Christopher Foote

Work History

Work History
Oct 2005 - Feb 2009

Director, Subcontracts/Construction Manager

CHICAGO BRIDGE AND IRON (CB&I)

Director, Subcontracts, USA Operations

  • Managed and implemented subcontract policies, procedures, methods, and operating practices of all CBI USA regional offices (Tyler, Beaumont and Houston, Texas and Plainfield, Illinois), as well as all construction jobsites nationwide.
  • Prepared complex bids requiring integration of proposals from multiple subcontractors and other potential vendors.
  • Performed training, motivation, and evaluation of assigned employees.
  • Implemented and audited subcontract responsibilities within corporate policies and regulatory requirements.
  • Provided advice and support on major bids through staff acquisition and resource planning.
  • While constantly maintaining delivery dates and quality, directed staff on budgetary responsibilities within scope of subcontract operations.
  • With projects ranging from $28 million to $100 million, located from coast to coast, responsibilities included the consolidation of inter-division policies and procedures thereby assisting in financial savings to CB&I and resulting in improved operating efficiency.

Construction Manager

  • Managed subcontract policies, procedures, methods, and operating practices of Tyler, TX regional office, as well as all construction jobsites for projects throughout the USA originating from the Tyler office.
  • Guaranteed contractor compliance with construction documents and specifications to ensure high quality standards and commercial compliance.
  • Reviewed and approved subcontractor pay requests and managed all facets of change order approval process.
  • Managed the process of assembling, soliciting, analyzing, and awarding project bid packages.
  • Conducted all personnel related activities associated with a direct-hire environment.
  • Performed and maintained close client contact and project sales responsibilities.
Aug 2004 - Oct 2005

National Director

UNITED METHODIST ACTION REACH-OUT MISSION BY YOUTH

(This career move was a break in service, later bridged by CB&I)

  • Provided an opportunity for youth and adults to experience Christian growth through mission, worship and fellowship.
  • Coordinated summer work camps in Texas, Arkansas, Massachusetts, and Florida which allowed participants to combine their strengths to meet home repair and maintenance needs of those unable to help themselves.
Jun 2002 - Aug 2004

Construction Coordinator

CBI HOWE-BAKER – HOWE-BAKER ENGINEERS, LTD.
  • Guaranteed contractor compliance with construction documents to ensure high quality standards and commercial compliance.
  • Reviewed and approved subcontractor pay requests and managed all facets of change order approval process.
  • Managed the process of assembling, soliciting, analyzing, and awarding project bid packages.
  • Conducted all personnel related activities associated with a direct-hire environment.
  • Performed and maintained close client contact and project sales responsibilities.
Aug 1997 - Jun 2002

Project Administrator/Project Engineer

AUSTIN COMMERCIAL, INC.
  • Reviewed and approved shop drawings, product samples, mix designs, and numerous other construction materials associated with the structural and architectural finish-out phase of construction.
  • Directed coordination of field activities, material suppliers and subcontractors.
  • Acted as liaison between engineers, architects, clients, subcontractors, planning, and scheduling.
  • Responsible projects included $46 million DFW International Airport Terminal D/APM Project (APM), $200 million American Airlines Center Arena, $35 million SMU Meadows Museum, and $200 million Intel Fab. 16 Wafer Fabrication Facility.
Jun 1989 - Aug 1997

Planner/Scheduler

BROWN AND ROOT, USA
  • Oversaw project controls, including cost, planning and scheduling for large Engineering, Procurement, Construction (EPC) projects as well as for Maintenance Operations within operating Petrochemical facilities.
  • Analysis of project cost, planning and scheduling for content, interpretation and reporting.
  • Supervised daily operations of the polyethylene area planning and scheduling office.
  • Coordinated operations between offices staffed by eight planner/schedulers who generated and maintained an average of 4,500 maintenance work orders per month.
  • Projects included $100 million NutraSweet Aspartame Expansion Facility, $600 million Inland Container Corp Mill Modernization Project, Inventory Tracking and Shipping System for Brown & Root Information Technology, and $1.2 billion Greater Houston Wastewater Project, Capital Projects Program at Texas Eastman, Longview, Texas.
May 1985 - Jun 1989

Draftsman/Resident Project Representative

A.C. ASSOCIATES, INC./PARKHILL, SMITH & COOPER, INC.
  • Drafted and coordinated civil, architectural and structural drawings and interpreted structural calculations.
  • Offered field inspection and design services, including surveying, occasional field design modification, coordination of material testing lab visits, inspection and approval of lab test results, and design conformance verification of shop drawings.
  • Projects included wastewater treatment plants, underground utility relocation, road and bridge construction, and city road maintenance.
  • Acted as engineering representative for clients including city governments of Abernathy, Brownfield, Levelland and Rankin, Texas and various other cities throughout West Texas.
  • Maintained full time college student status at Texas Tech University (1985-1987).Full time employment thereafter.
Aug 1984 - May 1985

Draftsman

FANNING, FANNING, AND AGNEW, INC.
  • Drafted mechanical and electrical construction drawings.
  • Maintained full time college student status at Texas Tech University during tenure.
May 1980 - Aug 1984

Draftsman

KILLEBREW AND ASSOCIATES, INC.
  • Drafted and coordinated architectural and structural drawings and interpreted structural calculations.
  • Maintained full time college student status at Midwestern State University, then, Texas Tech University during tenure.

Education

Education
May 1982 - May 1987

Bachelor of Science

Texas Tech University

Skills

Skills

Primavera

Proficient in the use of Primavera software for Planning/Scheduling.

Microsoft Office Suite

Proficient in the use of all software as contained within the Microsoft Suite.

AutoCAD

Certifications

Certifications
Dec 2008 - Present

Certificate of Completion-Project Management Program (PMP)

CB&I
May 1991 - May 1995

Certified Engineering Technologist

National Institute for the Certification in Engineering Technologies (NICET)