Over five years of experience in Electro - Mechanical plant construction and related construction and erection works. Experienced in direct supervision and control of all activities involved in Scaffolding, Piping, Painting, Fireproofing and Insulation works. Hands on Knowledge in Construction Analysis and methodologies on shop fabrication and field erection and implementation of project policies and procedures.

Work History

Work History
Dec 2011 - Present

Piping Engineer / Welder

Keangnam Enterprises Ltd

- Responsible for Weld mapping of iso drawings.

- Preparation of marked - up P & ID prior to hydro test package, review documents including pipe support installation, mechanical clearance checklist and other related attachments.

- Coordinate daily with client QC representative for NDE discrepancies issues.

- Line checking in concern with actual site pipe installation and modify iso drawings, if necessary, leading to as-built.

- Walk down of line system regarding punchlist, issued by client and ensures that quality standards are observed before the actual testing begin.

- Applies the final procedures approved by the client.

Mar 2010 - Mar 2011

Piping Engineer / Welder

Guemwha Psc Ltd

- Check that all project documents that are maintained in the site and pipe shop are the latest revision before commencement of work. Continuously check and review the changes status during the work.

- Modifications of fabrication drawing and piping routing based on latest equipment outline according to design in progress.

- Responsible in making welding map, hydro test package and everyday inspection report.

- Preparation of P& ID, piping plans, isometric and spool drawings and check as-built on site conditions and control of hydro test packages.

- Preparation of isometric drawings and material take off from drawings.

- Preparation of periodic special reports summarizing engineering - related issues related to piping installation, testing and acceptance.

Jun 2006 - Dec 2009

Piping Engineer / Welder

Al-Rushaid Const Co. Ltd.

- Assign to pipe fabrication shop to monitor and supervise the inspector's quality activities to ensure compliance to the relevant inspection and test plan.

- Ensure the completion of shop fabrication on time as per given schedule.

- Relevant international standards and codes of practice normally used by the mechanical engineering field in the oil and gas industry such as API, ANSI and ASME.

- Coordinate and interfacing with other discipline and subcontractors.

- Supervision of the pipe installation and erection team during project phase.

- Carries out and assists with punch listing.

- Ensure compliance at all times with the company's environmental health and safety procedures and safety regulations similarly compliance with security.

Apr 2004 - May 2006

Project Engineer

Enertech Systems Industries Inc

- Head project meetings to collect and disseminate information pertaining to projects.

- Technical Specification review and resolution.

- Coordinate the collection and dissemination of technical information between / within the company and customer.

- Ensure that project charges are correctly represented for accounting's closing process.

- Directs and supervises other engineering activities.

- Evaluates project performance of functional areas.

- Monitor program cost activity to achieve an "in budget" result.

Mar 2003 - Mar 2004

Production Engineer

CMC Magnetics Corporation
May 2002 - Feb 2003

Maintenance Engineer

Coca-Cola Bottler Philippines

Education

Education
Jul 1999 - Apr 2002

Bachelor of Science

University of Luzon
Jan 1994 - Dec 1997

Associate Degree

Pangasinam Merchant Marine Academy