To obtain a challenging position in a high quality engineering environment as a Project Management Executive where my resourceful experience and academic skills will add value to organisational operations. I am able to learn, understand and adapt to any industries or environment. I am experienced in planning, monitoring, tracking, control and reporting.

Work experience

May 2015Current

Planning Engineer

Principle Perspective Engineering Sdn Bhd
  • Schedule preparation – Tender, Bidding, Level 1, Level 2, Level 3 and Level 5
  • Project Planning using Microsoft Project and Vico Schedule Planner Standard 2013
  • S-Curve preparation, tracking, monitoring and controls
  • Producing manpower and manhour histogram
  • Daily tracking and submission of progress summary for all trades involved
  • To produce progress report to the client
  • To produce 2 weeks look ahead
  • To produce detailed delayed task and upcoming task completion report
  • Leading a 3 man team in the project planning and tracking department
February 2014March 2015

Project Controller

ProSep (Asia Pacific) Sdn Bhd
  • To plan and implement in-house and tendered projects.
  • To support in preparation and execution of Project Execution Plan
  • To brainstorm and design new project management and control framework for the Asia Pacific region
  • Project Planning using Safran Project professional
  • To assist in planning and monitoring of manpower planning for the subcontractor
  • To prepare and execute of project budget as per Project Execution plan
  • Monitoring and control of man-hour expenditure
  • To develop level 1 and level 2 bidding schedule for proposals
  • To develop level 3,4 and 5 schedule with resource loaded
  • Cost control of all projects.
  • To build a S-Curve and report estimated and actual progress percentage
  • To prepare and report the total cost estimate for all projects.
  • To prepare and consolidate the tracking log for all projects
  • To track and report for the fabrication and engineering progress for the projects
  • To report overall project progress in weekly and monthly report
  • Attended 1 month of interview in Houston, USA for Safran Project
August 2012January 2014

Planning Engineer

KNM Exotic Equipments Sdn Bhd
  • Building Level 1 and Level 2 schedule for new project bidding
  • Building Level 3 schedule for new confirmed project
  • Building Level 4 and Level 5 schedule for ongoing project
  • Review & prepare project scheduling based on activities, manpower, equipment, consumables & other resources loading.
  • Planning manpower Loading for all ongoing project
  • Planning Shop Floor Loading and its projection to the future.
  • Monitoring ongoing project
  • Review & prepare project scheduling based on activities, manpower, equipment, consumables & other resources loading.
  • Preparing Weekly Report, detailed Monthly Report and Client Report
  • Preparing Shop Floor Layout with vessel arrangement using AutoCAD
  • Chairing weekly progress meeting and preparing minutes of meeting
  • Preparing and monitoring of Production, Procurement, Engineering and Quality Assurance S-Curve
  • Preparing fabrication checklist.
  • Resource Leveling
  • Handled all this for :-
    • Technip FLNG
    • Saipem Snamprogetti
    • Foster Wheeler Sadara Project
    • Worley Parson Point Thompson Project
    • Foster Wheeler Bibiyana Project
    • Luke Oil Gissar Project
    • Arkema Lychee Project

           Shell Bukom Refinery Project

January 2012 July 2012

Planning & Scheduling Engineer

Shin Eversendai Engineering Sdn Bhd

-Planning for crane movement and manpower distribution.

-Planning for steel structure erection sequence.

-Scheduling for incoming materials and erection of materials.

-Daily Report, Weekly Report and Monthly Report preparation.

-Submission of paper works for steel structure cost claiming.

-Permit to Work application and submission.

-Document controlling for engineering and fabrication shop drawings

-Producing S-Curve for erection progress monitoring – Planned and Actual Cumulative graph

-Planning using Microsoft Project  2010

-Involved with the 1 X 1000 MW Manjung Power Plant new Boiler and Turbine construction in Malaysia

-Involved with the fabrication for Oil and Gas steel structure 

July 2010 September 2011

Planning and Scheduling Engineer

SHIN EVERSENDAI Engineering Sdn Bhd (Fabrication Yard)
  • Planning and progress recording for steel structure fabrication
  • Keeping track of steel structure member need for project team at site and delivering on time
  • Planning using Microsoft Project 2007
  • Submitting steel structure claiming report to client

Projects

Project : Construction of First Solar Production Plant

Scope : Project Management, Engineering and Construction for  Substructure, and Superstructure.

Client : UGL

Time Period : 15th August 2016 – Ongoing

Project : Construction of Infineon Melaka

Scope : Project Management, Engineering, Procurement, Manufacturing and Construction for  Substructure, and Superstructure.

Client : IAQ Project Management

Time Period : 15th January 2016 – Ongoing

Project : Construction of Kibing

Scope : Project Management

Client : Kibing Group

Time Period : 3rd December 2015 – 12th June 2016

Project : Construction of Matrix Flavors

Scope : Engineering, Procurement and Construction for Substructure and Superstructure.

Client : IAQ Project Management

Time Period : 28th October 2015 – Ongoing

Project : Construction of Kellogg Asia Products

Scope : Engineering, Procurement, Manufacturing and Construction for  Substructure, Superstructure, Steel Structure, Mechanical, Pipping, Electrical, Instrumentation, Fire Fighting, Landscaping and Wastewater Plant.

Client : Tebodin Billfinger Malaysia

Time Period : 5th May 2015 – 12th November 2015

Project : TLP Malikai Deepwater Project

Scope : Engineering, Procurement, Manufacturing and Commissioning for Multimedia Backwashable Fine Filter Package

Client : Malaysia Marine and Heavy Engineering Sdn. Bhd. (MMHE) with Technip Geoproduction (M) Sdn Bhd

Owner : Sabah Shell Berhad and Sarawak Shell Petroleum Co Ltd

Value :  RM 10 million

 

Project : VESTIGO LPV/MISC MaMPU Project

Scope : Engineering, Procurement and Manufacturing for Hydrocyclone Vessel

Client : NGL Tech Sdn Bhd and MISC Berhad

Owner : Vestigo Petroleum Sdn Bhd

Value :  RM  700 thousand

Project : SK316 NC3 Oilfield Development Project

Scope : Engineering, Procurement, Manufacturing and Commissioning for Produced Water Treatment Package and N2 Generation Skid

Client : Malaysia Marine and Heavy Engineering Sdn. Bhd. (MMHE) with Technip Geoproduction (M) Sdn Bhd

Owner : Petronas Carigali Sdn Bhd

Value :  RM 11 million

Project : 1 X 1000MW Manjung 4 Power Plant, Lumut, Perak

Scope : 3300 Tonnes Steel Structure Design, Fabricate, Supply and Erection

Client : Alstom Sdn Bhd and CMC Machipex Sdn Bhd

Owner : Tenaga Nasional Berhad (TNB) Sdn Bhd

Education