A Six Sigma Black Belt Certified, Communications Engineer with more then four years of Rollout and O&M experience of Nokia as well as Siemens BSS & RAN Networks with specialty in remote troubleshooting using NetAct & Element Manager, Swapping, Rerouting and Rehoming of Live Sites.

Work History

Work History
Mar 2009 - Present

TI/FLM Engineer

Future Communications Guidance International

Zain NSN Project – Makkah, Kingdom of Saudi Arabia

• First Line Maintenance of Zain BSS and RAN Network in Makkah Region • Troubleshooting of 3G Sites remotely from RNC using Network Element, Object Browser, Fault Management, RNW Measurement Presentation etc. • Rectification at On air sites in coordination with Optimization Department for improving KPIs • Troubleshooting of 2G Site remotely from BSC using MML Session and NetAct • Commissioning and Integration of Nokia 2G Flexi EDGE and 3G WCDMA BTS • Troubleshooting Transmissions Problems of both 2G and 3G • Software Upgrade of Flexi WCDMA to WN5.0 and Resolving concerned issues • Installation and Commissioning of Flexi Hybrid, Flexi XC and Flexi Hopper • Implementation of Q1 for smooth Alarm monitoring and Remote Access • Coordinating with NOC for trouble tickets • Preventive Maintenance of On Air Sites • Replacement of faulty modules and fans • Rectification of Antenna line issues • Rerouting of live sites

Mar 2007 - Dec 2008

Telecom Implementation Engineer


Major Responsibilities: • Commissioning and Integrating Nokia UltraSite, MetroSite & Flexi BTS • Swapping Nokia BTS with Siemens 240XL II at VSAT Sites • Installation and Commissioning of Siemens 240XL II BTS • Installation and Commissioning of Siemens PDH SRAL XD • DCN implementation for SDH and PDH Radios • Using Hyperterminal & Tang to connect to Nokia BSC for various Tasks • Using Nokia NetAct for Remote Access for multiple Tasks • Coordinating with Subcons for Telecom Implementation • Installation and Configuration of Cisco 2600 & 7200 Series Routers • Flexihopper RRI swapping for increasing capacity • EDGE planning & implementation at on-air sites • Maintaining Sites’ Status & Documents at EPM/NOLS • Installation & Commissioning of Nokia FHXC • Carry out Expansions at On-air Sites • MW Link Shifting from RRI to FIU19 • Performing Acceptance with Customer • Rehoming of sites to new BSCs • Q1 Implementation • Rerouting of Sites

Aug 2006 - Feb 2007

Assistant Project Manager

Communicator’s Globe (Pvt.) Ltd
Responsibilities: • Leading the team of Field Engineers to support Rollout of technical projects • Coordinating with Customers for variety of projects • Developing and maintaining appropriate procedures, processes and tools necessary to implementation of projects successfully • Forecast costs, equipments and resources need for different projects • Plan and control survey, installation, testing, commissioning, acceptance, material and equipment logistics • Supervise and control subcontractors to comply with relevant conditions of the contract
Nov 2005 - Jul 2006

Telecom Implementation Engineer

Comsys Communication Services
Project: Nokia Telenor Pakistan Managerial Responsibilities: • Leading the team of Field Engineers to support Network roll out. • Assistance in Project Management and execution to deliver the BTS Sites in the given time frame, within budget and as per required quality standards. • Maintaining records, analyses and reports information in order to ensure that records meet both internal and external reporting requirements. Technical Responsibilities: • Outdoor/Shelter UltraSite BTS Installation and Commissioning • PowerCom Rectifier Installation and Commissioning • Sweep Test using Site Master Anritsu S331A/B and BIRD • MW Commissioning and Alignment • Power Measurement using BIRD 43 • Frequency Counting using Agilent 53131A • Alarm Testing and Simulation • Documentation • Integration • Site Acceptance • Expansion of existing sites • On site Troubleshooting & Fault Analysis
May 2005 - Oct 2005

Design Engineer

DANCOM Pakistan (Pvt.) Ltd
Projects and Responsibilities: • GPS-GPRS based Vehicle Tracking System (Final Year Project) • Up gradation of GSM Pay Phone for SMS and GPRS services • Digitizing Analog Energy Meter for WAPDA • On site Troubleshooting & Fault Analysis


2001 - 2005

BSEC (Bachelor of Sciences in Electronics and Communications)

The University of Lahore