Download PDF

Summary

To succeed in an environment of growth and excellence which provides me self development and help me achieve personal as well as organizational goals.

Work History

Aug 2012Present

Mechanical Maintenance

Tata Chemicals Ltd

1.Executing day to day plant mechanical maintenance activities(planned & unplanned) with proper co- ordination with process department.
2.Daily and Weekly job planning,execution of day to day activities( manpower,material & availability of machines).
3.Shutdown job planning,contractor management,execution and report generation.
3.Execution of Capex Job sanctioned in the plant (Code creation,consultation with supplier,drawing checking,finalization,purchase requisition(material and service) & execution of job and report generation)
4.restrict the unplanned downtime(including breakdowns) of the the plant through LLF, & predictive maintenance.
5.Preventive maintenance & Lubrication Schedule plan establishment,review,scheduling & monitoring its notification and closure through SAP ECC 7.0.6.0 (PM Module).
6.Controlling of the mechanical maintenance R & M budget(material & service) within the specified limit(planned annual budget).
7.To assist team leader for RCA & Failure analysis of major mechanical breakdowns.
8.Maintaining of daily day to day activities documented like daily log book(date wise),history card(equipment wise)at SAP, drawings.
9.Improvement 5s score
10.To assist/lead the various internal initiative projects of plant like, Unnati,SRESHTO.
11.Ensuring safe execution of the job,at the field & closure of near misses at field as well as in the system(reported).

12.Spare part management(material PR,Quality checking & approval at Store) of critical equipment's & contractor management

13.To assist manager for various audits like,ISO,TBEM,Internal SRESHTO Audit,BSC-5 Star Audit.

14.To conduct daily morning safety talk at shop floor addressing about job related hazards planned on that day & review of safety performance of previous day.

Equipments Maintained

Ball Mill;Roller Mill;Den Conveyor;Mixer;RP Den;Den Cutter;EOT Crane;Belt Conveyors;Weigh feeder;Cyclone Separator;Centrifugal Bucket Elevator;Fans;Pumps;Bagfilter;Rotary Valves;Screw Conveyor;Lump Crusher;Vibro Screen;Slicer;Grit Sepataror

Education

Aug 2008Jul 2012

B.Tech(Mechanical Engineering)

Haldia Institute of Technology

West Bengal University of Technology;2012;Degree Grade Point Average- 8.65,Equivalent Percentage-79%

Jul 2005Jul 2007

Higher Secondary Education

Manindranath High School

West Bengal Council of Higher Secondary Education(WBCHSE);Percentage of Marks- 77%

Jul 2003Jun 2005

Secondary Education

Jenkins School

West Bengal Board of Secondary Education(WBBSE);Percentage of Marks- 74.125%

Training

Jan 2013Feb 2013

SHE Star

Tata Chemicals Ltd

Industrial Safety & Environment Training Programe

Jun 2011Jun 2011

Industrial Training

Steel Authority of India Limited

Summer Training at Durgapur Steel Plant,Durgapur;Steel Authority of India Limited

Jan 2011Jan 2011

Computer Numeric Control Programming

Indo Danish Tool Room - MSME,Jamshedpur;

CNC Turning(FANUC) at Indo Danish Tool Room - MSME,Jamshedpur;Manual programming codes of FANUC
language, Canned Cycle;January- 2011

Jun 2010Jul 2010

​Industrial Training

​Damodar Valley Corporation

Summer Training at Coal fired thermal power station,Mejia;Damodar Valley Corporation

Projects

1.Establishing Bill of Material of Plant Equipment & incorporation of it on SAP

2.Upgradation of Rock circuit of SSP Plant(Ball Mill Cyclone, Grit Separator & Roller mill Cyclone replacement along with associated ducts)

3.Upgradation of Scrubber Tank at SSP Plant 

4.Conveying System(Rock Phosphate) improvement( Underground Screw Conveyor replacement with belt conveyor)

5.SSP Bagging Bucket Elevator feed conveyor replacement 

6.ID Fan casing replacement 

7.Unnati Project -Improvement of safety & spillage reduction at SSP New Bagging Plant

8.Unnati Project-Improvement of safety & GHK at Compressor House

9.Unnati Project-Improvement of throughput & Spillage reduction at SSP Bagging Plant