Summary

Proactive Electrical Supervisor experienced in managing construction teams and maintenance Successful in creating effective communication between personnel, general contractors, and the management team. Efficient and effective completion of task on time and within budget.

Work History

Work History
Feb 2013 - Feb 2016

Electrical Supervisor

Farnek Services LLC

Operation, Maintenance and Trouble Shooting Experience on:

  • 11kv Switch Gear such as ABB Uni-Gear type ZS1 with Vaccum Circuit Breaker
  • 11kv sf6 gas insulated CompactSwitchgear,SafeRing ,RMU,SpliceSwitch,LIS and battery charger
  • ABB Dry type Transformer (Up to 2000 KVA),
  • Air Circuit Breaker up to 4000 amps and Bus Coupler in MDB
  • ASCO ATS (up to 1600 A)
  • 6 No’s SCADA based control Caterpillar Diesel Engine Generator (2750 KVA)
  • Maintenance of lightning arrestor
  • Maintenance of SMDB
  • Maintenance of ABB Harmonic Filter PQFS
  • Maintenance of ABB Capacitor bank
  • CEAG -CBS System maintenance and its Battery Bank testing
  • ABB ACH HVAC550 VFD Drive upto (230KW)
    • O.L starter, STAR-DELTA starter, SOFT starter
    • Maintenance of High Level Air Craft Warning Lights
    • Maintenance of FINAL DISTRIBUTION BOARD
    • Maintenance of MMU(metering unit)
    • Maintenance of Dimmer like DLE 1220GL-S,DDRC820FR rack
    • Maintenance of flood detection panels
    • Festival lights with Central server System
    • Domestic Pumps, Tank Control Scheme, common control panels
    • FM200 Fire Fighting System,Foam system and FACP control panels
    • Maintenance of large numbers of High level Strobe lights, Facade lights like FMA, FMB, FMC, spire lights like RGB, 3kw and 2kw xenon arc lamps and its control panels etc.

2010 - 2012

Front line Supervisor

Larsen & Toubro Limited

3 years’ experience in Erection and Cable Termination  in Larsen & Toubro Limited at kudankulam Nuclear Power Plant

  • Cable Termination of HT (unarmoured xlpe  cable upto 500sq.mm) in Panels
  • Cable Termination of LT cables (2.5 to 300sq.mm) in Panels
  • Cable Jointing of LT cables(upto 150sq.mm)
  • Motor kit termination at Motor terminal end
  • Repairing of LT cables with repairing kit
  • Glanding and Earthing in Jb’s ,valves, panels, Motors

Technical Features of Working Area :

 Asia’s First 2x1000MW Nuclear power project in India based on Russian  Design

  • 24KV transformer
  • 20KV switchgear
  • 6KV SF6switchgear
  • 38KV switchgear
  • 6KV Dry Type transformer
  • Air compressors
  • 220V ACDB
  • 110V/ 220V DCDB
  • 220V/110V Battery Bank
  • 3MV Diesel generator
  • Ventilation fans and valves
  • Fire fighting valves
  • Motors

Education

Education
Jun 2006 - Oct 2010

BE/EEE

PSN College of Engineering & Tech

Tirunelvelli

Certifications

Certifications
Oct 2015 - Mar 2020

17th Edition IET Wiring Regulations BS 7671:2008

British


Jan 2015 - Jan 2018

HV/LV Electrical Safety Awareness (Dubai Municipality Approved)

EUROLINK