Download PDF
  • Jakarta DKI Jakarta
  • 082133611849

Krisna Aji Pratama, ST, MM


Personal Detail

Name : Krisna Aji Pratama, ST, MM
Address : Sendang Utara 5 no.15 A RT 005/RW 008 Semarang, Central Java 50191
Date of Birth : Jakarta April 11, 1988
Sex : Male
Marital Status : Single
Religion : Moslem
Nationality : Indonesian

Personal Statement

"I believe this is an incredibly exciting and empowering subject that will allow me to make a difference to the world and change it in a positive way. I feel that I have always been an engineer at heart, as a youngster I was regularly taking mechanical things apart and trying to find out how they were built and worked. I was constantly looking to satisfy my curiosity of the physical world around me.

To me engineers have helped to shape the world that we live in and for centuries have been instrumental in building structures that have served communities. Their work goes on around us every day and continues to make a huge difference to the quality of people’s lives and the environment. In my opinion being a successful engineer is all about using imagination, creativity and tenacity to tackle unique  problems. These are qualities that I believe I posses along with the required discipline, enthusiasm and the willpower not to give up".

Work History

Sep 2014Present

MEP Engineer

  • Advise the Project Manager of any technical aspects of the mechanical services that may   affect construction progress, e.g. quality or snagging
  • Continually review the contractor’s construction schedule during the progress of site works with regards to MEP services and report to the Project Manager on the same
  • Manage the day to day work of the MEP team
  • Witness on-site piped system pressure test, air conditioning duct leakage testing and other testing that may be required during the first fix works and advise the Project Director accordingly
  • Monitor quality of the Contractor’s construction installations
  • Take part in risk workshops and report any risks associated with MEP installations or general project to the Project Manager
  • Review Contractor’s installation method statements
  • Review and comment on Contractor’s testing and commissioning results and advise the Project Manager accordingly
Sep 2012Sep 2014

Building Maintenance Engineer

  • working with detailed diagrams, plans and drawings
  • managing and forecasting spend, using whole life cycle costing techniques, ensuring that work is kept to budget
  • designing site-specific equipment as required
  • overseeing and supervising the installation of building systems and specifying maintenance and operating procedures
  • monitoring building systems and processes
  • making decisions about expired systems equipment and the appropriate location of new equipment
  • attending a range of project group and technical meetings
  • ensuring that the design and maintenance of building systems meets legislative and health and safety requirements
  • advising clients on energy use and conservation, aiming to minimise the environmental impact and reduce the carbon footprint



Job Training

Study case in the company to made scientific work with title "The influence of immersion time for chrome thickness in the glasses frame"



Repair and maintenance motorcycle engine at Engine Tune Up Event presented by Mechanical Engineering Students Association Diponegoro University


Mercubuana University


Magister Management

Diponegoro University


Bachelor degree of Mechanical Engineering

SMAN 5 Semarang


SMPN 14 Semarang


SDN Gemah 01-02 Semarang



Management of Material Resources

Obtaining and seeing to the appropriate use of equipment, facilities, and materials needed to do certain work.

Management of Financial Resources

Determining how money will be spent to get the work done, and accounting for these expenditures.

Operation Monitoring

Watching gauges, dials, or other indicators to make sure a machine is working properly.

Quality Control Analysis

Conducting tests and inspections of products, services, or processes to evaluate quality or performance.

Management of Personnel Resources

Motivating, developing, and directing people as they work, identifying the best people for the job.

Learning Strategies

Selecting and using training/instructional methods and procedures appropriate for the situation when learning or teaching new things.

Systems Evaluation

Identifying measures or indicators of system performance and the actions needed to improve or correct performance, relative to the goals of the system.

Systems Analysis

Determining how a system should work and how changes in conditions, operations, and the environment will affect outcomes.


Teaching others how to do something.


Bringing others together and trying to reconcile differences

Active Learning

Understanding the implications of new information for both current and future problem-solving and decision-making.

Social Perceptiveness

Being aware of others' reactions and understanding why they react as they do.


Monitoring/Assessing performance of yourself, other individuals, or organizations to make improvements or take corrective action.


Communicating effectively in writing as appropriate for the needs of the audience.

Time Management

Managing one's own time and the time of others.

Judgment and Decision Making

Considering the relative costs and benefits of potential actions to choose the most appropriate one.

Complex Problem Solving

Identifying complex problems and reviewing related information to develop and evaluate options and implement solutions.


Adjusting actions in relation to others' actions.


Talking to others to convey information effectively.

Active Listening

Giving full attention to what other people are saying, taking time to understand the points being made, asking questions as appropriate, and not interrupting at inappropriate times.

Critical Thinking

Using logic and reasoning to identify the strengths and weaknesses of alternative solutions, conclusions or approaches to problems.

Reading Comprehension

Understanding written sentences and paragraphs in work related documents.

Adobe Photoshop
English Language

Fluently written & oral

Autopipe Bentley
Autocad 2D/3D
Microsoft Office


S-ONE Plus

Oct 2011Oct 2011

The course of fundamental of pipe stress analysis with CAESAR II version 5.0 and Autopipe Bentley XM V9


Feb 2011Apr 2011

English Conversation

Diponegoro University

Dec 2009Dec 2009

Technology Innovation For Future Application

Implementation activities of ROBOTIC AND TECHNOLOGY FAIR