upgrades included: Page 1
20062010

Electrical Apprentice

Electro Group Apprenticeships and Training
  • Domestic Installations
  • Commercial Installations
  • Railway Signalling - Majority of work in Moranbah, Central QLD area
    • Coppabella Railyard Upgrade
    • Beerwah, Mallawah, Watonga Track Duplication
    • Dalrymple Balloon Upgrade
  • Switchboard Manufacturing

Education

20132018

BACHELORS

Queensland University of Technology