Dana Kadri

Work History

Work History


ARC Design

 Five Floors Residential Building contains three apartments in each floor with different 2 2 areas and plans(160 m-240 m). Responsibilities: Prepare information regarding design, specifications, materials and equipment. Prepare folder of implementation. Liaising with the clients, contractors and builders and ensuring the smooth running of every day operations. Review architectural documents for potential conflict with all disciplines.

The New Mosque of Dubai: A competition to design the new mosque in Dubai with a total area of 1800 m2. Responsibilities: Conduct research needed to complete architectural design. Study the urban planning of the location of project. Develop design ideas and create design presentations. Build 3D conceptual design. Build Cad drawing for plans sections elevations for the concept design. 

Architect-Designer, Yangon Hotel

NDP Design

Study the possible architectural Rehabilitation of an old building in Yangon- Burma to become a seven stars hotel. Conduct research needed to complete architectural design. Redesign the building plans and elevations to be convenient with the new function. Submit illustrated images of the new design. 

May 2014 - Present

Site Engineer, New International Airport of Senegal

Saudi Benladin Group (SBG)

Responsible of the Presidential Pavilion, Fire Station and Haj Terminal Buildings.

Acting as main technical advisor on the construction site for subcontractors, crafts people, resolve problems, and issues that arise during work.

Submit work inspections to the consultant and third party.

Follow up the subcontractors to submit all relevant material submissions and method statements on time.

Follow inspections and test plan(ITPs) for the constructed work. Coordinate with all subcontractors to finish work at site and arrange work flow.

Analyze tolerance levels within the structure and all finishing works. Liaising with the consultant and the clients representatives(architects, engineer) and attend regular meetings.

Oct 2013 - May 2014

Architectural Engineer, New International Airport of Senegal

Saudi Benladin Group(SBG)

Project Manager Asst. as Finishing Engineer.

Work with the Project Manager to develop and implement the work flow for all of the project buildings(Main Terminal, Control Tower, Presidential Pavilion, Fire Station and the other 15 service buildings).

Verify completed finishing work on site to insure that all of the installed materials are as per design specifications and arrange payments.

Prepare shop drawings for required new items, design changes, and submit it to consultants.

Attend meetings with consultants, client and subcontractors and prepare minutes of meetings.

Prepare BOQ s of all the doors and steel work(handrails, foot rails) of the project and compare the subcontractor's technical and commercial offers to choose the best offers.

Coordinate with different subcontractors from around the world to advice for extra information if needed, and negotiate commercial offers.

Jan 2013 - Aug 2013

Designer, Massar Rose

Henning Larsen Architect & Syria Trust Dev.

Contribute to the creation of the site's design philosophy. Participate in the creation of design concepts according to the project's vision. Carrying out research work to provide needed technical information. Meeting target group needs by developing interactive activities' design. Conduct preliminary studies of the site.

Nov 2011 - Jan 2013

Architect-Desigher, Darmesk Complex

NDP Design

Conduct architectural studies developing the design concept of DARMESK Residential and social complex with 2500 habitat unit and contains Hotel, Spa, Mall, Mosque, Kindergarten and administrative buildings.

Design the project' Mosque, Administration building, Municipality building and Labor Accommodation.

Build 3D conceptual design and prepared detailed design drawings of the four mentioned buildings.

Consult with client to determine functional and spatial requirements of project. Coordinate with structural and electro-mechanical engineers. 

Jun 2010 - Jul 2011

Architect-Designer, Alabed Mall

ARC Design

Worked on the rehabilitation of Al Abed mall and redesign the exterior mass of the building to become a modern architectural design.

Produce as-build CAD drawings based on the site measurements. Create and develop the design ideas.

Help to monitor the flow of development activities to ensure the completion of architectural work for new construction.


2005 - 2011


Damascus University Faculty of Architecture









Architectural Finishing