Kamal Khan

Kamal Khan

Electrical Engineer

KAMAL AHMED KHAN S/o Muhammad Bashiruddin Khan

Date of Birth: 03-June-1985

Address: A-346, Street#15, Sector 14-B,

Shadman Town, Karachi, Pakistan


Email: Kamal_khan85@hotmail.com


An appropriate, challenging and dynamic job in a reputable multinational organization using my management and technical skills with an opportunity for advancement.


Interests in Project Management, Risk Management, Business Development.

Work History

Work History
Feb 2008 - Present

Electrical Engineer

Tuwairqi Steel Mills Ltd.

Roles & Responsibilities:

Responsible for all work from Execution till Commissioning & post-Commissioning activities, direct reporting to Manager (E & I). Brief responsibilities are as follow but not limited to:-

·Smooth execution of work at site according to approved standards & drawings.

·Evaluation of feasibility of drawings with respect to site condition and make

      necessary changes in coordination with design team to freeze final drawings.

·Planning & monitoring of activities within time, cost & quality constraints.

·Prepare To do list, Check list & Punch list.

·Prepare maintenance plans, progress reports & lessons learned at each project  phase/cycle.

·Attend project progress review meetings.

·Effective utilization of resources & Man-power management to increase productivity.

·Prepare BoQ, estimating Man-hours, Material indenting & Bill verification.

·Conflict & Risk Management & preparing root cause analysis.

·Implementation of HSE SoP’s & guidelines.

·Coordination with mechanical, Process & Procurement depts.

·Building competitive & motivated team.

·Dealing & negotiations with vendor.

Technical Skills:

HI POT test, CT polarity and saturation, CT/PT turns Ratio by primary injection and VCB Contact resistance testing of 11KV & 6.6KV AREVA WKC 31.5KA switchgear.

Testing and commissioning of 400V, 50KA LV switchgear (IMCC) by using Intelligent modules Siemens SIMOCODE PRO V and SOFTSTARTER 3RW44.

FAT of 15MVA Power Transformers with OLTC and 2MVA distribution Transformers.

Installation, testing and commissioning of 110V, 40KVA SAFT online UPS Cum stabilizer with SBS having 196AH NICAD batteries.

Installation and commissioning of 125V DC Redundant Battery backup system for 11KV, 6.6KV & 400V switchgear controls.

Testing and commissioning of 11KV, 3 & 4 way Schneider Electric RM6 Ring Main units with SF6 breaker and disconnectorequipped with VIP300 self powered Protection Relay.

FAT(heat run, Locked rotor, No load run, winding resistance using DLRO and vibration test) of 400V Siemens squirrel cage induction motors.

Erection and Pre-commissioning of 34MW Kawasaki GPB-70 Gas Turbine combined cycle power plant.

Parameter settings of MICOM feeder management P143, Motor management P243 & Trafo protection P632 Numerical Protection Relays.

Testing & commissioning of 600KVAr PFi Panel with Nokian Capacitor Relay.

Installation, Meggering & RTD Test of MV Motors up to 6150KW.

LV & MV cable selection/sizing/testing including MV termination Kits.

Soil resistivity test and execution of Earthing at site.

Control Valves Testing(Fisher, Metso, Jamesbury)& calibration.

Installation of NDIR Analyzer, O2 Gas Analyzers & Mass Spectrometer for online analysis of gases.

Installation, testing & commissioning of Temperature, Flow, Level & Pressure measuring instruments and inter-connection with DCS Honeywell Experion PKS.

Worked on Cable schedules, JB schedules, Isometrics, P&ID, motor interconnection diagrams, Functional Logic Diagrams etc.


Jun 2008 - Dec 2010


NED University of Engineering & Technology



Protection System

Short circuit calculation, load flow studies, protection relay parameterization

Testing & Commissioning

Testing & commissioning of Power Transformers, 11KV, 6.6KV Switchgear, 400V MCC, MV/LV Motors, Battery Charger, Pfi Panel etc

Project Management

Sound hands on experience in Project Management with approved tools and methodology. Planing & Scheduling activities.



Fellow Member

Pakistan Engineering Council