Download PDF

Work experience

Oct 2009Present

Project Manager

Sherrick Construction, Inc.

Education

Sep 2004Dec 2008

Bachelors

Auburn University

Skills

Skills
    Operating Systems and Software knowledge includes: Microsoft Windows, All Microsoft Office Applications, Adobe Acrobat 9 Pro, Adobe Photoshop CS5 & Elements 8.0, Adobe Premiere, Autodesk AutoCAD, Revit Architecture for Building Information Modeling (BIM), Constructware, On Center On-Screen Takeoff, Primavera SureTrak, Primavera Contract Manager, Procore Project Management Software, MC2 Interactive Cost Estimating (ICE), MC2 Earthworks, Google SketchUp, Timberline Estimating.  

References

Kevin Moyes

I worked with Flintco on several partnership projects for the government. Kevin is the president of the Memphis, TN division.

Jon Griese

I worked with Jon Griese on several federal projects. He was the Senior Project Manager of the projects and I was the Quality Control Manager.

Paul Sherrick

Paul Sherrick is the owner of Sherrick Construction, Inc. based in Nashville, TN.

Summary

Project Experience

Sherrick Construction, Inc., Navy Inn Lobby, NSA Midsouth, Millington, TN

 Project Manager - April 2012 - May 2013

Worked as an operation manager overseeing project management and superintendent employees to  provide guidance with federal job management. My duty was to train personnel with proper USACE Quality Control/Safety and job documentation for a lobby addition to the Navy Inn (hotel). My experience with this customer has been throughout the course of three years and five projects. Through past working experience, Sherrick was selected to complete this addition by Great American Insurance Company after the previous contractor defaulted. This project includes detailed millwork and lighting at the reception check –in area as well as a dining area, food prep, administrative offices, restrooms, and a new three stop elevator.

Sherrick Construction, Inc., New Splash Pad, NSA Midsouth, Millington, TN

Project Manager - April 2012 - May 2013

Worked as the leading manager of the design team for this design-build splash pad project. Completed the new splash pad at NSA Midsouth in just four months (design & construction). The quick paced design build project features a two tone circular pad with Rain Drop® spraying features. The new park also includes a mechanical pump room/restroom, shaded patio area, and pedestrian access walks. This was a new design concept for MWR (Morale Welfare & Recreation) and anticipated to be used on other installations across the country.

Sherrick Construction, Inc., Toledo Solar Array, National Guard Readiness Center, Toledo, OH

Project Manager - September 2011 - May 2013

Worked as the leading manager of the design team for this design-build project. This project includes a maximum peak electrical production Canopy, Photovoltaic (PV) array electrical power production plant, replacing the existing roof system with a membrane EPDM (white) roof and installing a Photovoltaic Solar Roofing System using solar laminate technology and battery storage backup for canopy lighting. As part of this project, we provided the government with an investigative research study to monitor energy savings. The new parking canopies and the new flex solar on the roof generate 260kw of solar power. This design-build project brought unique challenges with the interconnection agreement and the amount of new power that will be generated.

Sherrick Construction, Inc., Phase IV Wind Turbine, 200th Red Horse Squadron, Camp Perry, OH

Project Manager - September 2011 - May 2013

Worked as part of a design-build team responsible for designing and constructing a 600kW wind turbine. Project Management duties included an extensive investigative/research study and Environmental Assessment as well as a complete design for the site, foundation, structural, and electrical components of the turbine. Responsible for determining, designing and constructing the system per the interconnection requirements of Ohio Edison. Project goals are to expand upon currently planned renewable energy sources to provide electric power for existing facilities, reduce harmful emissions, reduce the quantity of electric consumption obtained from fossil fuel public utility sources and the base expenditures on electricity, collecting data on the operating turbine, demonstration of Wind Production on Ohio Military Bases.

Sherrick Construction, Inc., Child Development Center, NSA Midsouth, Millington, TN

Quality Control Manager - November 2009 - December 2011

Worked as part of a design-build team consisting of archimania (Memphis, TN) and SSR Ellers (Nashville, TN) to design and construct a new 20,000 sf child development center to obtain LEED Silver, renovate office spaces for NCIS, as well as renovate an existing building for a new Navy band practice facility (LEED Silver). Also included in this contract was an asbestos abatement and demolition of an existing 40,000 sf building on the base.

Quality Control duties included: establishing, administering, and maintaining a quality control program in respect to the design phase as well as the construction phase of the project, using Quality Control (Design and Construction) Plans, Commissioning Plans and Reports, meetings, a Coordination and Mutual Understanding Meeting, three phases of control (preparatory, initial, follow-up) for each definable feature of work, submittal review and approval, testing, completion inspections, and QC certifications and documentation necessary to provide design, materials, equipment, workmanship, fabrication, construction and operations which comply with the requirements of the contract.

Project management duties included: document control/management of all drawings, specifications, RFIs, submittals, material safety and data sheets, TNEPSC inspections, subcontractor documents, and required LEED documents, safety training and orientation for all new trades on site, building & tracking a four phase cost-loaded schedule (Pimavera) used for time management as well as monthly billings to our client based on percent complete, buyout of subcontractors/budget tracking, contract management (contracts, purchase orders, change orders...ect.) using Procore, base access/security (badge issue/escorting), environmental management (solid waste management, construction activity pollution prevention, ect.), estimating tasks using Oncenter Onscreen Take-Off in conjunction with MC2 Interactive Cost Estimating (ICE), design coordination meetings with all parties involved to develop a pleasing building for our client that met all requirements from the Navy RFP and all related Unified Facilities Criteria (UFC).

Brasfield and Gorrie, Newell Rubbermaid Global Headquarters, Atlanta, GA

Intern - May 2008 - August 2008

Worked with the Project Manager responsible for the interior build-out of 11 floors of a 14 floor base building.

Duties included: tracking the overall project schedule, monthly billings to the owner, addressing owner/architect concerns in weekly meetings and managing subcontractors responsible, walking/corresponding with architect to carry out punch-list items.

Brasfield and Gorrie, NEGA Medical Center North Patient Tower, Gainesville, GA

Intern - May 2007 - August 2007

Worked with the Project Manager responsible for managing all aspects of the structure as well as two interior patient room mock-ups on a $270M patient tower expansion.

Duties included checking/revising formwork shop drawings as well as rebar and miscellaneous structural steel shop drawings, developing a log to keep up with projected vs. actual committed equipment rentals in order to make accurate monthly projections, updating plans/specs as well as RFI postings/log, tracking a log for concrete breaks after pours, working with Superintendent to develop a plan to tie-in to an operating room with all regards to safety/infection control.

Brasfield and Gorrie, St. Joseph's North Parking Deck, Atlanta, GA

Intern - May 2006 - August 2006

Provided layout and control of a multi-story precast concrete parking deck.

Duties included marking piles for drilling, laying out footings for foundation, shooting grades, layout of templates rebar/anchor bolts, building form work, estimating concrete quantities for pours, marking control joints, and leading a crew safety meeting every week.

Certifications

  • 30 Hour OSHA Card
  • TN Erosion Prevention and Sediment Control (TNEPSC) Level 1 Certified
  • US Army Corp of Engineers Construction Quality Management Certified
  • CPR Certified
  • 2012 LEED AP BD+C

Awards

  • LEED Silver Certifications for 2 Buildings
  • National Society of Collegiate Scholars, 2005-2008
  • Keith Petijean Scholarship (Department of Building Science), 2006
  • Alabama Homebuilders Foundation Scholarship, 2006, 2007
  • Auburn University Board of Trustees Scholarship, 2004-2008