Results-driven construction and project manager with 10 years of experience. History of concurrently directing multiple projects to successful completion through effective management and team collaboration. Continually strives to produce high quality projects while adhering to a tight schedule and budget. 

Education

Present - Obtaining Real Estate License

Proschool

Present - Obtaining General Contracting License

Prometric

2006 - Doctoral Medicine-Sciences

Institut Pasteur

Completed five years of medical education, one year is necessary to complete the practical experience to obtain the degree.

Linguistic Skills

Translation
  • English    
  • Arabic          
  • French
  • Italian
  • Amazigh

Work History

2012Present

Property Maintenance and Construction

Independent Contractor
  • Maintained the physical asset of the property under the direction of the Property Owner.
  • Overseen construction projects from conception to completion.
  • Developed scopes of work for small improvements/services.
  • Selected tools, materials and equipment and tracked inventory.
  • Met contractual conditions of performance.
  • Reviewed the work progress on daily basis.
  • Planned ahead to prevent problems and resolve any emerging ones.
  • Maintained and mitigated risks.
  • Ensured quality construction standards and the use of proper construction techniques.
20092012

Division Manager - Pipeline Installation and Contract Administration

OGEC Group OUAIS Group Engineering & Contracting
  • Assumed responsibility for the safety and financial performance of the EPC contract for the Gas Pipeline GK3 -- Lot 3 encompassing a 48-inch gas pipeline system from Mechtatine to Tamlouka in the northeast of Algeria, then connecting the latter to Skikda and El-Kala, located on the northeastern coast of the country, for a total length of approximately 350 kilometers. 
  • The overall GK3 project allowed Sonatrach to expand gas transport capacity to 9 billion cubic meters per year in order to provide the gas necessary to feed the future GALSI export gas line, which will connect Algeria to mainland Italy via Sardinia, as well as the new LNG train in Skikda and two power plants. 
  • Managed inventory of the pipe inventory.
  • Provided safety and hands-on leadership to teams to ensure productivity, efficient use of materials & equipment, and contractual performance of the project.
  • Provided initial client contact to assess scope of work and resources required to successfully complete the project.
  • Overseen supervision of total construction effort to ensure project is constructed in accordance with design, budget and schedule, which includes interfacing with client and AE representatives, other contractors, etc.
  • Overseen the estimate preparation for selected projects and review the contract specifications, drawings, takeoff information, and the like.
  • Supervised total construction effort to ensure project is delivered in accordance with design, budget and schedule.
  • Planned, coordinated and supervised onsite functions.
  • Ensured that proper leadership and supervision is provided to our craft employees and/or sub-contractors.
  • Provided technical assistance, i.e. interpretation of French and Arabic to English and Italian.
20062009

Division Manager - Pipeline Installation and Contract Administration

Stroytransgaz
  • Assumed responsibility for safety and financial performance of the GK-1 (Ouled Djellal-Skikda) Gas Pipeline. The project was implemented as part of the development of Algeria's gas transportation system.
  • The STG was responsible for the repair of eight sections of 145 km in total length and 40 inches in diameter, construction of new 5 km long section (in the industrial area of Skikda) including the aboveground installations and auxiliary systems (SCADA, telecommunications, cathodic protection, control and instrumentation).  Provided safety and hands-on leadership to teams to ensure productivity, efficient use of materials & equipment, and contractual performance of the project.
  • Provided initial client contact to assess scope of work and resources required to successfully complete the project.
  • Overseen supervision of total construction effort to ensure project is constructed in accordance with design, budget and schedule which includes interfacing with client and AE representatives, other contractors, etc.
  • Overseen the estimate preparation for selected projects and review the contract specifications, drawings, takeoff information, and the like.
  • Supervised total construction effort to ensure project is delivered in accordance with design, budget and schedule.
  • Planned, coordinated and supervised onsite functions.
  • Ensured that proper leadership and supervision is provided to our craft employees and/or sub-contractors.
  • Provided technical assistance, i.e. interpretation of French and Arabic to English and Italian.