Jugal Makwana

BIM Director - asia pacific


I'm a Civil Engineering graduate with 10 years of experience in Infrastructure with 6 years of experience in Infrastructure design softwares.

Work History

Work History
Apr 2015 - Present


Director- at AECOM (6 months)
Mar 2014 - Mar 2015

Manager, Building Information Modeling

Manager, Building Information Modeling-Transporation at (1 year 7 months) As BIM Manager in the Transportation sector of AECOM Singapore responsible for coordination of BIM use on project, determine schedule of use, sharing activities, quality control, modelling responsibilities and document in BIM Execution Plan. Global Product Manager-Road, Rail and Transit at Bentley Systems
Mar 2002 - Aug 2003

Sr Application Engineer

Bentley Systems
Sr Application Engineer at (1 year 6 months) Page2 Responsible for Presales, Training, Support and localization of MX products for India MXQRoad-specialproduct customized for Ministry of Road Transport and Shipping to automate Rate Analysis and preparation of BOQ as per the IRC standards-preparation of product features and roadmap, product specifications, testing, product validation with Ministry of Road Transport and Highways, co-ordinatation with developer. Representing Infrasoft at key industry events like IRC.
Sep 1998 - Mar 2002

Senior Highway Engineer

L. R. Kadiyali & Associates
Senior Highway Engineer at, New Delhi, India. (3 years 7 months) Responsible for preliminary design, detail design, estimation of National Highway 2 lane to 4 laning upgrade Road projects in India. Key activities included-Geometric Design confirming to Indian standards using MXRoad-Design optimization to minimize profile correction course for upgrade projects using MXRenew Corridor Modeling-Interchange planning and design-Report preparation-plan/profile and cross section drawing production. Detailed quantity estimation and descriptive report preparation for each project-Design and analysis of Culverts and minor bridges-Economic Analysis and Life Cycle cost analysis for highway projects-Design briefings and presentations to clients/owners and feedback Projects worked on-24 km Delhi Gurgaon Expressway project 5(interchanges) 18 km-Belgaum Bypass-2 lane/4 lane widening project with service roads(Total-72 kms of roads) 80 km-National Highway in state of MP throughHilly terrain-2 lane/4 lane widening(Total-240 kms of roads) 53 km-Harihar Haveri-2 lane to 4 lane projects widening projects(Total-150km of roads) 80 km-Harihar Chitradurga Languages English Hindi Gujarati