Summary

Civil Engineer with bachelors degree in administration and 2 years apprenticeship with family business of civil contracting and five years experience in individually managing civil engineering buildings & infrastructure projects. Inheriting family civil contracting business laid additional responsibility of managing the commercial & legal aspect of the business company

Work History

Work History
Sep 2004 - Present

Proprietor & CEO

Supreme Engineers

Supreme Engineers (P) Ltd. 

Proprietor & Chief Executive.

Family business was established by my father in 1990. I apprenticed under him for 2 years. After his demise, six years ago, I have managed the technical as well as the commercial & business aspects by myself. The turnover in 2008-2009 was Cad $ 300000. The company takes diverse civil construction projects. A summary of the projects follows.

Installation of Aluminum Sheet Roofing for Railway Workshop.                                              2010

  • Cost: Cad $ 100000.
  • Contract Period: 5 Months.
  • Scope of Work: Installation of Aluminium roof & valley gutter over 5000 Sq. Meters at a height of 6.5 Meters.
  • Design: 0.71mm thick Aluminium Industrial troughed sheet, weighing 2.5kgs per sq.m fixed with Aluminium alloy 8mm hook bolts & 25mm x 6mm mild steel flats as wind ties.
  • Impact: Shelter provided for equipment worth CAD $6 million and 150 Railway workers working in the shed.

Structural Repairs to Pump House of Naval Dry dock.                                                               2009

  • Cost: Cad $ 65000.
  • Contract Period: 4 Months.
  • Scope of work: Structural Strengthening by Fiber wrapping technology and Fiber strips. La.ying Micro-concrete and conducting Non-destructive tests on concrete and steel.
  • Design: Non destructive Schmidt Rebound Hammer test. Carbonation depth test using phenolphthalein with ethanol spray. Ultrasonic test. Corrosion activity test
  • Impact: Repairs resulting in the increased efficiency of dry dock pump house.

 Major Repairs & Renovation Residential Apartments Railway Officers colony.                      2008-2009

  • Cost: Cad $ 200000.
  • Contract Period: 10 Months.
  • Scope of Work: Repairs and renovation of 10 Railway buildings G+3 with a total quantity of 9000 sq.m.
  • Design: Heavy Repairs with 250 bhp pressure compressor containing cement mortar of the ratio 1:3, 25mm thick plastering(1:3), painting and polymer treatment to the structural members.
  • Impact- Restored Structural Stability to 125 homes.

Provision of MS steel tile flooring and roofing replacement in Railway workshop.                  2007-2008

  • Cost: Cad $200000.
  • Contract Period: 10 months
  • Scope of work: 1400m2 of MS Steel tiles flooring and 6000m2 of roofing with AC sheets.
  • Design: MS Perforated Top & Anti-skid tiles of 250x250x25 mm(12Gauge H.R. Steel) having a base of M-20 concrete, roofing with AC sheets and replacement of 5mm thick wire glass.
  • Impact: Flooring able to withstand impacts of > 100 Kgs/cm2.

Major Repairs to Railway Work Shed.                                                                                        2006-2007

  • Cost: Cad $ 240000.
  • Contract Period: 12 Months.
  • Type of Work: 10000 sq.m of AC sheet roofing, 132MT of fabricating Steel Sections.
  • Design: Strengthening of steel structures conforming to IS 816 & IS 800.
  • Impact: Safety of Structural steel members.

Construction of a Railway Platform, Booking Office and development of circulating area.    2004-2005.

  • Cost: Cad $ 500000.
  • Contract Period: 24 Months.
  • Type of Work: Construction of 1600 sq.m of Booking office G+1, 200 MT M. Steel for Cover over platform and development/landscaping of circulating area.
  • Design: Angular Footing marking/survey, Mix design of M-30 concrete, 200MT Structural steel fabrication for Railway platform, 60mm thick M-50 concrete paver blocks covering 1500sq.m.
  • Cost: Cad $ 100000.

Education

Education
Apr 2009 - Jul 2009

AUTO-DESK

Skills

Skills

BUILDING REPAIRS AND MAINTENANCE

SPECIALIZED TRAINING IN CONCRETE BUILDINGS AND MAINTENANCE OF STRUCTURES

ENTERPRISE RESOURCE PLANNING SOFTWARES

WORKED ON TALLY ERP SYSTEMS FOR RESOURCE AND COST MANAGEMENT

AUTO-CADD

MS OFFICE & MS PROJECTS