Charle Kongolo

Charle Kongolo

Education

Open University 2009-Present.

Renewable Engineering ( Pathway to MEng Degree)

Waltham Forest College 2008 –2009

Completed the 17th Edition of the Electrical Regulation.

Tubeline Health and Safety course. 07.2008

Lewisham College 2006-2007

City & Guild 2330 part 1 & 2

Level 2 and 3 Electrical installation.

Performing Engineering Operation NVQ Level 2

Lewisham College and Redbridge College 2005-2006

A Level French, Math, Science and NVQ Level 2 ITC

St. Raphael School 1999-2004 –

Studied(GCSE equivalent): Math, Science, English, IT, Elektrotechnic, Business Studies, Religious Studies, French, PE, History and Dutch.( All Passes)

Work History

Work History
Apr 2013 - Present

Director

Elie Electrical Services
  • Domestic Part or Full electrical re-wiring 
  • Electrical fault finding in Emergency and non emergency
  • Installing new electrical sockets and lighting points
  • Replacing blown fuses and circuit breakers
  • Installing security lighting 
  • Outdoor electrical installation( Garden lighting, External Socket, Power to shed and garages)
  • Intruder Alarm Installation and Maintenance( Wired and Wireless System)
  • Wiring tests and recommendations
  • CCTV Installation and Maintenance( Wired and Wireless System)
  • Emergency lighting, smoke and fire alarm systems 
Jul 2009 - Present

Electrical Engineer

Celect Services Ltd.

Some of Project  to name just few:

  • Olympic Village/athletic village( Temporary welfare Facilities and Temporary offices throughout the Village and park)
  • Mace Group LTD (we provide and maintain temporary welfare facilities and offices throughout the country)
  • Tate Britain( Temporary welfare Facilities and Temporary offices)
  • Gatwick Airport (Temporary welfare Facilities and Temporary offices)
  • Southfield Community College (Temporary Class Rooms, Temporary welfare Facilities and Temporary offices)
  • Bloomberg Place (Temporary welfare Facilities and Temporary offices)
  • Middlesex University( Complete class rooms and offices)
  • BSKYB SKY9 (complete Studio and office installation)

Duties:

  • Full electrical wiring 1st fix and 2nd fix
  • Video and Sound System Installation
  • Solar Thermal and Photovoltaic 
  • Internal lighting Installations
  • UPS System
  • External lighting Installations
  • Data and IT installations
  • CCTV and Security Systems
  • Fire detection and alarms
  • Access Control Systems
Apr 2010 - Mar 2011

Electrician

Techelec Ltd, Pullinger & Barrett Ltd and Elie Enterprise Ltd

Some of Project :

  1. Barclay's Bank( Refurbishment of Branches)
  2. Abbey National (Refurbishment of Branches and Re-branding)
  3. Tower Hamlet Council( Council flat upgrade program)
  4. Stratford Westfield 

Duties:

  • Full electrical wiring 1st fix and 2nd fix
  • Video and Sound System Installation
  • Internal lighting Installations
  • External lighting Installations
  • Intelligent Building Systems
  • Data and IT installations
  • CCTV and Security Systems
  • PA & Voice Alarm installations
  • Fire detection and alarms
  • Building Management Systems
  • Access Controls Systems
  • UPS Installations
  • DDA installations
  • Mains and Sub Mains Distribution
Dec 2009 - Mar 2010

Electrician

STOTHERS M&E Ltd

Self employed on a temporary basis involved in a large Hotel Refurbishment and extension in West London.

Duties

  • Internal lighting Installation
  • External lighting Installation
  • Data and IT installations
  • CCTV and Security Systems
  • PA & Voice Alarm installations
  • Fire detection and alarms
  • Access Controls Systems
Sep 2009 - Dec 2009

Electrician

Unidata LTD

Duties: Self employed on a temporary basis involved in a large commercial Office block refurbishment and new build.

Complete new electrical installation of Power, lighting and heating installations, Underfloor Heating. Cat 5/6 Data & Communications, TV & Audio, Fire alarm and Security.  Module controlled Lighting system.

Apr 2009 - Sep 2009

Electrician

LakeHouse

Self employed on a temporary basis involved in a large project In Camden Town to refurbish and upgrade council Flat. and completing Domestic Electrical Installation on occupied accommodation and Kitchen Re-wiring.

Fault finding, trouble shooting, repairs and small installations on various low voltage systems. Also remedial repairs and completion of minor works certificates.

Jul 2008 - Apr 2009

Field Engineer

Easydentic UK

Employed on a temporary basis to install Maintenance of Biometric Entry System( Finger Print Access control system), Wireless CCTV system In nurseries across the Country .

May 2006 - Jan 2008

Electrician Mates

CDI Electrical Services Ltd

During my time with CDI ELECTRICAL SERVICES LTD.  My duty was more involved in domestic and industrial installation.

  • Full electrical wiring 1st fix and 2nd fix in Domestic properties.
  • Three Phase installation in industrial estate
  • Three Phase motor installation
  • single and Three Phase Electric Meter 
Aug 2003 - Dec 2005

Electrician Apprentice

Mega Elktra Groep BV

As an Electrician Apprentice I worked on some prestigious Theatre, Film Studio, TV Program and many more to name few:

  1. Redevelopment of ENDEMOL STUDIO in Amsterdam
  2. TheatRE Factory in Amsterdam
  3. DE FOYER BOS&LOMMER in Amsterdam
  4. FORTIS CIRCUS THEATRE in Scheveningen

During my apprenticeship I was Involved in the following duties:

  • Full electrical wiring 1st fix and 2nd fix
  • Installing new electrical sockets and lighting points In Offices and Theatre
  • Replacing light in Theatre and TV Studio
  • Installing security lighting for Fire exit 
  • Temporary Lighting Installation for Studios 
  • Intruder Alarm Installation in all the 4 big projects
  • Wiring tests and recommendations
  • CCTV Installation 
  • Special LED light in Studio and Theatre
  • Video and Sound System
  • Data and Telephone Cable Installation