Download PDF

Ezz Gabr

Drilling Fluids Engineer

Summary

Oil and Gas

Drilling Fluids Engineering

Project Management

Process Design

Production Engineering

Production Planning

Work History

Feb 2015Present

Drilling Fluids Engineer

EMEC

My primary role within this position is to be responsible for the maintenance and up keep of drilling fluids from spud to completion by the provision of site service to customers of EMEC. Key aspects of this position are:

  • Ability to utilize knowledge of company products and services in conjunction with experience in drilling fluid technology to optimize service quality
  • Based on interpreted results of routine and specialized testing, provide technical guidance of EMEC's customized engineered fluids to maximize wellbore value
  • Comply with health, safety and environmental regulations in all aspects of job performance
  • Ensure that an adequate inventory of both palletized and bulk products are available at the rig site, based on the fluid program and anticipated conditions
  • Tracks material usage and maintain records of the same for inventory and billing purposes
  • Maintain good working relationship with operator's representative and rig personnel.
  • Demonstrate leadership, including an active role in mentoring of trainee drilling fluids engineers 
  • I have had continued exposure to various items of Solids Control Equipment such as shale shakers, de-silters and centrifuges
  • Field Exposure
    • Vertical, Deviated, Exploratory & Development Wells
    • Water Based Mud, Oil Based Mud & Completion Fluids


Jul 2010Oct 2014

Process Engineer

Royal for Ceramic and Porcelain Industries
  • Team Leader to a group of engineers and technicians to operate and maintain two production lines, of capacity 16,000 square meters/day, including Digital Printing machinery “INKJET”, glazing bills, loading-unloading machinery, Colour Dosing machine , WATER-JET cutting machine.
  • Develop plans for reactive maintenance, preventive maintenance, and predictive maintenance programs for production lines machinery.
  • Monitor and control the entire production process, and the final product, using SAP “System Analysis and Program Development”;
Jun 2006Jul 2006

Process Engineer

Egyptian Natural Gas Holding Company

Summer training

Jul 2007Aug 2007

Field Engineer

South Dabaa for Petroleum

Summer training

Education

Sep 2010May 2012

Project Management Professional Program (PRMG)

American University in Cairo
  • six professional courses “45 credit hours each”:
    • Project Planning and Control Techniques
    • Management of Project Resources
    • Certified Cost Engineer
    • Introduction to Project Management International Standards
    • Project Budgeting & Financial Control
    • PRIMAVERA Project Management.
20032008

Bsc of Chemical Engineering

El Shorouk Academy


Sep 1990Jun 2003

General Secondary Certificate

Mansoura Experimental Language School


Skills

8
Languages
  • Arabic “mother tongue”;
  • English “excellent command written and spoken”.
8
Computer
  • Windows, Linux, Mac
  • Microsoft Office Suite
  • Competent use of Internet.
  • Primavera 6
  • HYSIS
  • SAP “System Analysis and Program Development” End user,

Certifications

Nov 2015Nov 2015

HAZCOM

Gulf Technical and Safety Training Centre


May 2015May 2015

H2S Awareness Training

RAWABI United Safety Services Company


Feb 2015Feb 2015

Basic Mud School

Egyptian Mud Engineering Company (EMEC)


Mar 2014Mar 2014

Basic Mud School

PETROKASS for oil and gas services


Feb 2013May 2013

Drilling and Work-Over Safety Techniques

American University in Cairo


References

References on request