Kamran Ali

  • House # 41, buland shah road kohat cantt Kpk
Kamran Ali

Sr.Process Engineer CV


  • Comprehensive knowledge of the processes and materials used in handling tasks in Cement Industry
  • In-depth knowledge of raw geologic materials and its chemical compositions as well as cement automation systems
  • Well versed in modern and large scale high capacity cement grinding production
  • Extensive knowledge of cement process, emissions controls, and in plant design
  • Skilled in using sensors and instruments that are used in manufacturing firm
  • Sound knowledge of blending, crushing, and kiln processing of geological elements
  • Well versed in cement manufacturing technologies like vertical roller mill, pre-calciner and pre heater

Work History

Work History
Dec 2008 - Mar 2015

Sr. Process Engineeritor

Hayel Saeed Anam Group of Companies (National Cement Company YEMEN)
  • Perform responsibilities of generating standard processes and procedures of control plans processing
  • Responsible for providing technical guidelines in the burning of hazardous fuels to technical staff
  • Responsible for monitoring and supervising process control parameters to ensure high capacity usage and update the reports to the Team Manager
  • Responsible for following the safety regulations while performing tasks on the plant grounds
  • Arrangements for pre planned shutdown.
  • Providing punch list to the services departments.
  • Minimize breakdown stoppage keeping in view maximizing run factor.
  • Production in charge during off hours.
  • Maintaining clinker and cement quality and coordinating with QC department.
  • Follow target parameters set by Manager production.
  • Keep in contact with Manager Production time to time during off hours
Mar 2008 - Dec 2008

Commissioning Engineer

National Cement Company
  • Act as commissioning in charge for the KHD Pyro-Process.
  • Responsible for the commissioning of KHD 3500 TPD Kiln, Preheater and silo extraction.
  • Responsible for the commissioning of IKN cooler, Elex ESP.
  • Commissioning of overall Kiln area including controlled dumpers, valves and feeders.
  • Suggesting suitable modification with KHD site manager Mr. Fisher.
  • Co ordination with services departments to facilitate commissioning work.
  • Responsible for the safety of equipment during the test run.
  • Assigning duties to the supervisors.
  • Fulfilling the HSE requirements before going to execute the job.
Nov 2005 - Mar 2008

Assistant Manager-Production

Lucky Cement Limited (LCL)
  • Work as commissioning engineer before plant operation.Responsible for operation/monitoring of the plant and safety of the equipments throughout the shift.
  • Monitoring the activities and performance of all shift staff.
  • Managing the quality control, electrical and mechanical department.
  • Act as production in- charge during the off hours.
  • Follow the targeted parameters set by DGM (Production).
  • Listing down problems faced and suggest possible solutions.
  • Co ordination with service department during maintenance jobs.
  • Optimizing the plant for maximum production at minimum cost.
  • Assigning duties to shift workers.
  • Implement new procedures as directed from higher management.
  • Managing activities during plant shut down including material supply ,
  • Kiln lining and other plant refractory.
  • Executing suitable modification by service departments.
  • Commissioning and Performance Guarantee Test of Line C&D.
  • Performed commissioning work of both lines C&D each 3300 ton/day
  • Discharge my duties, skills and responsibilities for successful performance guarantee test.
  • Performed trouble shootings and suggested suitable modification during commissioning.
Feb 2005 - Nov 2005

Shift Engineer-Production

Lucky Cement Limited(LCL)
  • Performed shift duties in Raw Mill and Kiln areas.
  • ]\Maintained shift reports at the end of shift.
  • Maintained problem list and suggested possible solutions.
  • Kept in touch and coordinated with services departments.
  •  Performed trouble shootings to minimize the stoppage
Jan 2004 - Feb 2005


DESCON Engineering Abu Dhabi UAE
  • Worked as “HSE” (ADCO BAB field production facilities expansion project).
  • Promote health safety and environment activities.
  • Assembly and installation of heavy equipment in the expansion of degassing plant
  • Commissioning of controlled valves, pumps and compressors.
  • Direct management of live lines tie-ins and commissioning work.
  • Fulfillment the requirements and conducting activities safely in confined spaces.
  • Direct management of demolishing large oil tanks and other process equipments.
  • Conducting fire fighting training courses.


Feb 1999 - Jun 2003

Bachelor of Chemical Engineering (B.Sc.)

NWFP UET Peshawar, Pakistan
Sep 1995 - Oct 1997

F.Sc, Pre Engineering

Edwardes College Peshawar, Pakistan

Pakistan Refinery (Ltd.)

  • BSc. Final year project completed in Pakistan Refinery
  • Hydro-Treating Plant, Hydrodesulferization of Kerosene Oil.


May 2008 - Aug 2008

star-Up and performance Test


participated in start-up and two performance guarantee test for the new 4200 t/d clinker production supplied by KHD humbold wedag.

May 2006 - Aug 2006

commissioning and guarantee test

  • Worked with Chinese during erection, installation of equipments
  • performed commissioning and guarantee test
May 2005 - Jul 2005

Qualitas Training Division,

BAK Consultants
  • Internal Auditing ISO 9001; 2000                      
  •   Understanding ISO 9001; 2000

Awards/ Achievements

  • Position Holder NWFP UET Peshawar.
  • Awarded A+ Grade S.S.C.E and FSc.
  • Certified by Chinese for best performance during commissioning and guarantee test.
  • Qualitas Training Division ISO 9001; 2000 training.
  • Certified by KHD commissioning engineer for best performance in commissioning and performance guarantee test (3400TPD).
  • KHD certification on full capacity production (4200TPD)
  • Consider as a commissioning task force leader by Holtec consultants



Computer Skills

Microsoft office, Auto Cad, Windows, Dos.