Objective

To obtain a challenging in a dynamic telecommunication company that seeks an ambitious, social and career conscious person,where acquired skills and education are utilized towards continued growth and advancement.

Education

Oct 2005Nov 2009

Electrical Engineering(Communication)BS(EE)

NWFP University of Engineering & Technology Peshawar

Work History

Dec 2012Present

RF ENGINEER

SAUDI TURKEY INFORMATION TECHNOLOGY  MOBICOM


Field Experience:.

Working as  a RF Engineer in Turkey  on LTE CA Ericsson project  TurkCell

(Feb 2016 Till Date)

Performed SSD (Site shake Down)  on Three LTE carriers   

Mobility and Tests on each carrier includes  DL UL Ping IRAT CSFB 

Cluster drives with scanner which scans 7 frequencies TurkCell Avea and Vodafone in Istanbul clusters drives .

Also working on SwissQual Tool Diversity Optimizer For Avea Ericsson Project  3G

Includes cluster drives with Data Card   Scanner and  Three smart phones which   call on PSTN numbers and we are getting POLQA and PESQ values.



Worked  as DTE  LTE  Carrier aggregation  Alcatel Lucent Deployment Mobily  Project  East
(Sep 2015  to Jan 2016)

 Key responsibilities include

Performed single site verification i.e  static and mobility 

  • SSV include IFHO ,IRAT,Cell re selection ping test,
  • Session recovery , RRC (Attached/detected)
  • DL/UL on three points Near Mid Edge.
  • Mobility Test include DL/UL/Idle coverage in 500 m  range.


Worked as Team Lead in Alcatel Lucent MNS STC project North 

 

Tool TEMS Discovery 

  •  Good capabilities of log file analysis and making report.
  •  Analysis of RSRP, RSRQ, SINR
  •  2G Complete site  reporting .
  •  3G Complete site  reporting
  •  4G Complete site  reporting
  • Identified causes of poor coverage, and made recommendations about the orientation changes, electrical and mechanical tilts.
  • Logs analyzing drop calls, blocked call, access failure, handover, HSDPA throughput (Layer 3 messages Analyze the TRx Swap and Sector Swap TRx test, analyze the TRx level, TRx Quality, low power, as per  Planning).

    

Worked as 2G 3G 4G DTE  in Alcatel Lucent MNS STC Project North

(  JAN 2014 to AUG 2015)

  • Tools: TEMS, ACTIX, Map Info Professional,TEMS  Discovery 
  •  Comparison between SINR and Download throughput
  •  Comparison between SINR and Upload throughput
  •  FTP Upload and Download Test.
  •  Ping and Static point tests
  •  To check coverage and handover between cells using Tems with FTP.
  •  Spectrum Analysis test during drive.
  •  2G Complete site plus reporting in Actix / Map Info Professional.
  •  3G Complete site plus reporting in Actix / Map Info Professional
  •  4G Complete site plus reporting in Map Info Professional
  •  Test for RSRP,DL EARFCN, Band
  • Connection status test, ip address test, bandwidth test after connection.
  •  Analyze DL frequency, PLMN, Cell id.
  • Checking RSRP, RSRQ, SINR.
  •  Analyze connection time on site, drop connection 
  • •Analyze Tx/Rx rate 
  • Analyze throughput from 3 different methods 
  • Speed test analyzing and throughput attend by the site on each sector.
  •  Intra handover and inter hand over.
  •  Check the delay in connection, connection drop and rang of connection. 
  • Site troubleshooting with TI Partners.
  • Supervised riggers at the Site Audits. This involved in the pictures of the Site, pictures of the antennas etc.
  • Checking orientation and adjustment as well as checking and adjustment of mechanical and electrical tilts. 
  • Also supervised to the changes while sector orientation.
  • Analyzing log file, drop connection, access denied, low power, swap test 
  • To collect and analyze subscriber complaint, locating the network problem and solve the problem.
  • Ping test for HTTP and FTP.
  • Identified causes of poor coverage, and made recommendations about the orientation changes, electrical and mechanical tilts.
  • Perform data service test according to the project requirements.
  • Making all reports of work and deliver it to the coordinator.



  • Logs analyzing drop calls, blocked call, access failure, handover, HSDPA throughput (Layer 3 messages Analyze the TRx Swap and Sector Swap TRx test, analyze the TRx level, TRx Quality, low power, as per  Planning).
  • Missing neighbor analysis using the drive test tool, scanner and layer 3 Radio Resource Control protocol  analysis. TRx performance test, with MOC & MTC and Handovers Inter & Intra,  Data & HSDPA test and analyze the uplink and downlink Speed as per planning.  Site test over shooting, interference, DCR (drop call ratio) troubleshooting.  Data analyze with Mapinfo and prepare the report for the optimization.  Zone drive GSM & UMTS and troubleshoot the over shooting and analyze the call drop and handover failedproblem bad level.
  • Data analyze and prepare the software punch list for the customer.  Site troubleshooting with TI Partners.  Supervised riggers at the Site Audits. This involved in the pictures of the Site, pictures of the antennas etc.  Checking orientation and adjustment as well as checking and adjustment of mechanical and electrical tilts.   Also supervised to the changes while sector orientation.  Coordinate with BSS teams to resolve issues, such as handover failures, Frequency interference, drop call and low lower TRXs.
  • Identified Causes of RF Interference  Identified causes of poor coverage, and made recommendations about the orientation changes, electrical and mechanical tilts.  Perform data service test according to the project requirements.  To collect and analyze subscriber complaint, locating the network problem and solve the problems






Swissqual Training :-

                                                       Worked as trainee on SwissQual tool.

Diversity Bench marker :-

This tool is used for  True Bench marking i.e.  we having Eight CSMs (computer sliding module)  in  Diversity Bench marker and each CSM connects with Two ASMs (Audio sliding modules) i.e Samsung galaxy s3 mobiles and as a result we can test  etc on Sixteen Device at the same time along with Eight  data cards.

This tool  Can perform  double-sided” jobs  Intrusive ,call to PSTN etc CE measurements for youtube testing, skype testing, voice and video call quality testing with POLQA and PESQ standards

Also worked on  Diversity optimizer and NQDI Software  for  Analyzing and optimization.



Worked as  LTE DTE  in Alcatel Lucent Deployment STC Project North

( DEC 2012 to JAN 2014)

 Key responsibilities include

  •  Static, Mobilty  CSFB Ping, RRC (Attached/detected)  tests for  TDD,FDD Sites Using  TEMS investigation 15.3, 14.5, 13.0.1
  • Monitoring & Ensuring consistent RSRP, RSRQ and CINR parameters performance for better coverage of the site
  • Performed Single Site verification:
  • Drive test with 500m range
  • Analysis of log file with layer 3 messages
  • Speed test analyzing and throughput attend by the site on each sector
  • Intra-handover and inter hand over.
  • Checking orientation and adjustment as well as checking and adjustment of
  •  mechanical and electrical tilts

        

 

    Apr 2010Jul 2012

    BSS & Transmission Engineer

    TIER4

    TIER-4 Pvt.LTD.

    Working as a BSS & Transmission Engineer                                                           (1st april 2010 to 31st july2012)    

    Working area

    UFONE PROJECT

    • Installation of BTS 3900,DBS3900(RF antennas, feeder cable, DRFU/GRFU
    • DRRU/GRRU as per RF Plane).
    • Installation and commissioning of BTS (3012,3012AE,) of HUAWEI
    • Expansions of BTS
    • Use of Site Master and Power meter(For VSWR alarms and Troubleshooting of VSWR)
    • Installation of DDF and all alarms
    • Call Testing
    • Alarm patching, Testing & Troubleshooting
    • Perform BTS cutover activities (Connect RF Antenna & feeder cable to New BTS).
    • Perform alarms verification (Power alarms, Gen Set alarms, Environmental alarms)
    • Trouble shooting of BTS.
    • Installation and integration of Rectifier and Battery Bank.
    • Perform Call, GPRS/EDGE test.
    • Alarms Trouble Shooting & Power Test.
    • Perform Pre-ATP and ATP (Acceptance Test Procedure)
    • Co-ordination with the vendor

    TRANSMISSION

    • Work as a team leader in Projects in North Region.
    • Currently Handle IF1B Batch Replacement (RTN 620) Project.
    • Supervision of installation of PDH & SDH microwave equipment at sites.
    • Installation RTN 620, 910 and 950 PDH, STM & XPIC Microwave links (1+0, 1+1, 2+0).
    • Commissioning of RTN 620, 910 and 950 PDH, STM & XPIC Microwave using T2000 & U2000.             
    • Alarms patching and verification on Microwave RTN 620.
    • Installation of the NEC Microwave.
    • Commissioning of the NEC Microwave.
    • Perform BER Test on E1.
    • Trouble shooting of RTN Microwave.
    • Performed Media patching.
    • End to End Media clearance.(BSC to end Sites)

    TELENOR PROJECT

    •  Performed Hardware installation & BTS3900 & DBS3900.
    •  Performed Commissioning of BTS3900 & DBS3900
    •  Performed BTS3900, 3900A & DBS3900 Swap for Huawei.
    •  Performed Alarms patching and verifications.(software BTS MANAGER/ LMT)
    •  Perform Call, GPRS/EDGE test.
    •  Installation RTN 910 and 950
    •  Performed Commissioning of RTN 950&910.(software Web LCT)
    •  Performed End To End Media Patching.
    •  Performed Individuals ATP’s.

    MOBILINK  PROJECTS With  

    Huawei Mobilink phase 3 project Sahiwal

    Huawei Mobilink phase 4 project Gujranwala

    Huawei Mobilink phase 8 project islamabad

    • Technical Support & Coordination with field Engineers.
    • Performed BTS3900 & DBS3900 Swap for Huawei.
    • Performed Hardware installation & Commissioning of BTS3900 & DBS3900.
    • Performed transmissiom shifting of NEC Passslolink,NEC Neo from indoor to outdoor.
    • Performed Alarms patching and verifications.(software BTS MANAGER/ LMT)
    • Performed Individuals ATP’s